CINXE.COM

Search results for: integrated maintenance techniques

<!DOCTYPE html> <html lang="en" dir="ltr"> <head> <!-- Google tag (gtag.js) --> <script async src="https://www.googletagmanager.com/gtag/js?id=G-P63WKM1TM1"></script> <script> window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'G-P63WKM1TM1'); </script> <!-- Yandex.Metrika counter --> <script type="text/javascript" > (function(m,e,t,r,i,k,a){m[i]=m[i]||function(){(m[i].a=m[i].a||[]).push(arguments)}; m[i].l=1*new Date(); for (var j = 0; j < document.scripts.length; j++) {if (document.scripts[j].src === r) { return; }} k=e.createElement(t),a=e.getElementsByTagName(t)[0],k.async=1,k.src=r,a.parentNode.insertBefore(k,a)}) (window, document, "script", "https://mc.yandex.ru/metrika/tag.js", "ym"); ym(55165297, "init", { clickmap:false, trackLinks:true, accurateTrackBounce:true, webvisor:false }); </script> <noscript><div><img src="https://mc.yandex.ru/watch/55165297" style="position:absolute; left:-9999px;" alt="" /></div></noscript> <!-- /Yandex.Metrika counter --> <!-- Matomo --> <!-- End Matomo Code --> <title>Search results for: integrated maintenance techniques</title> <meta name="description" content="Search results for: integrated maintenance techniques"> <meta name="keywords" content="integrated maintenance techniques"> <meta name="viewport" content="width=device-width, initial-scale=1, minimum-scale=1, maximum-scale=1, user-scalable=no"> <meta charset="utf-8"> <link href="https://cdn.waset.org/favicon.ico" type="image/x-icon" rel="shortcut icon"> <link href="https://cdn.waset.org/static/plugins/bootstrap-4.2.1/css/bootstrap.min.css" rel="stylesheet"> <link href="https://cdn.waset.org/static/plugins/fontawesome/css/all.min.css" rel="stylesheet"> <link href="https://cdn.waset.org/static/css/site.css?v=150220211555" rel="stylesheet"> </head> <body> <header> <div class="container"> <nav class="navbar navbar-expand-lg navbar-light"> <a class="navbar-brand" href="https://waset.org"> <img src="https://cdn.waset.org/static/images/wasetc.png" alt="Open Science Research Excellence" title="Open Science Research Excellence" /> </a> <button class="d-block d-lg-none navbar-toggler ml-auto" type="button" data-toggle="collapse" data-target="#navbarMenu" aria-controls="navbarMenu" aria-expanded="false" aria-label="Toggle navigation"> <span class="navbar-toggler-icon"></span> </button> <div class="w-100"> <div class="d-none d-lg-flex flex-row-reverse"> <form method="get" action="https://waset.org/search" class="form-inline my-2 my-lg-0"> <input class="form-control mr-sm-2" type="search" placeholder="Search Conferences" value="integrated maintenance techniques" name="q" aria-label="Search"> <button class="btn btn-light my-2 my-sm-0" type="submit"><i class="fas fa-search"></i></button> </form> </div> <div class="collapse navbar-collapse mt-1" id="navbarMenu"> <ul class="navbar-nav ml-auto align-items-center" id="mainNavMenu"> <li class="nav-item"> <a class="nav-link" href="https://waset.org/conferences" title="Conferences in 2024/2025/2026">Conferences</a> </li> <li class="nav-item"> <a class="nav-link" href="https://waset.org/disciplines" title="Disciplines">Disciplines</a> </li> <li class="nav-item"> <a class="nav-link" href="https://waset.org/committees" rel="nofollow">Committees</a> </li> <li class="nav-item dropdown"> <a class="nav-link dropdown-toggle" href="#" id="navbarDropdownPublications" role="button" data-toggle="dropdown" aria-haspopup="true" aria-expanded="false"> Publications </a> <div class="dropdown-menu" aria-labelledby="navbarDropdownPublications"> <a class="dropdown-item" href="https://publications.waset.org/abstracts">Abstracts</a> <a class="dropdown-item" href="https://publications.waset.org">Periodicals</a> <a class="dropdown-item" href="https://publications.waset.org/archive">Archive</a> </div> </li> <li class="nav-item"> <a class="nav-link" href="https://waset.org/page/support" title="Support">Support</a> </li> </ul> </div> </div> </nav> </div> </header> <main> <div class="container mt-4"> <div class="row"> <div class="col-md-9 mx-auto"> <form method="get" action="https://publications.waset.org/abstracts/search"> <div id="custom-search-input"> <div class="input-group"> <i class="fas fa-search"></i> <input type="text" class="search-query" name="q" placeholder="Author, Title, Abstract, Keywords" value="integrated maintenance techniques"> <input type="submit" class="btn_search" value="Search"> </div> </div> </form> </div> </div> <div class="row mt-3"> <div class="col-sm-3"> <div class="card"> <div class="card-body"><strong>Commenced</strong> in January 2007</div> </div> </div> <div class="col-sm-3"> <div class="card"> <div class="card-body"><strong>Frequency:</strong> Monthly</div> </div> </div> <div class="col-sm-3"> <div class="card"> <div class="card-body"><strong>Edition:</strong> International</div> </div> </div> <div class="col-sm-3"> <div class="card"> <div class="card-body"><strong>Paper Count:</strong> 10751</div> </div> </div> </div> <h1 class="mt-3 mb-3 text-center" style="font-size:1.6rem;">Search results for: integrated maintenance techniques</h1> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10751</span> The Integrated Methodological Development of Reliability, Risk and Condition-Based Maintenance in the Improvement of the Thermal Power Plant Availability</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Henry%20Pariaman">Henry Pariaman</a>, <a href="https://publications.waset.org/abstracts/search?q=Iwa%20Garniwa"> Iwa Garniwa</a>, <a href="https://publications.waset.org/abstracts/search?q=Isti%20Surjandari"> Isti Surjandari</a>, <a href="https://publications.waset.org/abstracts/search?q=Bambang%20Sugiarto"> Bambang Sugiarto</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Availability of a complex system of thermal power plant is strongly influenced by the reliability of spare parts and maintenance management policies. A reliability-centered maintenance (RCM) technique is an established method of analysis and is the main reference for maintenance planning. This method considers the consequences of failure in its implementation, but does not deal with further risk of down time that associated with failures, loss of production or high maintenance costs. Risk-based maintenance (RBM) technique provides support strategies to minimize the risks posed by the failure to obtain maintenance task considering cost effectiveness. Meanwhile, condition-based maintenance (CBM) focuses on monitoring the application of the conditions that allow the planning and scheduling of maintenance or other action should be taken to avoid the risk of failure prior to the time-based maintenance. Implementation of RCM, RBM, CBM alone or combined RCM and RBM or RCM and CBM is a maintenance technique used in thermal power plants. Implementation of these three techniques in an integrated maintenance will increase the availability of thermal power plants compared to the use of maintenance techniques individually or in combination of two techniques. This study uses the reliability, risks and conditions-based maintenance in an integrated manner to increase the availability of thermal power plants. The method generates MPI (Priority Maintenance Index) is RPN (Risk Priority Number) are multiplied by RI (Risk Index) and FDT (Failure Defense Task) which can generate the task of monitoring and assessment of conditions other than maintenance tasks. Both MPI and FDT obtained from development of functional tree, failure mode effects analysis, fault-tree analysis, and risk analysis (risk assessment and risk evaluation) were then used to develop and implement a plan and schedule maintenance, monitoring and assessment of the condition and ultimately perform availability analysis. The results of this study indicate that the reliability, risks and conditions-based maintenance methods, in an integrated manner can increase the availability of thermal power plants. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques" title="integrated maintenance techniques">integrated maintenance techniques</a>, <a href="https://publications.waset.org/abstracts/search?q=availability" title=" availability"> availability</a>, <a href="https://publications.waset.org/abstracts/search?q=thermal%20power%20plant" title=" thermal power plant"> thermal power plant</a>, <a href="https://publications.waset.org/abstracts/search?q=MPI" title=" MPI"> MPI</a>, <a href="https://publications.waset.org/abstracts/search?q=FDT" title=" FDT "> FDT </a> </p> <a href="https://publications.waset.org/abstracts/26806/the-integrated-methodological-development-of-reliability-risk-and-condition-based-maintenance-in-the-improvement-of-the-thermal-power-plant-availability" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/26806.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">794</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10750</span> Strategic Maintenance Management of Built Facilities in an Organisation</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Anita%20D.%20Adamu">Anita D. Adamu</a>, <a href="https://publications.waset.org/abstracts/search?q=Winston%20M.%20W.%20Shakantu"> Winston M. W. Shakantu</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Maintenance management is no longer a stand-alone activity. It has now assumed a strategic position in many organisations that have recognised its importance in achieving primary goals and a key aspect of effective management of facilities. This paper aims at providing an understanding of the role and function of strategic management in creating and sustaining an effective maintenance management system in an organisation. The background provides an articulated concept and principles of strategic management. The theoretical concepts paved way for a conceptual framework for which strategic management can be integrated into the maintenance management system of an organisation to improve effectiveness in the maintenance of facilities. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=facilities" title="facilities">facilities</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance%20management" title=" maintenance management"> maintenance management</a>, <a href="https://publications.waset.org/abstracts/search?q=organisations" title=" organisations"> organisations</a>, <a href="https://publications.waset.org/abstracts/search?q=strategic%20management" title=" strategic management"> strategic management</a> </p> <a href="https://publications.waset.org/abstracts/40969/strategic-maintenance-management-of-built-facilities-in-an-organisation" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/40969.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">409</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10749</span> Application of IED to Condition Based Maintenance of Medium Voltage GCB/VCB</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Ming-Ta%20Yang">Ming-Ta Yang</a>, <a href="https://publications.waset.org/abstracts/search?q=Jyh-Cherng%20Gu"> Jyh-Cherng Gu</a>, <a href="https://publications.waset.org/abstracts/search?q=Chun-Wei%20Huang"> Chun-Wei Huang</a>, <a href="https://publications.waset.org/abstracts/search?q=Jin-Lung%20Guan"> Jin-Lung Guan</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Time base maintenance (TBM) is conventionally applied by the power utilities to maintain circuit breakers (CBs), transformers, bus bars and cables, which may result in under maintenance or over maintenance. As information and communication technology (ICT) industry develops, the maintenance policies of many power utilities have gradually changed from TBM to condition base maintenance (CBM) to improve system operating efficiency, operation cost and power supply reliability. This paper discusses the feasibility of using intelligent electronic devices (IEDs) to construct a CB CBM management platform. CBs in power substations can be monitored using IEDs with additional logic configuration and wire connections. The CB monitoring data can be sent through intranet to a control center and be analyzed and integrated by the Elipse Power Studio software. Finally, a human-machine interface (HMI) of supervisory control and data acquisition (SCADA) system can be designed to construct a CBM management platform to provide maintenance decision information for the maintenance personnel, management personnel and CB manufacturers. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=circuit%20breaker" title="circuit breaker">circuit breaker</a>, <a href="https://publications.waset.org/abstracts/search?q=condition%20base%20maintenance" title=" condition base maintenance"> condition base maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=intelligent%20electronic%20device" title=" intelligent electronic device"> intelligent electronic device</a>, <a href="https://publications.waset.org/abstracts/search?q=time%20base%20maintenance" title=" time base maintenance"> time base maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=SCADA" title=" SCADA"> SCADA</a> </p> <a href="https://publications.waset.org/abstracts/12921/application-of-ied-to-condition-based-maintenance-of-medium-voltage-gcbvcb" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/12921.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">329</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10748</span> An Appraisal of Maintenance Management Practices in Federal University Dutse and Jigawa State Polytechnic Dutse, Nigeria</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Aminu%20Mubarak%20Sadis">Aminu Mubarak Sadis </a> </p> <p class="card-text"><strong>Abstract:</strong></p> This study appraised the maintenance management practice in Federal University Dutse and Jigawa State Polytechnic Dutse, in Nigeria. The Physical Planning, Works and Maintenance Departments of the two Higher Institutions (Federal University Dutse and Jigawa State Polytechnic) are responsible for production and maintenance management of their physical assets. Over–enrollment problem has been a common feature in the higher institutions in Nigeria, Data were collected by the administered questionnaires and subsequent oral interview to authenticate the completed questionnaires. Random sampling techniques was used in selecting 150 respondents across the various institutions (Federal University Dutse and Jigawa State Polytechnic Dutse). Data collected was analyzed using Statistical Package for Social Science (SPSS) and t-test statistical techniques The conclusion was that maintenance management activities are yet to be given their appropriate attention on functions of the university and polytechnic which are crucial to improving teaching, learning and research. The unit responsible for maintenance and managing facilities should focus on their stated functions and effect changes were possible. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=appraisal" title="appraisal">appraisal</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance%20management" title=" maintenance management"> maintenance management</a>, <a href="https://publications.waset.org/abstracts/search?q=university" title=" university"> university</a>, <a href="https://publications.waset.org/abstracts/search?q=Polytechnic" title=" Polytechnic"> Polytechnic</a>, <a href="https://publications.waset.org/abstracts/search?q=practices" title=" practices"> practices</a> </p> <a href="https://publications.waset.org/abstracts/47973/an-appraisal-of-maintenance-management-practices-in-federal-university-dutse-and-jigawa-state-polytechnic-dutse-nigeria" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/47973.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">252</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10747</span> Improving Equipment Life and Overall Equipment Effectiveness (O.E.E.) through Proper Maintenance Strategy Using Value Engineering</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Malay%20Niraj">Malay Niraj</a>, <a href="https://publications.waset.org/abstracts/search?q=Praveen%20Kumar"> Praveen Kumar</a> </p> <p class="card-text"><strong>Abstract:</strong></p> The present study is a new approach for improving equipment life and Overall Equipment Efficiency (O.E.E.) through suitable maintenance practice with the help of value engineering. Value engineering is a one of the most powerful decision-making techniques which depend on many factors. The improvements are the result of recommendations made by multidisciplinary teams representing all parties involved. VE is a rigorous, systematic effort to improve the OEE and optimize the life cycle cost of a facility. The study describes problems in maintenance arising due to the absence of having clear criteria and strong decision constrain how to maintain failing equipment. Using factor comparisons, the study has been made between different maintenance practices and finally best maintenance practice based on value engineering technique has been selected. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=maintenance%20strategy" title="maintenance strategy">maintenance strategy</a>, <a href="https://publications.waset.org/abstracts/search?q=overall%20equipment%20efficiency" title=" overall equipment efficiency"> overall equipment efficiency</a>, <a href="https://publications.waset.org/abstracts/search?q=value%20engineering" title=" value engineering"> value engineering</a>, <a href="https://publications.waset.org/abstracts/search?q=decision-making" title=" decision-making"> decision-making</a> </p> <a href="https://publications.waset.org/abstracts/2052/improving-equipment-life-and-overall-equipment-effectiveness-oee-through-proper-maintenance-strategy-using-value-engineering" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/2052.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">409</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10746</span> Scheduled Maintenance and Downtime Cost in Aircraft Maintenance Management</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Remzi%20Saltoglu">Remzi Saltoglu</a>, <a href="https://publications.waset.org/abstracts/search?q=Nazmia%20Humaira"> Nazmia Humaira</a>, <a href="https://publications.waset.org/abstracts/search?q=Gokhan%20Inalhan"> Gokhan Inalhan</a> </p> <p class="card-text"><strong>Abstract:</strong></p> During aircraft maintenance scheduling, operator calculates the budget of the maintenance. Usually, this calculation includes only the costs that are directly related to the maintenance process such as cost of labor, material, and equipment. In some cases, overhead cost is also included. However, in some of those, downtime cost is neglected claiming that grounding is a natural fact of maintenance; therefore, it is not considered as part of the analytical decision-making process. Based on the normalized data, we introduce downtime cost with its monetary value and add its seasonal character. We envision that the rest of the model, which works together with the downtime cost, could be checked with the real life cases, through the review of MRO cost and airline spending in the particular and scheduled maintenance events. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=aircraft%20maintenance" title="aircraft maintenance">aircraft maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=downtime" title=" downtime"> downtime</a>, <a href="https://publications.waset.org/abstracts/search?q=downtime%20cost" title=" downtime cost"> downtime cost</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance%20cost" title=" maintenance cost"> maintenance cost</a> </p> <a href="https://publications.waset.org/abstracts/47046/scheduled-maintenance-and-downtime-cost-in-aircraft-maintenance-management" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/47046.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">353</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10745</span> The Integrated Strategy of Maintenance with a Scientific Analysis</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Mahmoud%20Meckawey">Mahmoud Meckawey</a> </p> <p class="card-text"><strong>Abstract:</strong></p> This research is dealing with one of the most important aspects of maintenance fields, that is Maintenance Strategy. It's the branch which concerns the concepts and the schematic thoughts in how to manage maintenance and how to deal with the defects in the engineering products (buildings, machines, etc.) in general. Through the papers we will act with the followings: i) The Engineering Product & the Technical Systems: When we act with the maintenance process, in a strategic view, we act with an (engineering product) which consists of multi integrated systems. In fact, there is no engineering product with only one system. We will discuss and explain this topic, through which we will derivate a developed definition for the maintenance process. ii) The factors or basis of the functionality efficiency: That is the main factors affect the functional efficiency of the systems and the engineering products, then by this way we can give a technical definition of defects and how they occur. iii) The legality of occurrence of defects (Legal defects and Illegal defects): with which we assume that all the factors of the functionality efficiency been applied, and then we will discuss the results. iv) The Guarantee, the Functional Span Age and the Technical surplus concepts: In the complementation with the above topic, and associated with the Reliability theorems, where we act with the Probability of Failure state, with which we almost interest with the design stages, that is to check and adapt the design of the elements. But in Maintainability we act in a different way as we act with the actual state of the systems. So, we act with the rest of the story that means we have to act with the complementary part of the probability of failure term which refers to the actual surplus of the functionality for the systems. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=engineering%20product%20and%20technical%20systems" title="engineering product and technical systems">engineering product and technical systems</a>, <a href="https://publications.waset.org/abstracts/search?q=functional%20span%20age" title=" functional span age"> functional span age</a>, <a href="https://publications.waset.org/abstracts/search?q=legal%20and%20illegal%20defects" title=" legal and illegal defects"> legal and illegal defects</a>, <a href="https://publications.waset.org/abstracts/search?q=technical%20and%20functional%20surplus" title=" technical and functional surplus"> technical and functional surplus</a> </p> <a href="https://publications.waset.org/abstracts/78716/the-integrated-strategy-of-maintenance-with-a-scientific-analysis" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/78716.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">475</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10744</span> Comparison of Techniques for Detection and Diagnosis of Eccentricity in the Air-Gap Fault in Induction Motors</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Abrah%C3%A3o%20S.%20Fontes">Abrahão S. Fontes</a>, <a href="https://publications.waset.org/abstracts/search?q=Carlos%20A.%20V.%20Cardoso"> Carlos A. V. Cardoso</a>, <a href="https://publications.waset.org/abstracts/search?q=Levi%20P.%20B.%20Oliveira"> Levi P. B. Oliveira</a> </p> <p class="card-text"><strong>Abstract:</strong></p> The induction motors are used worldwide in various industries. Several maintenance techniques are applied to increase the operating time and the lifespan of these motors. Among these, the predictive maintenance techniques such as Motor Current Signature Analysis (MCSA), Motor Square Current Signature Analysis (MSCSA), Park's Vector Approach (PVA) and Park's Vector Square Modulus (PVSM) are used to detect and diagnose faults in electric motors, characterized by patterns in the stator current frequency spectrum. In this article, these techniques are applied and compared on a real motor, which has the fault of eccentricity in the air-gap. It was used as a theoretical model of an electric induction motor without fault in order to assist comparison between the stator current frequency spectrum patterns with and without faults. Metrics were purposed and applied to evaluate the sensitivity of each technique fault detection. The results presented here show that the above techniques are suitable for the fault of eccentricity in the air gap, whose comparison between these showed the suitability of each one. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=eccentricity%20in%20the%20air-gap" title="eccentricity in the air-gap">eccentricity in the air-gap</a>, <a href="https://publications.waset.org/abstracts/search?q=fault%20diagnosis" title=" fault diagnosis"> fault diagnosis</a>, <a href="https://publications.waset.org/abstracts/search?q=induction%20motors" title=" induction motors"> induction motors</a>, <a href="https://publications.waset.org/abstracts/search?q=predictive%20maintenance" title=" predictive maintenance"> predictive maintenance</a> </p> <a href="https://publications.waset.org/abstracts/62315/comparison-of-techniques-for-detection-and-diagnosis-of-eccentricity-in-the-air-gap-fault-in-induction-motors" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/62315.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">350</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10743</span> Maintenance Performance Measurement Derived Optimization: A Case Study</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=James%20M.%20Wakiru">James M. Wakiru</a>, <a href="https://publications.waset.org/abstracts/search?q=Liliane%20Pintelon"> Liliane Pintelon</a>, <a href="https://publications.waset.org/abstracts/search?q=Peter%20Muchiri"> Peter Muchiri</a>, <a href="https://publications.waset.org/abstracts/search?q=Stanley%20Mburu"> Stanley Mburu</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Maintenance performance measurement (MPM) represents an integrated aspect that considers both operational and maintenance related aspects while evaluating the effectiveness and efficiency of maintenance to ensure assets are working as they should. Three salient issues require to be addressed for an asset-intensive organization to employ an MPM-based framework to optimize maintenance. Firstly, the organization should establish important perfomance metric(s), in this case the maintenance objective(s), which they will be focuss on. The second issue entails aligning the maintenance objective(s) with maintenance optimization. This is achieved by deriving maintenance performance indicators that subsequently form an objective function for the optimization program. Lastly, the objective function is employed in an optimization program to derive maintenance decision support. In this study, we develop a framework that initially identifies the crucial maintenance performance measures, and employs them to derive maintenance decision support. The proposed framework is demonstrated in a case study of a geothermal drilling rig, where the objective function is evaluated utilizing a simulation-based model whose parameters are derived from empirical maintenance data. Availability, reliability and maintenance inventory are depicted as essential objectives requiring further attention. A simulation model is developed mimicking a drilling rig operations and maintenance where the sub-systems are modelled undergoing imperfect maintenance, corrective (CM) and preventive (PM), with the total cost as the primary performance measurement. Moreover, three maintenance spare inventory policies are considered; classical (retaining stocks for a contractual period), vendor-managed inventory with consignment stock and periodic monitoring order-to-stock (s, S) policy. Optimization results infer that the adoption of (s, S) inventory policy, increased PM interval and reduced reliance of CM actions offers improved availability and total costs reduction. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=maintenance" title="maintenance">maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=vendor-managed" title=" vendor-managed"> vendor-managed</a>, <a href="https://publications.waset.org/abstracts/search?q=decision%20support" title=" decision support"> decision support</a>, <a href="https://publications.waset.org/abstracts/search?q=performance" title=" performance"> performance</a>, <a href="https://publications.waset.org/abstracts/search?q=optimization" title=" optimization"> optimization</a> </p> <a href="https://publications.waset.org/abstracts/107472/maintenance-performance-measurement-derived-optimization-a-case-study" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/107472.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">125</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10742</span> Appraisal of Maintenance Practices in Selected Tourist Attraction in Bauchi State, Nigeria</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Eldah%20Ephraim%20Buba">Eldah Ephraim Buba</a>, <a href="https://publications.waset.org/abstracts/search?q=Amina%20Bata%20Zoaka"> Amina Bata Zoaka</a>, <a href="https://publications.waset.org/abstracts/search?q=Aishatu%20Ibrahim"> Aishatu Ibrahim</a> </p> <p class="card-text"><strong>Abstract:</strong></p> This study appraised maintenance practices in selected tourist attractions in Bauchi state, Nigeria. Four tourist attractions were used for the research. Checklists were used to assess operations and repairs maintenance practices in the different attractions. The study carried out personal assessment thrice in six months without prior knowledge of the staff in charge for operational maintenance. Records of repairs maintenance from the attractions maintenance unit for a period of ten years were assessed using the checklists. The findings of the study show that operations maintenance was not adequately carried out in the four tourists attractions. Repairs maintenance was carried out in Yankari game reserve and safari, but repairs maintenance was poor in the other three attractions. The study therefore, recommends that adequate maintenance should be practiced in tourist attractions to expand the lifespan of the facilities and also encourage tourist patronage. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=appraisal" title="appraisal">appraisal</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance" title=" maintenance"> maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=practices" title=" practices"> practices</a>, <a href="https://publications.waset.org/abstracts/search?q=tourist%20attraction" title=" tourist attraction"> tourist attraction</a> </p> <a href="https://publications.waset.org/abstracts/31847/appraisal-of-maintenance-practices-in-selected-tourist-attraction-in-bauchi-state-nigeria" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/31847.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">300</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10741</span> Integrated Gas Turbine Performance Diagnostics and Condition Monitoring Using Adaptive GPA</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Yi-Guang%20Li">Yi-Guang Li</a>, <a href="https://publications.waset.org/abstracts/search?q=Suresh%20Sampath"> Suresh Sampath</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Gas turbine performance degrades over time, and the degradation is greatly affected by environmental, ambient, and operating conditions. The engines may degrade slowly under favorable conditions and result in a waste of engine life if a scheduled maintenance scheme is followed. They may also degrade fast and fail before a scheduled overhaul if the conditions are unfavorable, resulting in serious secondary damage, loss of engine availability, and increased maintenance costs. To overcome these problems, gas turbine owners are gradually moving from scheduled maintenance to condition-based maintenance, where condition monitoring is one of the key supporting technologies. This paper presents an integrated adaptive GPA diagnostics and performance monitoring system developed at Cranfield University for gas turbine gas path condition monitoring. It has the capability to predict the performance degradation of major gas path components of gas turbine engines, such as compressors, combustors, and turbines, using gas path measurement data. It is also able to predict engine key performance parameters for condition monitoring, such as turbine entry temperature that cannot be directly measured. The developed technology has been implemented into digital twin computer Software, Pythia, to support the condition monitoring of gas turbine engines. The capabilities of the integrated GPA condition monitoring system are demonstrated in three test cases using a model gas turbine engine similar to the GE aero-derivative LM2500 engine widely used in power generation and marine propulsion. It shows that when the compressor of the model engine degrades, the Adaptive GPA is able to predict the degradation and the changing engine performance accurately using gas path measurements. Such a presented technology and software are generic, can be applied to different types of gas turbine engines, and provide crucial engine health and performance parameters to support condition monitoring and condition-based maintenance. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=gas%20turbine" title="gas turbine">gas turbine</a>, <a href="https://publications.waset.org/abstracts/search?q=adaptive%20GPA" title=" adaptive GPA"> adaptive GPA</a>, <a href="https://publications.waset.org/abstracts/search?q=performance" title=" performance"> performance</a>, <a href="https://publications.waset.org/abstracts/search?q=diagnostics" title=" diagnostics"> diagnostics</a>, <a href="https://publications.waset.org/abstracts/search?q=condition%20monitoring" title=" condition monitoring"> condition monitoring</a> </p> <a href="https://publications.waset.org/abstracts/171241/integrated-gas-turbine-performance-diagnostics-and-condition-monitoring-using-adaptive-gpa" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/171241.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">88</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10740</span> Neural Network Based Approach of Software Maintenance Prediction for Laboratory Information System</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Vuk%20M.%20Popovic">Vuk M. Popovic</a>, <a href="https://publications.waset.org/abstracts/search?q=Dunja%20D.%20Popovic"> Dunja D. Popovic</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Software maintenance phase is started once a software project has been developed and delivered. After that, any modification to it corresponds to maintenance. Software maintenance involves modifications to keep a software project usable in a changed or a changing environment, to correct discovered faults, and modifications, and to improve performance or maintainability. Software maintenance and management of software maintenance are recognized as two most important and most expensive processes in a life of a software product. This research is basing the prediction of maintenance, on risks and time evaluation, and using them as data sets for working with neural networks. The aim of this paper is to provide support to project maintenance managers. They will be able to pass the issues planned for the next software-service-patch to the experts, for risk and working time evaluation, and afterward to put all data to neural networks in order to get software maintenance prediction. This process will lead to the more accurate prediction of the working hours needed for the software-service-patch, which will eventually lead to better planning of budget for the software maintenance projects. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=laboratory%20information%20system" title="laboratory information system">laboratory information system</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance%20engineering" title=" maintenance engineering"> maintenance engineering</a>, <a href="https://publications.waset.org/abstracts/search?q=neural%20networks" title=" neural networks"> neural networks</a>, <a href="https://publications.waset.org/abstracts/search?q=software%20maintenance" title=" software maintenance"> software maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=software%20maintenance%20costs" title=" software maintenance costs"> software maintenance costs</a> </p> <a href="https://publications.waset.org/abstracts/68789/neural-network-based-approach-of-software-maintenance-prediction-for-laboratory-information-system" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/68789.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">358</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10739</span> Predictive Maintenance Based on Oil Analysis Applicable to Transportation Fleets</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Israel%20Ibarra%20Solis">Israel Ibarra Solis</a>, <a href="https://publications.waset.org/abstracts/search?q=Juan%20Carlos%20Rodriguez%20Sierra"> Juan Carlos Rodriguez Sierra</a>, <a href="https://publications.waset.org/abstracts/search?q=Ma.%20del%20Carmen%20Salazar%20Hernandez"> Ma. del Carmen Salazar Hernandez</a>, <a href="https://publications.waset.org/abstracts/search?q=Isis%20Rodriguez%20Sanchez"> Isis Rodriguez Sanchez</a>, <a href="https://publications.waset.org/abstracts/search?q=David%20Perez%20Guerrero"> David Perez Guerrero</a> </p> <p class="card-text"><strong>Abstract:</strong></p> At the present paper we try to explain the analysis techniques use for the lubricating oil in a maintenance period of a city bus (Mercedes Benz Boxer 40), which is call ‘R-24 route’, line Coecillo Centro SA de CV in Leon Guanajuato, to estimate the optimal time for the oil change. Using devices such as the rotational viscometer and the atomic absorption spectrometer, they can detect the incipient form when the oil loses its lubricating properties and, therefore, cannot protect the mechanical components of diesel engines such these trucks. Timely detection of lost property in the oil, it allows us taking preventive plan maintenance for the fleet. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=atomic%20absorption%20spectrometry" title="atomic absorption spectrometry">atomic absorption spectrometry</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance" title=" maintenance"> maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=predictive%20velocity%20rate" title=" predictive velocity rate"> predictive velocity rate</a>, <a href="https://publications.waset.org/abstracts/search?q=lubricating%20oils" title=" lubricating oils"> lubricating oils</a> </p> <a href="https://publications.waset.org/abstracts/35777/predictive-maintenance-based-on-oil-analysis-applicable-to-transportation-fleets" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/35777.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">568</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10738</span> GIS Pavement Maintenance Selection Strategy</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Mekdelawit%20Teferi%20Alamirew">Mekdelawit Teferi Alamirew</a> </p> <p class="card-text"><strong>Abstract:</strong></p> As a practical tool, the Geographical information system (GIS) was used for data integration, collection, management, analysis, and output presentation in pavement mangement systems . There are many GIS techniques to improve the maintenance activities like Dynamic segmentation and weighted overlay analysis which considers Multi Criteria Decision Making process. The results indicated that the developed MPI model works sufficiently and yields adequate output for providing accurate decisions. Hence considering multi criteria to prioritize the pavement sections for maintenance, as a result of the fact that GIS maps can express position, extent, and severity of pavement distress features more effectively than manual approaches, lastly the paper also offers digitized distress maps that can help agencies in their decision-making processes. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=pavement" title="pavement">pavement</a>, <a href="https://publications.waset.org/abstracts/search?q=flexible" title=" flexible"> flexible</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance" title=" maintenance"> maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=index" title=" index"> index</a> </p> <a href="https://publications.waset.org/abstracts/182371/gis-pavement-maintenance-selection-strategy" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/182371.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">62</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10737</span> Lean Philosophy towards the Enhancement of Maintenance Programs Efficiency with Particular Attention to Libyan Oil and Gas Scenario</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Sulayman%20Adrees%20Mohammed">Sulayman Adrees Mohammed</a>, <a href="https://publications.waset.org/abstracts/search?q=Ahmed%20Faraj%20Abd%20Alsameea"> Ahmed Faraj Abd Alsameea</a> </p> <p class="card-text"><strong>Abstract:</strong></p> The ongoing hindrance for Libyan oil and gas companies is the persistent challenge of eradicating maintenance program failures that result in exorbitant costs and production setbacks. Accordingly, this research is prompted to introduce the concept of lean philosophy in maintenance, which aims to eliminate waste and enhance productivity in maintenance procedures through the identification and differentiation of value-adding (VA) and non-value-adding (NVA) activities. The purpose of this paper was to explore and describe the benefits that can be gained by adopting the Lean philosophy towards the enhancement of maintenance programs' efficiency from theoretical perspectives. The oil industry maintenance community in Libya now has an introduced tool by which they can effectively evaluate their maintenance program functionality and reduce the areas of non-value added activities within maintenance, thereby enhancing the availability of the equipment and the capacity of the oil and gas facilities. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=efficiency" title="efficiency">efficiency</a>, <a href="https://publications.waset.org/abstracts/search?q=lean%20philosophy" title=" lean philosophy"> lean philosophy</a>, <a href="https://publications.waset.org/abstracts/search?q=Libyan%20oil%20and%20gas%20scenario" title=" Libyan oil and gas scenario"> Libyan oil and gas scenario</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance%20programs" title=" maintenance programs"> maintenance programs</a> </p> <a href="https://publications.waset.org/abstracts/183528/lean-philosophy-towards-the-enhancement-of-maintenance-programs-efficiency-with-particular-attention-to-libyan-oil-and-gas-scenario" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/183528.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">109</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10736</span> Providing a Practical Model to Reduce Maintenance Costs: A Case Study in GeG Company</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Iman%20Atighi">Iman Atighi</a>, <a href="https://publications.waset.org/abstracts/search?q=Jalal%20Soleimannejad"> Jalal Soleimannejad</a>, <a href="https://publications.waset.org/abstracts/search?q=Reza%20Pourjafarabadi"> Reza Pourjafarabadi</a>, <a href="https://publications.waset.org/abstracts/search?q=Saeid%20Moradpour"> Saeid Moradpour</a> </p> <p class="card-text"><strong>Abstract:</strong></p> In the past, we could increase profit by increasing product prices. But in the new decade, a competitive market does not let us to increase profit with increased prices. Therefore, the only way to increase profit will be to reduce costs. A significant percentage of production costs are the maintenance costs, and analysis of these costs could achieve more profit. Most maintenance strategies such as RCM (Reliability-Center-Maintenance), TPM (Total Productivity Maintenance), PM (Preventive Maintenance) and etc., are trying to reduce maintenance costs. In this paper, decreasing the maintenance costs of Concentration Plant of Golgohar Iron Ore Mining &amp; Industrial Company (GeG) was examined by using of MTBF (Mean Time Between Failures) and MTTR (Mean Time To Repair) analyses. These analyses showed that instead of buying new machines and increasing costs in order to promote capacity, the improving of MTBF and MTTR indexes would solve capacity problems in the best way and decrease costs. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=GeG%20company" title="GeG company">GeG company</a>, <a href="https://publications.waset.org/abstracts/search?q=maintainability" title=" maintainability"> maintainability</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance%20costs" title=" maintenance costs"> maintenance costs</a>, <a href="https://publications.waset.org/abstracts/search?q=reliability-center-maintenance" title=" reliability-center-maintenance"> reliability-center-maintenance</a> </p> <a href="https://publications.waset.org/abstracts/84313/providing-a-practical-model-to-reduce-maintenance-costs-a-case-study-in-geg-company" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/84313.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">221</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10735</span> Aircraft Line Maintenance Equipped with Decision Support System</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=B.%20Sudarsan%20Baskar">B. Sudarsan Baskar</a>, <a href="https://publications.waset.org/abstracts/search?q=S.%20Pooja%20Pragati"> S. Pooja Pragati</a>, <a href="https://publications.waset.org/abstracts/search?q=S.%20Raj%20Kumar"> S. Raj Kumar</a> </p> <p class="card-text"><strong>Abstract:</strong></p> The cost effectiveness in aircraft maintenance is of high privilege in the recent days. The cost effectiveness can be effectively made when line maintenance activities are incorporated at airports during Turn around time (TAT). The present work outcomes the shortcomings that affect the dispatching of the aircrafts, aiming at high fleet operability and low maintenance cost. The operational and cost constraints have been discussed and a suggestive alternative mechanism is proposed. The possible allocation of all deferred maintenance tasks to a set of all deferred maintenance tasks to a set of suitable airport resources have termed as alternative and is discussed in this paper from the data’s collected from the kingfisher airlines. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=decision%20support%20system" title="decision support system">decision support system</a>, <a href="https://publications.waset.org/abstracts/search?q=aircraft%20maintenance%20planning" title=" aircraft maintenance planning"> aircraft maintenance planning</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance-cost" title=" maintenance-cost"> maintenance-cost</a>, <a href="https://publications.waset.org/abstracts/search?q=RUL%28remaining%20useful%20life%29" title=" RUL(remaining useful life)"> RUL(remaining useful life)</a>, <a href="https://publications.waset.org/abstracts/search?q=logistics" title=" logistics"> logistics</a>, <a href="https://publications.waset.org/abstracts/search?q=supply%20chain%20management" title=" supply chain management"> supply chain management</a> </p> <a href="https://publications.waset.org/abstracts/26299/aircraft-line-maintenance-equipped-with-decision-support-system" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/26299.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">502</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10734</span> Aspects on the Problems of Road Asset Management and Maintenance in Albania</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Diana%20Bardhi">Diana Bardhi</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Road safety is an essential part of the economic and social development of any industrialized country. Decisions to maintain and improve the reliability, functionality of infrastructure structures can only be achieved through integrated road life cycle planning and management. There has always been a tendency to review road maintenance strategies, but there is still no serious and reliable administration due to not only insufficient funds but also problems in the proper reorganization of this system. The safety and performance of the road system depend on the ongoing activity of road maintenance management. For it to be effective, it is necessary to intervene before the degradation has caused irreparable damage or damage with a high economic cost of repairs. Investments in road infrastructure during 2006-2014 show that the life of these projects presents problems related to the maintenance and management of life cycle performance in a wide range of constituent elements. Maintenance planning includes various problems that depend on the degree of degradation of asphalt layers, the degree of damage to road structures (bridges, tunnels, culverts, and the economic planning of resources for their repair). The purpose of this study is first to provide a brief overview of the problems in the field of maintenance and life cycle management of road infrastructure investments, proposing ways to reorganize the sector of administration and maintenance of ongoing roads and secondly testing and evaluating the work and nature of standards of different types of road infrastructure projects, through a methodology consisting of a) development, b) data collection, and c) analysis. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=infrastructure" title="infrastructure">infrastructure</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance" title=" maintenance"> maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=depreciation" title=" depreciation"> depreciation</a>, <a href="https://publications.waset.org/abstracts/search?q=efficiency" title=" efficiency"> efficiency</a> </p> <a href="https://publications.waset.org/abstracts/137766/aspects-on-the-problems-of-road-asset-management-and-maintenance-in-albania" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/137766.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">161</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10733</span> Providing a Practical Model to Reduce Maintenance Costs: A Case Study in Golgohar Company</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Iman%20Atighi">Iman Atighi</a>, <a href="https://publications.waset.org/abstracts/search?q=Jalal%20Soleimannejad"> Jalal Soleimannejad</a>, <a href="https://publications.waset.org/abstracts/search?q=Ahmad%20Akbarinasab"> Ahmad Akbarinasab</a>, <a href="https://publications.waset.org/abstracts/search?q=Saeid%20Moradpour"> Saeid Moradpour</a> </p> <p class="card-text"><strong>Abstract:</strong></p> In the past, we could increase profit by increasing product prices. But in the new decade, a competitive market does not let us to increase profit with increase prices. Therefore, the only way to increase profit will be reduce costs. A significant percentage of production costs are the maintenance costs, and analysis of these costs could achieve more profit. Most maintenance strategies such as RCM (Reliability-Center-Maintenance), TPM (Total Productivity Maintenance), PM (Preventive Maintenance) etc., are trying to reduce maintenance costs. In this paper, decreasing the maintenance costs of Concentration Plant of Golgohar Company (GEG) was examined by using of MTBF (Mean Time between Failures) and MTTR (Mean Time to Repair) analyses. These analyses showed that instead of buying new machines and increasing costs in order to promote capacity, the improving of MTBF and MTTR indexes would solve capacity problems in the best way and decrease costs. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=Golgohar%20Iron%20Ore%20Mining%20and%20Industrial%20Company" title="Golgohar Iron Ore Mining and Industrial Company">Golgohar Iron Ore Mining and Industrial Company</a>, <a href="https://publications.waset.org/abstracts/search?q=maintainability" title=" maintainability"> maintainability</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance%20costs" title=" maintenance costs"> maintenance costs</a>, <a href="https://publications.waset.org/abstracts/search?q=reliability-center-maintenance" title=" reliability-center-maintenance"> reliability-center-maintenance</a> </p> <a href="https://publications.waset.org/abstracts/75164/providing-a-practical-model-to-reduce-maintenance-costs-a-case-study-in-golgohar-company" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/75164.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">302</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10732</span> Availability Analysis of Process Management in the Equipment Maintenance and Repair Implementation</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Onur%20Ozveri">Onur Ozveri</a>, <a href="https://publications.waset.org/abstracts/search?q=Korkut%20Karabag"> Korkut Karabag</a>, <a href="https://publications.waset.org/abstracts/search?q=Cagri%20Keles"> Cagri Keles</a> </p> <p class="card-text"><strong>Abstract:</strong></p> It is an important issue that the occurring of production downtime and repair costs when machines fail in the machine intensive production industries. In the case of failure of more than one machine at the same time, which machines will have the priority to repair, how to determine the optimal repair time should be allotted for this machines and how to plan the resources needed to repair are the key issues. In recent years, Business Process Management (BPM) technique, bring effective solutions to different problems in business. The main feature of this technique is that it can improve the way the job done by examining in detail the works of interest. In the industries, maintenance and repair works are operating as a process and when a breakdown occurs, it is known that the repair work is carried out in a series of process. Maintenance main-process and repair sub-process are evaluated with process management technique, so it is thought that structure could bring a solution. For this reason, in an international manufacturing company, this issue discussed and has tried to develop a proposal for a solution. The purpose of this study is the implementation of maintenance and repair works which is integrated with process management technique and at the end of implementation, analyzing the maintenance related parameters like quality, cost, time, safety and spare part. The international firm that carried out the application operates in a free region in Turkey and its core business area is producing original equipment technologies, vehicle electrical construction, electronics, safety and thermal systems for the world's leading light and heavy vehicle manufacturers. In the firm primarily, a project team has been established. The team dealt with the current maintenance process again, and it has been revised again by the process management techniques. Repair process which is sub-process of maintenance process has been discussed again. In the improved processes, the ABC equipment classification technique was used to decide which machine or machines will be given priority in case of failure. This technique is a prioritization method of malfunctioned machine based on the effect of the production, product quality, maintenance costs and job security. Improved maintenance and repair processes have been implemented in the company for three months, and the obtained data were compared with the previous year data. In conclusion, breakdown maintenance was found to occur in a shorter time, with lower cost and lower spare parts inventory. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=ABC%20equipment%20classification" title="ABC equipment classification">ABC equipment classification</a>, <a href="https://publications.waset.org/abstracts/search?q=business%20process%20management%20%28BPM%29" title=" business process management (BPM)"> business process management (BPM)</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance" title=" maintenance"> maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=repair%20performance" title=" repair performance"> repair performance</a> </p> <a href="https://publications.waset.org/abstracts/60468/availability-analysis-of-process-management-in-the-equipment-maintenance-and-repair-implementation" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/60468.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">194</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10731</span> Sustainable Maintenance Model for Infrastructure in Egypt</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=S.%20Hasan">S. Hasan</a>, <a href="https://publications.waset.org/abstracts/search?q=I.%20Beshara"> I. Beshara</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Infrastructure maintenance is a great challenge facing sustainable development of infrastructure assets due to the high cost of passive implementation of a sustainable maintenance plan. An assessment model of sustainable maintenance for highway infrastructure projects in Egypt is developed in this paper. It helps in improving the implementation of sustainable maintenance criteria. Thus, this paper has applied the analytical hierarchy processes (AHP) to rank and explore the weight of 26 assessment indicators using three hierarchy levels containing the main sustainable categories and subcategories with related indicators. Overall combined weight of each indicator for sustainable maintenance evaluation has been calculated to sum up to a sustainable maintenance performance index (SMI). The results show that the factor &quot;Preventive maintenance cost&quot; has the highest relative contribution factor among others (13.5%), while two factors of environmental performance have the least weights (0.7%). The developed model aims to provide decision makers with information about current maintenance performance and support them in the decision-making process regarding future directions of maintenance activities. It can be used as an assessment performance tool during the operation and maintenance stage. The developed indicators can be considered during designing the maintenance plan. Practices for successful implementation of the model are also presented. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=analytical%20hierarchy%20process" title="analytical hierarchy process">analytical hierarchy process</a>, <a href="https://publications.waset.org/abstracts/search?q=assessment%20performance%20Model" title=" assessment performance Model"> assessment performance Model</a>, <a href="https://publications.waset.org/abstracts/search?q=KPIs%20for%20sustainable%20maintenance" title=" KPIs for sustainable maintenance"> KPIs for sustainable maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=sustainable%20maintenance%20index" title=" sustainable maintenance index"> sustainable maintenance index</a> </p> <a href="https://publications.waset.org/abstracts/127136/sustainable-maintenance-model-for-infrastructure-in-egypt" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/127136.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">138</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10730</span> Decision Support System for the Management and Maintenance of Sewer Networks</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=A.%20Bouamrane">A. Bouamrane</a>, <a href="https://publications.waset.org/abstracts/search?q=M.%20T.%20Bouziane"> M. T. Bouziane</a>, <a href="https://publications.waset.org/abstracts/search?q=K.%20Boutebba"> K. Boutebba</a>, <a href="https://publications.waset.org/abstracts/search?q=Y.%20Djebbar"> Y. Djebbar</a> </p> <p class="card-text"><strong>Abstract:</strong></p> This paper aims to develop a decision support tool to provide solutions to the problems of sewer networks management/maintenance in order to assist the manager to sort sections upon priority of intervention by taking account of the technical, economic, social and environmental standards as well as the managers’ strategy. This solution uses the Analytic Network Process (ANP) developed by Thomas Saaty, coupled with a set of tools for modelling and collecting integrated data from a geographic information system (GIS). It provides to the decision maker a tool adapted to the reality on the ground and effective in usage compared to the means and objectives of the manager. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=multi-criteria%20decision%20support" title="multi-criteria decision support">multi-criteria decision support</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance" title=" maintenance"> maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=Geographic%20Information%20System" title=" Geographic Information System"> Geographic Information System</a>, <a href="https://publications.waset.org/abstracts/search?q=modelling" title=" modelling"> modelling</a> </p> <a href="https://publications.waset.org/abstracts/21695/decision-support-system-for-the-management-and-maintenance-of-sewer-networks" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/21695.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">637</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10729</span> Reliability-Centered Maintenance Application for the Development of Maintenance Strategy for a Cement Plant</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Nabil%20Hameed%20Al-Farsi">Nabil Hameed Al-Farsi</a> </p> <p class="card-text"><strong>Abstract:</strong></p> This study’s main goal is to develop a model and a maintenance strategy for a cement factory called Arabian Cement Company, Rabigh Plant. The proposed work here depends on Reliability centric maintenance approach to develop a strategy and maintenance schedule that ensures increasing the reliability of the production system components, thus ensuring continuous productivity. The cost-effective maintenance of the plant’s dependability performance is the key goal of durability-based maintenance is. The cement plant consists of 7 important steps, so, developing a maintenance plan based on Reliability centric maintenance (RCM) method is made up of 10 steps accordingly starting from selecting units and data until performing and updating the model. The processing unit chosen for the analysis of this case is the calcinatory unit regarding model’s validation and the Travancore Titanium Products Ltd (TTP) using the claimed data history acquired from the maintenance department maintenance from the mentioned company. After applying the proposed model, the results of the maintenance simulation justified the plant's existing scheduled maintenance policy being reconsidered. Results represent the need for preventive maintenance for all Class A criticality equipment instead of the planned maintenance and the breakdown one for all other equipment depends on its criticality and an FMEA report. Consequently, the additional cost of preventive maintenance would be offset by the cost savings from breakdown maintenance for the remaining equipment. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=engineering" title="engineering">engineering</a>, <a href="https://publications.waset.org/abstracts/search?q=reliability" title=" reliability"> reliability</a>, <a href="https://publications.waset.org/abstracts/search?q=strategy" title=" strategy"> strategy</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance" title=" maintenance"> maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=failure%20modes" title=" failure modes"> failure modes</a>, <a href="https://publications.waset.org/abstracts/search?q=effects%20and%20criticality%20analysis%20%28FMEA%29" title=" effects and criticality analysis (FMEA)"> effects and criticality analysis (FMEA)</a> </p> <a href="https://publications.waset.org/abstracts/146390/reliability-centered-maintenance-application-for-the-development-of-maintenance-strategy-for-a-cement-plant" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/146390.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">171</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10728</span> Maintenance Management Practice for Building</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Harold%20Jideofor%20Nnachetam">Harold Jideofor Nnachetam</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Maintenance management in Nigeria Polytechnic faced many issues due to poor service delivery, inadequate finance, and poor maintenance plan and maintenance backlogs. The purpose of this study is to improve the conventional method practices which tend to be ineffective in Nigeria Polytechnic. The case study was conducted with eight Polytechnics in Nigeria. The selected Polytechnic is based on conventional method practices and its major problems, attempt to implement computerized technology and the willingness of staff to share their experiences. All feedbacks from respondents through semi-structured interview were recorded using video camera and transcribed verbatim. The overall findings of this research indicated; poor service delivery, inadequate financial, poor maintenance planning and maintenance backlogs. There is also need to overcome less man power competencies of maintenance management practices which existed with all eight Polytechnics. In addition, the study also found that the Polytechnics still use conventional maintenance management processes in managing building facility condition. As a result, the maintenance management staff was not able to improve the maintenance management performance at the Polytechnics. The findings are intended to be used for maintenance management practices at Nigeria Polytechnics in order to provide high-quality of building facility with safe and healthy environments. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=maintenance%20management" title="maintenance management">maintenance management</a>, <a href="https://publications.waset.org/abstracts/search?q=conventional%20method" title=" conventional method"> conventional method</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance%20management%20system" title=" maintenance management system"> maintenance management system</a>, <a href="https://publications.waset.org/abstracts/search?q=Nigeria%20polytechnic" title=" Nigeria polytechnic"> Nigeria polytechnic</a> </p> <a href="https://publications.waset.org/abstracts/33471/maintenance-management-practice-for-building" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/33471.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">322</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10727</span> Fourier Transform and Machine Learning Techniques for Fault Detection and Diagnosis of Induction Motors</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Duc%20V.%20Nguyen">Duc V. Nguyen</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Induction motors are widely used in different industry areas and can experience various kinds of faults in stators and rotors. In general, fault detection and diagnosis techniques for induction motors can be supervised by measuring quantities such as noise, vibration, and temperature. The installation of mechanical sensors in order to assess the health conditions of a machine is typically only done for expensive or load-critical machines, where the high cost of a continuous monitoring system can be Justified. Nevertheless, induced current monitoring can be implemented inexpensively on machines with arbitrary sizes by using current transformers. In this regard, effective and low-cost fault detection techniques can be implemented, hence reducing the maintenance and downtime costs of motors. This work proposes a method for fault detection and diagnosis of induction motors, which combines classical fast Fourier transform and modern/advanced machine learning techniques. The proposed method is validated on real-world data and achieves a precision of 99.7% for fault detection and 100% for fault classification with minimal expert knowledge requirement. In addition, this approach allows users to be able to optimize/balance risks and maintenance costs to achieve the highest bene t based on their requirements. These are the key requirements of a robust prognostics and health management system. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=fault%20detection" title="fault detection">fault detection</a>, <a href="https://publications.waset.org/abstracts/search?q=FFT" title=" FFT"> FFT</a>, <a href="https://publications.waset.org/abstracts/search?q=induction%20motor" title=" induction motor"> induction motor</a>, <a href="https://publications.waset.org/abstracts/search?q=predictive%20maintenance" title=" predictive maintenance"> predictive maintenance</a> </p> <a href="https://publications.waset.org/abstracts/134923/fourier-transform-and-machine-learning-techniques-for-fault-detection-and-diagnosis-of-induction-motors" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/134923.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">170</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10726</span> Educational Plan and Program of the Subject: Maintenance of Electric Power Equipment</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Rade%20M.%20Ciric">Rade M. Ciric</a>, <a href="https://publications.waset.org/abstracts/search?q=Sasa%20Mandic"> Sasa Mandic</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Students of Higher Education Technical School of Professional Studies, in Novi Sad follow the subject Maintenance of electric power equipment at the Electrotechnical Department. This paper presents educational plan and program of the subject Maintenance of electric power equipment. The course deals with the problems of preventive and investing maintenance of transformer stations (TS), performing and maintenance of grounding of TS and pillars, as well as tracing and detection the location of the cables failure. There is a special elaborated subject concerning the safe work conditions for the electrician during network maintenance, as well as the basics of making and keeping technical documentation of the equipment. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=educational%20plan%20and%20program" title="educational plan and program">educational plan and program</a>, <a href="https://publications.waset.org/abstracts/search?q=electric%20power%20equipment" title=" electric power equipment"> electric power equipment</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance" title=" maintenance"> maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=technical%20documentation" title=" technical documentation"> technical documentation</a>, <a href="https://publications.waset.org/abstracts/search?q=safe%20work" title=" safe work"> safe work</a> </p> <a href="https://publications.waset.org/abstracts/7290/educational-plan-and-program-of-the-subject-maintenance-of-electric-power-equipment" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/7290.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">467</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10725</span> Comparative Analysis of Integrated and Non-Integrated Fish Farming in Ogun State, Nigeria</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=B.%20G.%20Abiona">B. G. Abiona</a> </p> <p class="card-text"><strong>Abstract:</strong></p> This study compared profitability analysis of integrated and non-integrated fish farming in Ogun State, Nigeria. Primary data were collected using interview guide. Random sampling techniques was used to select 133 non-integrated fish farmers (NIFF) and 216 integrated fish farmers (IFF) (n = 349) from the study area. Data were analyzed using Chi-square, T-test and Pearson Product moment correlation. Results showed that 92.5% of NIFF was male compared to IFF (90.7%). Also, 96.8% of IFF and 79.7% of NIFF were married. The mean ages of sampled farmers were 44 years (NIFF) and 46 years (IFF) while the mean fish farming experiences were 4 years (NIFF) and 5 years (IFF). Also, the average net profit per year of integrated fish farmers was ₦162,550 compared to NIFF (₦61,638). The chi-square analyses showed that knowledge of fish farming had significant relationship with respondents sex (χ2 = 9.44, df = 2, p < 0.05), age (r = 0.20, p< 0.05) and farming experience (r = p = 0.05). Significant differences exist between integrated and non-integrated fish farming, considering their knowledge of fish farming (t = 21.5, χ = 43.01, p < 0.05). The study concluded that IFF are more profitable compared to NIFF. It was recommended that private investors and NGOs should sponsor short training and courses which will enhance efficiency of fish farming to boost productivity among fish farmers. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=profitability%20analysis" title="profitability analysis">profitability analysis</a>, <a href="https://publications.waset.org/abstracts/search?q=farms" title=" farms"> farms</a>, <a href="https://publications.waset.org/abstracts/search?q=integration" title=" integration"> integration</a> </p> <a href="https://publications.waset.org/abstracts/7469/comparative-analysis-of-integrated-and-non-integrated-fish-farming-in-ogun-state-nigeria" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/7469.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">336</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10724</span> Contribution to the Decision-Making Process for Selecting the Suitable Maintenance Policy</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Nasser%20Y.%20Mahamoud">Nasser Y. Mahamoud</a>, <a href="https://publications.waset.org/abstracts/search?q=Pierre%20Dehombreux"> Pierre Dehombreux</a>, <a href="https://publications.waset.org/abstracts/search?q=Hassan%20E.%20Robleh"> Hassan E. Robleh</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Industrial companies may be confronted with questions about their choice of maintenance policy. This choice must be guided by several numbers of decision criteria or objectives related to their production or service activities but also to their level of development and their investment prospects. A decision-support methodology to choose a maintenance policy (corrective, systematic or conditional preventive, predictive, opportunistic or not) is proposed to facilitate this choice using the main categories of the most important decision criteria. The different steps of this methodology are illustrated using theoretical case: identification of the different maintenance alternatives, determining the structure of the most important categories of the decision criteria, assessing the different maintenance policies on to the criteria by using an ordinal preference relation, and finally ranking the different maintenance policies. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=maintenance%20policy" title="maintenance policy">maintenance policy</a>, <a href="https://publications.waset.org/abstracts/search?q=decision%20criteria" title=" decision criteria"> decision criteria</a>, <a href="https://publications.waset.org/abstracts/search?q=decision-making%20process" title=" decision-making process"> decision-making process</a>, <a href="https://publications.waset.org/abstracts/search?q=AHP" title=" AHP"> AHP</a> </p> <a href="https://publications.waset.org/abstracts/72202/contribution-to-the-decision-making-process-for-selecting-the-suitable-maintenance-policy" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/72202.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">332</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10723</span> Pavement Maintenance and Rehabilitation Scheduling Using Genetic Algorithm Based Multi Objective Optimization Technique</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Ashwini%20Gowda%20K.%20S">Ashwini Gowda K. S</a>, <a href="https://publications.waset.org/abstracts/search?q=Archana%20M.%20R"> Archana M. R</a>, <a href="https://publications.waset.org/abstracts/search?q=Anjaneyappa%20V"> Anjaneyappa V</a> </p> <p class="card-text"><strong>Abstract:</strong></p> This paper presents pavement maintenance and management system (PMMS) to obtain optimum pavement maintenance and rehabilitation strategies and maintenance scheduling for a network using a multi-objective genetic algorithm (MOGA). Optimal pavement maintenance & rehabilitation strategy is to maximize the pavement condition index of the road section in a network with minimum maintenance and rehabilitation cost during the planning period. In this paper, NSGA-II is applied to perform maintenance optimization; this maintenance approach was expected to preserve and improve the existing condition of the highway network in a cost-effective way. The proposed PMMS is applied to a network that assessed pavement based on the pavement condition index (PCI). The minimum and maximum maintenance cost for a planning period of 20 years obtained from the non-dominated solution was found to be 5.190x10¹⁰ ₹ and 4.81x10¹⁰ ₹, respectively. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=genetic%20algorithm" title="genetic algorithm">genetic algorithm</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance%20and%20rehabilitation" title=" maintenance and rehabilitation"> maintenance and rehabilitation</a>, <a href="https://publications.waset.org/abstracts/search?q=optimization%20technique" title=" optimization technique"> optimization technique</a>, <a href="https://publications.waset.org/abstracts/search?q=pavement%20condition%20index" title=" pavement condition index"> pavement condition index</a> </p> <a href="https://publications.waset.org/abstracts/129811/pavement-maintenance-and-rehabilitation-scheduling-using-genetic-algorithm-based-multi-objective-optimization-technique" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/129811.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">149</span> </span> </div> </div> <div class="card paper-listing mb-3 mt-3"> <h5 class="card-header" style="font-size:.9rem"><span class="badge badge-info">10722</span> A Fuzzy Analytic Hierarchy Process Approach for the Decision of Maintenance Priorities of Building Entities: A Case Study in a Facilities Management Company</h5> <div class="card-body"> <p class="card-text"><strong>Authors:</strong> <a href="https://publications.waset.org/abstracts/search?q=Wai%20Ho%20Darrell%20Kwok">Wai Ho Darrell Kwok</a> </p> <p class="card-text"><strong>Abstract:</strong></p> Building entities are valuable assets of a society, however, all of them are suffered from the ravages of weather and time. Facilitating onerous maintenance activities is the only way to either maintain or enhance the value and contemporary standard of the premises. By the way, maintenance budget is always bounded by the corresponding threshold limit. In order to optimize the limited resources allocation in carrying out maintenance, there is a substantial need to prioritize maintenance work. This paper reveals the application of Fuzzy AHP in a Facilities Management Company determining the maintenance priorities on the basis of predetermined criteria, viz., Building Status (BS), Effects on Fabrics (EF), Effects on Sustainability (ES), Effects on Users (EU), Importance of Usage (IU) and Physical Condition (PC) in dealing with categorized 8 predominant building components maintenance aspects for building premises. From the case study, it is found that ‘building exterior repainting or re-tiling’, ‘spalling concrete repair works among exterior area’ and ‘lobby renovation’ are the top three maintenance priorities from facilities manager and maintenance expertise personnel. Through the application of the Fuzzy AHP for maintenance priorities decision algorithm, a more systemic and easier comparing scalar linearity factors being explored even in considering other multiple criteria decision scenarios of building maintenance issue. <p class="card-text"><strong>Keywords:</strong> <a href="https://publications.waset.org/abstracts/search?q=building%20maintenance" title="building maintenance">building maintenance</a>, <a href="https://publications.waset.org/abstracts/search?q=fuzzy%20AHP" title=" fuzzy AHP"> fuzzy AHP</a>, <a href="https://publications.waset.org/abstracts/search?q=maintenance%20priority" title=" maintenance priority"> maintenance priority</a>, <a href="https://publications.waset.org/abstracts/search?q=multi-criteria%20decision%20making" title=" multi-criteria decision making"> multi-criteria decision making</a> </p> <a href="https://publications.waset.org/abstracts/95951/a-fuzzy-analytic-hierarchy-process-approach-for-the-decision-of-maintenance-priorities-of-building-entities-a-case-study-in-a-facilities-management-company" class="btn btn-primary btn-sm">Procedia</a> <a href="https://publications.waset.org/abstracts/95951.pdf" target="_blank" class="btn btn-primary btn-sm">PDF</a> <span class="bg-info text-light px-1 py-1 float-right rounded"> Downloads <span class="badge badge-light">243</span> </span> </div> </div> <ul class="pagination"> <li class="page-item disabled"><span class="page-link">&lsaquo;</span></li> <li class="page-item active"><span class="page-link">1</span></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=2">2</a></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=3">3</a></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=4">4</a></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=5">5</a></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=6">6</a></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=7">7</a></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=8">8</a></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=9">9</a></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=10">10</a></li> <li class="page-item disabled"><span class="page-link">...</span></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=358">358</a></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=359">359</a></li> <li class="page-item"><a class="page-link" href="https://publications.waset.org/abstracts/search?q=integrated%20maintenance%20techniques&amp;page=2" rel="next">&rsaquo;</a></li> </ul> </div> </main> <footer> <div id="infolinks" class="pt-3 pb-2"> <div class="container"> <div style="background-color:#f5f5f5;" class="p-3"> <div class="row"> <div class="col-md-2"> <ul class="list-unstyled"> About <li><a href="https://waset.org/page/support">About Us</a></li> <li><a href="https://waset.org/page/support#legal-information">Legal</a></li> <li><a target="_blank" rel="nofollow" href="https://publications.waset.org/static/files/WASET-16th-foundational-anniversary.pdf">WASET celebrates its 16th foundational anniversary</a></li> </ul> </div> <div class="col-md-2"> <ul class="list-unstyled"> Account <li><a href="https://waset.org/profile">My Account</a></li> </ul> </div> <div class="col-md-2"> <ul class="list-unstyled"> Explore <li><a href="https://waset.org/disciplines">Disciplines</a></li> <li><a href="https://waset.org/conferences">Conferences</a></li> <li><a href="https://waset.org/conference-programs">Conference Program</a></li> <li><a href="https://waset.org/committees">Committees</a></li> <li><a href="https://publications.waset.org">Publications</a></li> </ul> </div> <div class="col-md-2"> <ul class="list-unstyled"> Research <li><a href="https://publications.waset.org/abstracts">Abstracts</a></li> <li><a href="https://publications.waset.org">Periodicals</a></li> <li><a href="https://publications.waset.org/archive">Archive</a></li> </ul> </div> <div class="col-md-2"> <ul class="list-unstyled"> Open Science <li><a target="_blank" rel="nofollow" href="https://publications.waset.org/static/files/Open-Science-Philosophy.pdf">Open Science Philosophy</a></li> <li><a target="_blank" rel="nofollow" href="https://publications.waset.org/static/files/Open-Science-Award.pdf">Open Science Award</a></li> <li><a target="_blank" rel="nofollow" href="https://publications.waset.org/static/files/Open-Society-Open-Science-and-Open-Innovation.pdf">Open Innovation</a></li> <li><a target="_blank" rel="nofollow" href="https://publications.waset.org/static/files/Postdoctoral-Fellowship-Award.pdf">Postdoctoral Fellowship Award</a></li> <li><a target="_blank" rel="nofollow" href="https://publications.waset.org/static/files/Scholarly-Research-Review.pdf">Scholarly Research Review</a></li> </ul> </div> <div class="col-md-2"> <ul class="list-unstyled"> Support <li><a href="https://waset.org/page/support">Support</a></li> <li><a href="https://waset.org/profile/messages/create">Contact Us</a></li> <li><a href="https://waset.org/profile/messages/create">Report Abuse</a></li> </ul> </div> </div> </div> </div> </div> <div class="container text-center"> <hr style="margin-top:0;margin-bottom:.3rem;"> <a href="https://creativecommons.org/licenses/by/4.0/" target="_blank" class="text-muted small">Creative Commons Attribution 4.0 International License</a> <div id="copy" class="mt-2">&copy; 2024 World Academy of Science, Engineering and Technology</div> </div> </footer> <a href="javascript:" id="return-to-top"><i class="fas fa-arrow-up"></i></a> <div class="modal" id="modal-template"> <div class="modal-dialog"> <div class="modal-content"> <div class="row m-0 mt-1"> <div class="col-md-12"> <button type="button" class="close" data-dismiss="modal" aria-label="Close"><span aria-hidden="true">&times;</span></button> </div> </div> <div class="modal-body"></div> </div> </div> </div> <script src="https://cdn.waset.org/static/plugins/jquery-3.3.1.min.js"></script> <script src="https://cdn.waset.org/static/plugins/bootstrap-4.2.1/js/bootstrap.bundle.min.js"></script> <script src="https://cdn.waset.org/static/js/site.js?v=150220211556"></script> <script> jQuery(document).ready(function() { /*jQuery.get("https://publications.waset.org/xhr/user-menu", function (response) { jQuery('#mainNavMenu').append(response); });*/ jQuery.get({ url: "https://publications.waset.org/xhr/user-menu", cache: false }).then(function(response){ jQuery('#mainNavMenu').append(response); }); }); </script> </body> </html>

Pages: 1 2 3 4 5 6 7 8 9 10