CINXE.COM

Archived - National First Nations Consolidated Infrastructure Investment Report 2013-2014

<!DOCTYPE html> <!--[if lt IE 9]><html class="no-js lt-ie9" lang="en" dir="ltr"><![endif] --> <!--[if gt IE 8]><! --> <html class="no-js" lang="en" dir="ltr"><!--<![endif] --> <head> <meta charset="utf-8"> <!-- Web Experience Toolkit (WET) / Boîte à outils de l'expérience Web (BOEW) wet-boew.github.io/wet-boew/License-en.html / wet-boew.github.io/wet-boew/Licence-fr.html --> <title>Archived - National First Nations Consolidated Infrastructure Investment Report 2013-2014 </title> <meta content="width=device-width,initial-scale=1" name="viewport"> <!-- analytics part A start --> <!-- Google Tag Manager --> <script>(function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start': new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:'';j.async=true;j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl;f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-NLBMCJ3');</script> <!-- End Google Tag Manager --> <!-- analytics part A end --> <!-- Meta data --> <meta name="dcterms.creator" content="Government of Canada; Indigenous Services Canada"> <meta name="dcterms.issued" title="W3CDTF" content="2015-12-17"> <meta name="dcterms.modified" title="W3CDTF" content="2015-12-17"> <meta name="description" content="Aboriginal Affairs and Northern Development Canada (AANDC) works with First Nation governments to support affordable and adequate housing, clean drinking water, modern and safe educational facilities, and other community infrastructure assets, such as roads and connectivity systems."> <meta name="dcterms.description" content="Aboriginal Affairs and Northern Development Canada (AANDC) works with First Nation governments to support affordable and adequate housing, clean drinking water, modern and safe educational facilities, and other community infrastructure assets, such as roads and connectivity systems."> <meta name="dcterms.language" title="ISO639-2" content="eng"> <meta name="dcterms.subject" title="gcinac" content="Aboriginal people; Capital; Capital budgets; Capital funds; Community infrastructures; Education; First Nation communities; First Nation schools; Housing; Infrastructures; Investments; Maintenance; Maintenance budgets; Schools; Secondary schools; Waste management; Waste water; Waste water disposal"> <meta name="dcterms.title" content="Archived - National First Nations Consolidated Infrastructure Investment Report 2013-2014"> <meta name="dcterms.type" title="gctype" content="report"> <meta name="dcterms.audience" title="gcaudience" content="aboriginal peoples; general public"> <meta name="gcterms.topicTaxonomy" content="Indigenous Services Canada > Infrastructure in Indigenous communities > First Nations Infrastructure Investment Plans"> <!-- Meta data --> <!-- Load closure template scripts --> <script type="text/javascript" src="https://www.canada.ca/etc/designs/canada/cdts/gcweb/rn/cdts/compiled/soyutils.js"></script> <script type="text/javascript" src="https://www.canada.ca/etc/designs/canada/cdts/gcweb/rn/cdts/compiled/wet-en.js"></script> <noscript> <!-- Write closure fall-back static file --> <!-- /ROOT/rn/cls/wet/gcweb/static/refTop.html --> <!--[if gte IE 9 | !IE ]><!--> <link href="https://www.canada.ca/etc/designs/canada/cdts/gcweb/rn/assets/favicon.ico" rel="icon" type="image/x-icon"> <link rel="stylesheet" href="https://www.canada.ca/etc/designs/canada/cdts/gcweb/rn/css/theme.min.css"> <link rel="stylesheet" href="https://www.canada.ca/etc/designs/canada/cdts/gcweb/rn/cdts/cdtsfixes.css"> <!--<![endif]--> <!--[if lt IE 9]> <link href="https://www.canada.ca/etc/designs/canada/cdts/gcweb/rn/assets/favicon.ico" rel="shortcut icon"> <link rel="stylesheet" href="https://www.canada.ca/etc/designs/canada/cdts/gcweb/rn/css/ie8-theme.min.css"> <![endif]--> <!--[if lte IE 9]><![endif]--> <link rel="stylesheet" href="https://www.canada.ca/etc/designs/canada/cdts/gcweb/rn/css/noscript.min.css"> </noscript> <script src="/DAM/PresentationDAM/STAGING/Scripts/inter-cdts.js"></script> <!-- Write closure template --> <script type="text/javascript"> document.write(wet.builder.refTop({ cdnEnv: "prod" })); </script> <!-- custom css --> <link href="/DAM/PresentationDAM/STAGING/css/cust-isc.css" media="screen, print" rel="stylesheet" type="text/css"> <!-- custom css end --> <!-- <script src="https://kit.fontawesome.com/e8a29f00c6.js" crossorigin="anonymous"></script> <link rel="stylesheet" href="https://kit.fontawesome.com/e8a29f00c6.css" crossorigin="anonymous"> --> <link rel="stylesheet" href="https://use.fontawesome.com/releases/v5.15.4/css/all.css" integrity="sha256-mUZM63G8m73Mcidfrv5E+Y61y7a12O5mW4ezU3bxqW4=" crossorigin="anonymous"/> </head> <body vocab="http://schema.org/" typeof="WebPage"> <span typeof="Organization"><meta property="legalName" content="Department_of_Indian_Affairs_and_Northern_Development"></span> <!-- analytics part B start --> <!-- Google Tag Manager (noscript) --> <noscript><iframe src="https://www.googletagmanager.com/ns.html?id=GTM-NLBMCJ3" height="0" width="0" style="display:none;visibility:hidden"></iframe></noscript> <!-- End Google Tag Manager (noscript) --> <!-- analytics part B end --> <div id="def-top"> </div> <!-- Write closure template --> <script type="text/javascript"> var defTop = document.getElementById("def-top"); defTop.outerHTML = wet.builder.customTop({ cdnEnv: "prod", showPreContent: false, lngLinks: [{lang: 'fr',href: 'https://www.sac-isc.gc.ca/fra/1450362516631/1533902129569',text: 'Français'},], customSearch: [{"action":"https://www.canada.ca/en/indigenous-services-canada/search.html"}], breadcrumbs: [{title: "Canada.ca", href: "https://www.canada.ca/en.html"},{title: "Indigenous Services Canada", href: "/eng/1518196579110/1520997240623"},{title: "Infrastructure in Indigenous communities", href: "/eng/1100100010567/1521125219538"},{title: "First Nations Infrastructure Investment Plans", href: "/eng/1440084290678/1533645718223"}] }); </script> <main role="main" property="mainContentOfPage" class="container"> <h1 property="name" id="wb-cont">Archived - National First Nations Consolidated Infrastructure Investment Report 2013-2014</h1> <section id="archived" class="alert alert-warning wb-inview" data-inview="archived-bnr"><h2>Archived information</h2><p>This Web page has been archived on the Web. Archived information is provided for reference, research or record keeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.</p></section><section id="archived-bnr" class="wb-overlay modal-content overlay-def wb-bar-t"><header><h2 class="wb-inv">Archived</h2></header><p><a href="#archived">This Web page has been archived on the Web.</a></p></section><section> <h2>Table of contents</h2> <ul class="colcount-sm-2 colcount-md-2"> <li><a href="#a1">1. Introduction</a></li> <li><a href="#a2">2. Program</a> <ul> <li><a href="#a3">Program Overview</a></li> <li><a href="#a4">Program Planning</a></li> <li><a href="#a5">Program Delivery</a></li> <li><a href="#a6">Program Oversight</a></li> <li><a href="#a7">Life Cycle of Funded Assets</a></li> <li><a href="#a8">Performance Measurement</a></li> </ul> </li> <li><a href="#a9">3. Funding</a> <ul> <li><a href="#a10">Funding Allocations</a></li> <li><a href="#a11">Eligible Initiatives and Projects</a></li> <li><a href="#a12">Capital Facilities and Maintenance Program at a Glance 2013-2014</a></li> <li><a href="#a13">Investment Highlights</a></li> </ul> </li> <li><a href="#a14">4. Water &amp; Wastewater</a> <ul> <li><a href="#a15">Sub-Category Description</a></li> <li><a href="#a16">Oversight</a></li> <li><a href="#a17">Water &amp; Wastewater at a Glance 2013-2014</a></li> <li><a href="#a18">Investment Highlights</a></li> <li><a href="#a19">Looking Forward</a></li> </ul> </li> <li><a href="#a20">5. Education Facilities</a> <ul> <li><a href="#a21">Sub-Category Description</a></li> <li><a href="#a22">Oversight</a></li> <li><a href="#a23">Education at a Glance 2013-2014</a></li> <li><a href="#a24">Investment Highlights</a></li> <li><a href="#a25">Looking Forward</a></li> </ul> </li> <li><a href="#a26">6. Housing</a> <ul> <li><a href="#a27">Sub-Category Description</a></li> <li><a href="#a28">Oversight</a></li> <li><a href="#a29">Housing at a Glance 2013-2014</a></li> <li><a href="#a30">Investment Highlights</a></li> <li><a href="#a31">Looking Forward</a></li> </ul> </li> <li><a href="#a32">7. Other Community Infrastructure</a> <ul> <li><a href="#a33">Sub-Category Description</a></li> <li><a href="#a34">Other Community Infrastructure at a Glance 2013-2014</a></li> <li><a href="#a35">Investment Highlights</a></li> <li><a href="#a36">Looking Foreward</a></li> </ul> </li> <li><a href="#a37">8. Conclusion&nbsp;&ndash; Long-term Initiatives</a></li> <li><a href="#a38">Annex&nbsp;A: 372 Water &amp; Wastsewater Projects (April&nbsp;1,&nbsp;2013 to March&nbsp;31,&nbsp;2014)</a></li> <li><a href="#a39">Annex&nbsp;B: 99 School Projects (April&nbsp;1,&nbsp;2013 to March&nbsp;31,&nbsp;2014)</a></li> <li><a href="#a40">Annex&nbsp;C: 232 Housing Projects (April&nbsp;1,&nbsp;2013 to March&nbsp;31,&nbsp;2014)</a></li> <li><a href="#a41">Annex&nbsp;D: 289 Other Community Infrastructure Projects (April&nbsp;1,&nbsp;2013 to March&nbsp;31,&nbsp;2014)</a></li> <li><a href="#a42">Annex&nbsp;E: Glossary of Acronyms and Terms</a></li> </ul> </section> <section> <h2 id="a1">1. Introduction</h2> <p>Aboriginal Affairs and Northern Development Canada&nbsp;(AANDC) works with First Nation governments to support affordable and adequate housing, clean drinking water, modern and safe educational facilities, and other community infrastructure assets, such as roads and connectivity systems. These projects are essential to healthy, safe, and prosperous First Nation communities.</p> <p>The First Nations Consolidated Infrastructure Investment Report encompasses the reporting period from April&nbsp;1,&nbsp;2013 to March&nbsp;31,&nbsp;2014. The information is presented as an annual report to align with the Annual Performance Inspection cycle, the Annual Asset Condition Reporting cycle, and the annual Data Collection Instrument cycle.</p> <p>Overall, between April&nbsp;1,&nbsp;2013 and March&nbsp;31,&nbsp;2014, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> invested approximately $1&nbsp;billion in First Nations infrastructure, which was provided through <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr>'s Capital Facilities and Maintenance Program.</p> <p>This report follows the organization of <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr>'s Program Alignment Architecture, breaking down the program by asset categories under four sub-programs.</p> <ul> <li>3.4.1&nbsp;&ndash; Water &amp; Wastewater</li> <li>3.4.2&nbsp;&ndash; Education Facilities</li> <li>3.4.3&nbsp;&ndash; Housing</li> <li>3.4.4&nbsp;&ndash; Other Community Infrastructure</li> </ul> </section> <section> <h2 id="a2">2. Program</h2> <section> <h3 id="a3">Program Overview</h3> <p>The purpose of the Capital Facilities and Maintenance Program is to provide financial support and advice to First Nations in acquiring, constructing, operating and maintaining community infrastructure at standards comparable to neighbouring communities. The program makes investments to maximize the life cycle of physical assets, mitigate health and safety risks, ensure assets meet applicable codes and standards, and ensure assets are managed in a cost-effective and efficient manner.</p> <p>The Capital Facilities and Maintenance Program provides funding for housing and community infrastructure, including water and wastewater systems, education facilities, roads and bridges, electrification, and community buildings, as well as funding for capacity building, including water and wastewater system operators training and fire protection awareness.</p> </section> <section> <h3 id="a4">Program Planning</h3> <p>Under the Management Control Framework for the Capital Facilities and Maintenance Program, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> uses <a href="/eng/1100100010567/1521125219538">First Nation Infrastructure Investment Plans</a> for capital planning. This process aims to improve resource management and increase accountability through better capital planning. An effective process depends on:</p> <ul> <li>nationally consistent planning practices, such as using a standardized Regional First Nation Infrastructure Investment Plan template;</li> <li>using the best-available information to create plans and then to update them to reflect the current situation;</li> <li>submission of community plans to their respective regions, followed by submission of regional plans to <abbr title="Headquarters">HQ</abbr>, as per established timelines; and</li> <li>plans that are balanced with community and regional allocations.</li> </ul> <p>The <abbr title="First Nations Infrastructure Investment Plan">FNIIP</abbr> planning process reflects the existing approval authorities and roles and responsibilities set out in the Management Control Framework. It is designed around three linked plans that feed into each other:</p> <ul> <li>a community level plan, detailing infrastructure needs;</li> <li>a regional plan, planning out program investments; and</li> <li>a national plan, that provides a strategic overview of First Nations infrastructure needs and Capital Facilities and Maintenance Program investments.</li> </ul> </section> <section> <h3 id="a5">Program Delivery</h3> <p>Contributions to eligible recipients under the Capital Facilities and Maintenance Program provides financial assistance to plan, construct and/or acquire, and operate and maintain community capital facilities and services (infrastructure, including schools) and housing (residential) consistent with approved policies and standards. This assistance is provided to First Nations on reserves, as well as First Nations and other eligible recipients on Crown land or recognized Indian land.</p> <p>The Department's Regional Offices work in collaboration with First Nations to establish and prioritize their community First Nation Infrastructure Investment Plan according to the Capital Facilities and Maintenance Program's National Priority Ranking Framework. The highest priority is assigned to those projects which mitigate the most urgent health and safety risks. Protection of assets through adequate operation and maintenance is also important to mitigating health and safety concerns and ensuring that existing and new assets reach their full life cycle.</p> <p><abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr>'s policies and procedures relating to the Capital Facilities and Maintenance Program are set out in a number of frameworks. These policies are mainly in the department's Level of Service Standards, as well as the protocols for drinking water and wastewater systems, and the school space accommodation standards. The Department's policy, as stated in the Level of Service Standards, is to support and assist First Nations in providing basic community services comparable to the levels of services that would generally be available in non-First Nations communities of similar size and circumstances.</p> </section> <section> <h3 id="a6">Program Oversight</h3> <p><abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> provides funding support to First Nations to pay for operations and maintenance during the service life of their assets. <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> tracks the ongoing condition of these assets through different mechanisms. For water and wastewater systems, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> tracks the systems' risk level through Annual Performance Inspections. For education facilities and other community infrastructure, including water and wastewater systems, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> tracks their ongoing condition through inspections that are carried out at least once every three years with the Asset Condition Reporting Systems. First Nations report on the adequacy of their housing on an annual basis with the use of a Data Collection Instrument.</p> </section> <section> <h3 id="a7">Life Cycle of Funded Assets</h3> <p><abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> promotes a life cycle approach for infrastructure assets starting with the use of full life-cycle costing when approving capital construction projects. This type of analysis allows for the consideration of all the associated costs (e.g. for design, construction, operation and maintenance, insurance, and major renovations) of the proposed infrastructure throughout its entire life cycle. This information is used to make comparisons between proposed options (e.g. building an expensive installation with low operating and maintenance costs versus a less-expensive facility with higher operating and maintenance costs) to determine the most cost-effective option in the short-, medium-, and long-term. This exercise is also useful in determining the funding levels required from the First Nation in future years for the operation and maintenance of the proposed infrastructure.</p> <p>During an asset's service life, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> provides funding support to First Nations to help pay for the operation and maintenance costs of funded infrastructure assets. <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> also encourages good asset management practices by recommending that First Nations implement Maintenance Management Plans for major capital assets. To help First Nations achieve longer term use of existing assets, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> funds inspections of some&nbsp;community assets, such as schools and water and wastewater systems. Currently, the performance of water and wastewater systems is assessed annually while the condition of schools and other asset classes, including water and wastewater systems, is inspected on a three year cycle at a minimum.</p> <p>As part of its efforts to encourage good asset management, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> funds an on-site training and mentoring program for water and wastewater system operators in First Nation communities called the Circuit Rider Training Program. This program has helped improve the capacity levels of the water and wastewater systems operators and the operation of systems, as well as helping First Nations benefit from the full service life of these assets.</p> </section> <section> <h3 id="a8">Performance Measurement</h3> <p>In 2013-2014, performance for the Capital Facilities and Maintenance Program is measured in accordance with the program's 2009 Performance Measurement Strategy. The program has 21&nbsp;Key Performance Indicators with targets set until&nbsp;2016. The Performance Measurement Strategy was renewed in April&nbsp;2014 with 20&nbsp;Key Performance Indicators with targets set until&nbsp;2019. Performance results are reported in the Departmental Performance Report as well as in the Federal Sustainable Development Strategy for water and wastewater system risk.</p> </section> </section> <section> <h2 id="a9">3. Funding</h2> <section> <h3 id="a10">Funding Allocations</h3> <p><abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> allocates funding for the construction and the maintenance of community infrastructure to First Nations at regional level through formula and/or proposal based project funding. The Capital Facilities and Maintenance Program budget is divided into:</p> <p><b>Formula-based funding</b>, which includes:</p> <ul> <li><cite>Operations and Maintenance</cite><sup id="fn1-rf"><a class="fn-lnk" href="#fn1"><span class="wb-inv">Footnote </span>1</a></sup> for the operation and maintenance of existing community infrastructure assets. The level of funding provided to the First Nation varies from 20&nbsp;per cent to 100&nbsp;per cent depending on the type of asset.</li> <li><cite>Minor Capital Formula:</cite><sup id="fn2-rf"><a class="fn-lnk" href="#fn2"><span class="wb-inv">Footnote </span>2</a></sup> for housing and for acquisition, construction, renovation, or repair projects valued below $1.5&nbsp;million.</li> </ul> <p><b>Proposal-based funding</b>, which includes:</p> <ul> <li><cite>Minor Capital:</cite> for housing and for acquisition, construction, renovation, or repair projects valued below $1.5&nbsp;million.</li> <li><cite>Major Capital:</cite> for specific construction, acquisition, renovation, or significant repair projects valued above $1.5&nbsp;million.</li> </ul> <p>Major capital projects are funded primarily by targeted initiatives such as: funding announced by the Government of Canada for education facilities as part of the <a href="http://www.budget.gc.ca/2012/plan/chap3-3-eng.html" rel="external">Economic Action Plan&nbsp;2012</a>, the continuation of the First Nation Infrastructure Fund announced in <a href="http://www.budget.gc.ca/2013/doc/themes/infrastructure-eng.html" rel="external">Economic Action Plan&nbsp;2013</a>, the extension of the First Nations Water &amp; Wastewater Action Plan, the $500&nbsp;million over seven years for Education Facilities and the $40&nbsp;million over five years for Disaster Mitigation, each announced in <a href="http://www.budget.gc.ca/2014/docs/plan/ch3-4-eng.html" rel="external">Economic Action Plan&nbsp;2014</a>.</p> </section> <section> <h3 id="a11">Eligible Initiatives and Projects</h3> <p>Eligible initiatives and projects are those that assist First Nations in acquiring, constructing, and operating and maintaining housing and community infrastructure including water and wastewater systems, schools, roads and bridges, electrification, and community buildings; to sustain community infrastructure including solid waste management; energy systems; local roads and bridges; connectivity; and planning and skills development or to hold activities to raise the level of fire protection awareness. The Capital Facilities and Maintenance Program's <a href="/eng/1386694148066/1615723191777">Contributions to Support the Construction and Maintenance of Community Infrastructure</a> provide further details on what supports are provided to eligible recipients.</p> </section> <section> <h3 id="a12">Capital Facilities and Maintenance Program at Glance 2013-2014</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 3.1: 2013-2014 Actual Expenditures&nbsp;&ndash; All Assets </caption> <colgroup> <col class="col-md-8"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th colspan="2" id="T1-row-1"><b>A-Base Allocations to Eligible Recipients (Vote&nbsp;10)</b></th> </tr> </thead> <tbody> <tr> <th id="T1-row-2" headers="T1-row-1">Capital</th> <td headers="T1-row-2 T1-row-1" class="text-right">$414,406,197</td> </tr> <tr> <th id="T1-row-3" headers="T1-row-1">Operations and Maintenance</th> <td headers="T1-row-3 T1-row-1" class="text-right">$368,425,431</td> </tr> <tr> <th id="T1-row-4" headers="T1-row-1"><b>Total A-Base</b></th> <td headers="T1-row-4 T1-row-1" class="text-right"><b>$782,831,628</b></td> </tr> <tr class="active"> <th colspan="2" id="T1-row-5">Targeted Allocations to Eligible Recipients (Vote 10)</th> </tr> <tr> <th id="T1-row-6" headers="T1-row-5">First Nations Water and Wastewater Action Plan</th> <td headers="T1-row-6 T1-row-5" class="text-right">$147,271,856</td> </tr> <tr> <th id="T1-row-7" headers="T1-row-5">Fuel Tanks</th> <td headers="T1-row-7 T1-row-5" class="text-right">$21,834,576</td> </tr> <tr> <th id="T1-row-8" headers="T1-row-5">First Nation Infrastructure Fund</th> <td headers="T1-row-8 T1-row-5" class="text-right">$3,026,983</td> </tr> <tr> <th id="T1-row-9" headers="T1-row-5">Gas Tax Fund&nbsp;&ndash; Schools</th> <td headers="T1-row-9 T1-row-5" class="text-right">$3,000,000</td> </tr> <tr> <th id="T1-row-10" headers="T1-row-5">Budget 2012 Schools</th> <td headers="T1-row-10 T1-row-5" class="text-right">$41,984,817</td> </tr> <tr> <th id="T1-row-11" headers="T1-row-5">James Bay Cree</th> <td headers="T1-row-11 T1-row-5" class="text-right">$5,527,047</td> </tr> <tr> <th id="T1-row-12" headers="T1-row-5"><b>Total Targeted</b></th> <td headers="T1-row-12 T1-row-5" class="text-right"><b>$222,645,279</b></td> </tr> <tr> <th id="T1-row-13" headers="T1-row-5"><b>Total A-Base and Targeted (Vote&nbsp;10)</b></th> <td headers="T1-row-13 T1-row-5" class="text-right"><b>$1,005,476,907</b></td> </tr> <tr class="active"> <th colspan="2" id="T1-row-14">2013-2014 Salary &amp; Administration (Votes 1&amp;5)</th> </tr> <tr> <th id="T1-row-15" headers="T1-row-14"><b>Total Salary &amp; Administration</b></th> <td headers="T1-row-15 T1-row-14" class="text-right"><b>$29,556,369</b></td> </tr> </tbody> <tfoot> <tr> <th id="T1-row-16" headers="T1-row-14"><b>Total Investments </b></th> <td headers="T1-row-16 T1-row-14" class="text-right"><b>$1,035,033,276</b></td> </tr> </tfoot> </table> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 3.2: Regional Funding Level&nbsp;&ndash; A-Base &amp; Targeted (Vote&nbsp;10) </caption> <colgroup> <col class="col-md-8"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th id="T2-col-1">Region</th> <th id="T2-col-2" class="text-right">Funding</th> </tr> </thead> <tbody> <tr> <th id="T2-row-1" headers="T2-col-1">Atlantic</th> <td headers="T2-col-2 T2-row-1 T2-col-1" class="text-right">$40,997,945</td> </tr> <tr> <th id="T2-row-2" headers="T2-col-1">Quebec</th> <td headers="T2-col-2 T2-row-2 T2-col-1" class="text-right">$74,936,933</td> </tr> <tr> <th id="T2-row-3" headers="T2-col-1">Ontario</th> <td headers="T2-col-2 T2-row-3 T2-col-1" class="text-right">$233,043,740</td> </tr> <tr> <th id="T2-row-4" headers="T2-col-1">Manitoba</th> <td headers="T2-col-2 T2-row-4 T2-col-1" class="text-right">$209,943,882</td> </tr> <tr> <th id="T2-row-5" headers="T2-col-1">Saskatchewan</th> <td headers="T2-col-2 T2-row-5 T2-col-1" class="text-right">$147,950,744</td> </tr> <tr> <th id="T2-row-6" headers="T2-col-1">Alberta</th> <td headers="T2-col-2 T2-row-6 T2-col-1" class="text-right">$137,933,935</td> </tr> <tr> <th id="T2-row-7" headers="T2-col-1">British Columbia</th> <td headers="T2-col-2 T2-row-7 T2-col-1" class="text-right">$145,963,982</td> </tr> <tr> <th id="T2-row-8" headers="T2-col-1">Yukon</th> <td headers="T2-col-2 T2-row-8 T2-col-1" class="text-right">$7,267,240</td> </tr> <tr> <th id="T2-row-9" headers="T2-col-1"><abbr title="Headquarters">HQ</abbr></th> <td headers="T2-col-2 T2-row-9 T2-col-1" class="text-right">$7,438,506</td> </tr> </tbody> <tfoot> <tr> <th class="text-left" id="T2-row-10" headers="T2-col-1"><b>Total</b></th> <td headers="T2-col-2 T2-row-10 T2-col-1" class="text-right"><b>$1,005,476,907</b></td> </tr> </tfoot> </table> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 3.3: Number of Funded Proposal-Based Capital Facilities and Maintenance Program Projects </caption> <colgroup> <col class="col-md-4"> <col class="col-md-4"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th id="T3-col-1">Region</th> <th id="T3-col-2" class="text-right">Number in Progress</th> <th id="T3-col-3" class="text-right">Number Completed</th> </tr> </thead> <tbody> <tr> <th id="T3-row-1" headers="T3-col-1"> Atlantic</th> <td headers="T3-col-2 T3-row-1 T3-col-1" class="text-right"> 13</td> <td headers="T3-col-3 T3-row-1 T3-col-1" class="text-right">44</td> </tr> <tr> <th id="T3-row-2" headers="T3-col-1">Quebec</th> <td headers="T3-col-2 T3-row-2 T3-col-1" class="text-right"> 23</td> <td headers="T3-col-3 T3-row-2 T3-col-1" class="text-right"> 54</td> </tr> <tr> <th id="T3-row-3" headers="T3-col-1">Ontario</th> <td headers="T3-col-2 T3-row-3 T3-col-1" class="text-right">61</td> <td headers="T3-col-3 T3-row-3 T3-col-1" class="text-right">87</td> </tr> <tr> <th id="T3-row-4" headers="T3-col-1">Manitoba</th> <td headers="T3-col-2 T3-row-4 T3-col-1" class="text-right">30</td> <td headers="T3-col-3 T3-row-4 T3-col-1" class="text-right">32</td> </tr> <tr> <th id="T3-row-5" headers="T3-col-1">Saskatchewan</th> <td headers="T3-col-2 T3-row-5 T3-col-1" class="text-right">50</td> <td headers="T3-col-3 T3-row-5 T3-col-1" class="text-right">36</td> </tr> <tr> <th id="T3-row-6" headers="T3-col-1">Alberta</th> <td headers="T3-col-2 T3-row-6 T3-col-1" class="text-right">15</td> <td headers="T3-col-3 T3-row-6 T3-col-1" class="text-right">117</td> </tr> <tr> <th id="T3-row-7" headers="T3-col-1">British Columbia</th> <td headers="T3-col-2 T3-row-7 T3-col-1" class="text-right">127</td> <td headers="T3-col-3 T3-row-7 T3-col-1" class="text-right">294</td> </tr> <tr> <th id="T3-row-8" headers="T3-col-1">Yukon</th> <td headers="T3-col-2 T3-row-8 T3-col-1" class="text-right">3</td> <td headers="T3-col-3 T3-row-8 T3-col-1" class="text-right">6</td> </tr> <tr> <th id="T3-row-9" headers="T3-col-1"><abbr title="Headquarters">HQ</abbr></th> <td headers="T3-col-2 T3-row-9 T3-col-1" class="text-right">0</td> <td headers="T3-col-3 T3-row-9 T3-col-1" class="text-right">0</td> </tr> </tbody> <tfoot> <tr> <th id="T3-row-10" headers="T3-col-1"><b>Total</b></th> <td headers="T3-col-2 T3-row-10 T3-col-1" class="text-right"><b> 322</b></td> <td headers="T3-col-3 T3-row-10 T3-col-1" class="text-right"><b>670</b></td> </tr> </tfoot> </table> </div> <div class="row mrgn-tp-md"> <div class="col-md-12"> <figure> <figcaption>Graph 3.1: 5-Year Funding Trend (All Votes)&nbsp;&ndash; All Assets&nbsp;($<abbr title="million">M</abbr>)</figcaption> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR_Graph_3_1_1450367925910_eng.jpg" alt="Graph 3.1: 5-Year Funding Trend&nbsp;&ndash; All Assets" class="img-responsive"> <details class="mrgn-tp-md mrgn-bttm-md"> <summary class="wb-toggle bg-warning" data-toggle='{"print": "on"}'>Description of Graph 3.1&nbsp;&ndash; 5-Year Funding Trend (All Votes)&nbsp;&ndash; All Assets&nbsp;($<abbr title="million">M</abbr>)</summary> <p>This is a chart showing the five year funding trend of the entire Capital Facilities Maintenance Program (CFMP) for the years 2009-2010 to 2013-2014. Each fiscal year is divided into A-Base funding, Targeted funding, and Salary &amp; Administration funding. The graph is a stacked bar chart.</p> <ul> <li>In 2009-2010, A-Base represents $813<abbr title="million">M</abbr>, Targeted $441<abbr title="million">M</abbr> and Salary &amp; Administration $36<abbr title="million">M</abbr> for a total of $1,290<abbr title="million">M</abbr>.</li> <li>In 2010-2011, A-Base represents $755<abbr title="million">M</abbr>, Targeted $504<abbr title="million">M</abbr> and Salary &amp; Administration $38<abbr title="million">M</abbr> for a total of $1,297<abbr title="million">M</abbr>.</li> <li>In 2011-2012, A-Base represents $780<abbr title="million">M</abbr>, Targeted $279<abbr title="million">M</abbr> and Salary &amp; Administration $34<abbr title="million">M</abbr> for a total of $1,093<abbr title="million">M</abbr>.</li> <li>In 2012-2013, A-Base represents $755<abbr title="million">M</abbr>, Targeted $282<abbr title="million">M</abbr> and Salary &amp; Administration $33<abbr title="million">M</abbr> for a total of $1,070<abbr title="million">M</abbr>.</li> <li>In 2013-2014, A-Base represents $783<abbr title="million">M</abbr>, Targeted $223<abbr title="million">M</abbr> and Salary &amp; Administration $30<abbr title="million">M</abbr> for a total of $1,036<abbr title="million">M</abbr>.</li> </ul> </details> </figure> </div> </div> <p>Graph 3.1 shows the funding that has been provided by the Capital Facilities and Maintenance Program over the past five years. As can be seen, A-base provides the majority of funds to First Nation infrastructure projects, followed by targeted initiatives, such as First Nations Water and Wastewater Action Plan, and the smallest portion of funding goes to salaries and administration. While A-base and salary and administration funding will stay relatively constant, targeted initiatives fluctuate more from year to year as special programs come to an end or as new initiatives are announced by the Government of Canada. In each of the following sections for each program area a similar graph will be provided, with funding broken into the three areas of A-base, Targeted Initiatives and Salary and Administration for the past five years.</p> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 3.4: Key Performance Indicators </caption> <colgroup> <col class="col-md-4"> <col class="col-md-4"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th scope="col">Expected Results</th> <th scope="col">Performance Indicators</th> <th scope="col">Targets</th> </tr> </thead> <tbody> <tr> <td>First Nations communities have a base of infrastructure that protects the health and safety and enables engagement in the economy</td> <td>Positive change in rating in the Community Well-Being Index (employment, income, education and housing sub-indices)</td> <td>Achieve Index rating greater than 57 by March&nbsp;31,&nbsp;2016</td> </tr> </tbody> </table> </div> </section> <section> <div class="clearfix">&nbsp;</div> <h3 id="a13">Investment Highlights</h3> <p>In 2013-2014, the Department saw some major achievements in the area of infrastructure. The <cite>Safe Drinking Water for First Nations Act</cite> received Royal Assent on June&nbsp;19,&nbsp;2013 and came into force on November&nbsp;1,&nbsp;2013. This Act will help to ensure the safety of drinking water on reserves and will result in the development of regulations for all First Nation communities that are consistent with what exists in other Canadian communities. In addition, on February&nbsp;17,&nbsp;2014, the Government of Canada committed to the continued implementation of the First Nations Water and Wastewater Action Plan with an additional $323.4&nbsp;million over two years to improve water and wastewater infrastructure in First Nation communities.</p> <p>Fire safety was an important focus for <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> throughout 2013-2014. In partnership with the Aboriginal Firefighters' Association of Canada, the Department supported the launch of the national BeFireSafe education campaign on March&nbsp;20,&nbsp;2014 to raise awareness of the importance of fire prevention in First Nation communities.</p> <p>In April&nbsp;2013,&nbsp;<abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr>&nbsp;continued its collaboration with&nbsp;Canada Mortgage and Housing Corporation to improve housing outcomes with the signing of a Memorandum of Understanding. This was an important milestone towards improving partnerships between federal organizations with the common goal of improving housing outcomes on reserve. It will enable the organizations to increase the sharing of information related to capacity-development initiatives and promote project collaboration where feasible.</p> <p>Finally, another highlight in 2013-2014 was the successful support of the National First Nations Infrastructure Conference and Tradeshow &quot;Building for a Sustainable Future&quot; organized by the Assembly of First Nations. This conference focused on a wide range of infrastructure topics including alternative infrastructure financing options and procurement strategies,&nbsp;innovative technologies for water, housing and infrastructure and&nbsp;housing capacity development opportunities. This conference saw First Nations convene in Toronto for two days of meeting and discussions, and had 526 participants from across the country.</p> </section> </section> <section> <h2 id="a14">4. Water &amp; Wastewater</h2> <section> <h3 id="a15">Sub-Category Description</h3> <p>The goal of the Water and Wastewater sub-category is to support residents on First Nations land in meeting health and safety standards and quality service comparable to those enjoyed by other Canadians living in communities of similar size and location. The Government of Canada's comprehensive long-term strategic approach to support improved drinking water and wastewater systems on First Nations lands is based on the following four pillars: enhanced capacity building and operator training (in particular through the Circuit Rider Training Program), enforceable standards and protocols, infrastructure investments, and protection of public health.</p> <p>This sub-category supports the provision of funding for the planning, procurement, design, construction, upgrade, renovation, decommissioning, and operation and maintenance of infrastructure facilities, including: community water supply, treatment and distribution systems; and community wastewater collection, treatment and disposal systems. It includes the provision of funding for: coordination, training and capacity building for activities related to water and wastewater facilities, identification of on-reserve water and wastewater infrastructure needs, development of water and wastewater infrastructure capital plans, and the planning and delivery of water and wastewater services on-reserve.</p> <p>As First Nations are owners of their water and wastewater systems and are responsible for their daily operation and management, they are responsible for identifying funding requirements supporting their infrastructure and, in collaboration with <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> regional offices, ensuring these are included in the First Nation Infrastructure Investment Plan, which captures proposal and formula-based infrastructure needs for all asset categories, including water and wastewater.</p> <p>In addition to the recurring base budget&nbsp;(A-Base) provided towards First Nations water and wastewater systems, the Water and Wastewater Program makes annual investments through the First Nations Water and Wastewater Action Plan. This horizontal initiative, which was first introduced in 2008 and recently extended by the Government of Canada over two years, beginning in 2014-2015, is a joint <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr>-Health Canada initiative that aims at improving the health and quality of life of people in First Nation communities by assisting First Nations to provide better water and wastewater services to their residents.</p> <p>The First Nations Water and Wastewater Action Plan resource allocations are prioritized as follows:</p> <ul> <li>Priority 1&nbsp;&ndash; Operation and Maintenance: Operations and Maintenance of water and wastewater facilities and systems.</li> <li>Priority 2&nbsp;&ndash; Training/capacity to operate: the Circuit Rider Training Program and the additional training of water and wastewater operators (e.g. courses, travel to courses, fees for exams, other certification-related expenses).</li> <li>Priority 3&nbsp;&ndash; Capital: construction and upgrades to water and wastewater facilities and systems: <ul> <li>Supporting First Nations in completing contractual obligations; </li> <li>Bringing existing systems up to standard; and </li> <li>Construction of significant upgrades and/or new systems. </li> </ul> </li> </ul> <p>To be eligible for <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> funding, all water and wastewater projects proposals must demonstrate that the systems are designed to meet and be operated according to the standards found within the <cite>Protocol for Centralised Drinking Water Systems in First Nations Communities</cite>, the <cite>Protocol for Centralised Wastewater Systems in First Nations Communities</cite>, and the <cite>Protocol for Decentralised Water and Wastewater Systems in First Nations Communities</cite>.</p> <p>Projects must also demonstrate that they are the most cost-effective solution after examining all options, including but not limited to decentralized systems, trucked systems, piped systems, and mixes thereof, as per <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr>'s <cite>Water and Wastewater Policy and Level of Services Standards</cite>.</p> <p>In addition to capital investments, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> provides First Nations with ongoing Operations and Maintenance investments for water and wastewater systems built with departmental funds. As owners of the facilities, First Nations are responsible for the operation and maintenance, and are expected to contribute to the associated costs. The Department's policy is to fund up to 80&nbsp;percent of Operations and Maintenance expenses for water and wastewater facilities.</p> <p>Operations and Maintenance funding supports operation costs such as the purchase of chemicals to treat water and wastewater, operational supplies, salaries and training and other personnel costs. Funding for maintenance is provided to ensure that systems continue to run safely and in optimal condition throughout their lifespan. Operations and Maintenance funding amounts vary based on the number of systems being funded and on the type and size of the systems, operator training needs and the remoteness level. Remoteness level is considered as it affects costs related to availability and transportation of goods.</p> <p>Furthermore, in order to help communities build capacity to manage, operate and maintain their water and wastewater facilities, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> provides funding to various partners that provide community operators with training to manage, operate and maintain their water and wastewater facilities through the Circuit Rider Training Program. The Circuit Rider Training Program coordinates a rotation of qualified experts through a circuit of First Nations communities, providing the First Nation water and wastewater operators with on-site, hands-on training and mentoring for operating and maintaining their drinking water and wastewater systems. The program provides operators additional support via 24-hour hotlines for advice and trouble-shooting during normal operations and for any emergencies that may arise.</p> </section> <section> <h3 id="a16">Oversight</h3> <p>To protect public health and safety, and ensure drinking water and wastewater systems are reliable throughout their life-span, these systems are inspected regularly to monitor their physical condition, identify maintenance deficiencies, and monitor ongoing system performance in providing safe drinking water and effectively treated wastewater effluent.</p> <p>Asset Condition Reporting Systems inspections are performed once every three years by a qualified person to assess condition of the asset, adequacy of maintenance efforts and needs for additional maintenance work. The inspection results are used in establishing regional prioritization for funding allocations during the First Nations Infrastructure Investment Plan process.</p> <p>Annual Performance Inspections, which include site visits conducted by a qualified inspector, are carried out annually to assess program key performance indicators and risk levels, per the protocols. In order to address the most pressing needs in First Nations communities, the Department uses the results from the Annual Performance Inspection to develop action plans to address noted deficiencies for the systems inspected and to help prioritize risk mitigation activities. Risk levels are also fed into the <cite>National Priority Ranking Framework</cite> and the <cite>Priority Framework for Water and Wastewater Projects</cite>, which are tools used to prioritize projects in the development of long-term First Nations Infrastructure Investment plans.</p> <p><abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> measures risk comprehensively by taking into account an extensive set of factors that could lead to problems with water and wastewater systems. It is important to note that a risk rating is a measure of overall system risk, not of water or wastewater safety or quality.</p> <p>Overall system risk is calculated using a weighted value for each category as follows:</p> <div class="table-responsive col-md-12"> <div class="col-md-6 col-xs-6"> <p><b>Water Systems</b></p> <ul> <li>Source Water Risk: 10%</li> <li>Design Risk: 30%</li> <li>Operation and Maintenance Risk: 30%</li> <li>Record Keeping and Reporting Risk: 10%</li> <li>Operator Risk: 20%</li> </ul> </div> <div class="col-md-6 col-xs-6"> <p><b>Wastewater Systems</b></p> <ul> <li>Effluent Risk: 20%</li> <li>Design Risk: 25%</li> <li>Operation and Maintenance Risk: 25%</li> <li>Record Keeping and Reporting Risk: 10%</li> <li>Operator Risk: 20%</li> </ul> </div> </div> <p>The following priority ranking matrix has been applied to both water and wastewater systems (scores are out of 10).</p> <ul> <li>Low Risk (scores of 1 to 4): systems that operate with minor or no deficiencies.</li> <li>Medium Risk (scores of 4.1 to 7): systems that have deficiencies that, individually or combined, pose a medium risk to the quality of water and human health.</li> <li>High Risk (scores of 7.1 to 10): systems with major deficiencies that, individually or combined, pose a high risk to the quality of water.</li> </ul> <p>The results of the 2013-2014 Annual Performance Inspections cycle show that the number of water systems rated as high risk has decreased by 9 per cent and the number of wastewater systems rated as high risk has decreased by 5&nbsp;per cent since 2011-2012 Annual Performance Inspections were conducted.</p> </section> <section> <h3 id="a17">Water & Wastewater at a Glance 2013-2014</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 4.1: 2013-2014 Actual Expenditures&nbsp;&ndash; Water &amp; Wastewater </caption> <colgroup> <col class="col-md-8"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th colspan="2" id="T4-row-1"><b>A-Base Allocations to Eligible Recipients (Vote&nbsp;10)</b></th> </tr> </thead> <tbody> <tr> <th id="T4-row-2" headers="T4-row-1">Capital</th> <td headers="T4-row-2 T4-row-1" class="text-right">$57,038,965</td> </tr> <tr> <th id="T4-row-3" headers="T4-row-1">Operations and Maintenance</th> <td headers="T4-row-3 T4-row-1" class="text-right">$81,477,619</td> </tr> <tr> <th id="T4-row-4" headers="T4-row-1"><b>Total A-Base*</b></th> <td headers="T4-row-4 T4-row-1" class="text-right"><b>$138,516,584</b></td> </tr> <tr class="active"> <th colspan="2" id="T4-row-5">Targeted Allocations to Eligible Recipients (Vote 10)</th> </tr> <tr> <th id="T4-row-6" headers="T4-row-5">First Nations Water and Wastewater Action Plan Capital</th> <td headers="T4-row-6 T4-row-5" class="text-right">$88,989,646</td> </tr> <tr> <th id="T4-row-7" headers="T4-row-5">First Nations Water and Wastewater Action Plan Operations and Maintenance</th> <td headers="T4-row-7 T4-row-5" class="text-right">$58,282,210</td> </tr> <tr> <th id="T4-row-12" headers="T4-row-5"><b>Total First Nations Water and Wastewater Action Plan Targeted</b></th> <td headers="T4-row-12 T4-row-5" class="text-right"><b>$147,271,856</b></td> </tr> <tr> <th id="T4-row-13" headers="T4-row-5"><b>Total A-Base and Targeted (Vote 10)</b></th> <td headers="T4-row-13 T4-row-5" class="text-right"><b>$285,788,440</b></td> </tr> <tr class="active"> <th colspan="2" id="T4-row-14">2013-2014 Salary &amp; Administration (Votes 1&amp;5)</th> </tr> <tr> <th id="T4-row-15" headers="T4-row-14"><b>Total Salary &amp; Administration</b></th> <td headers="T4-row-15 T4-row-14" class="text-right"><b>$9,309,215</b></td> </tr> </tbody> <tfoot> <tr> <th id="T4-row-16" headers="T4-row-14"><b>Total Investments </b></th> <td headers="T4-row-16 T4-row-14" class="text-right"><b>$295,097,655</b></td> </tr> <tr> <td colspan="2">*While total Vote&nbsp;10 funding provided by AANDC is accurately reflected in the table, the breakdown between A-Base and targeted First Nations Water and Wastewater Action Plan could not be captured exactly as allocated due to financial coding used for projects funded using multiple sources. Total First Nations Water and Wastewater Action Plan allocations for 2013-2014 equal approximately $128<abbr title="million">M</abbr> whereas total A-Base funding towards water and wastewater infrastructure was about $158<abbr title="million">M</abbr> for this period.</td> </tr> </tfoot> </table> </div> <div class="row mrgn-tp-md"> <div class="col-md-12"> <figure> <figcaption>Graph 4.1: 5-Year Funding Trend (All Votes)&nbsp;&ndash; Water &amp; Wastewater ($<abbr title="million">M</abbr>)</figcaption> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR_Graph_4_1_1450367951630_eng.jpg" alt="Graph 4.1: 5-Year Funding Trend&nbsp;&ndash; Water &amp; Wastewater" class="img-responsive"> <details class="mrgn-tp-md mrgn-bttm-md"> <summary class="wb-toggle bg-warning" data-toggle='{"print": "on"}'>Description of figure 4.1&nbsp;&ndash; 5-Year Funding Trend (All Votes)&nbsp;&ndash; Water &amp; Wastewater ($<abbr title="million">M</abbr>)</summary> <p>This is a chart showing the five year funding trend of the Water &amp; Wastewater program area for the years 2009-2010 to 2013-2014. Each fiscal year is divided into A-Base funding, Targeted funding, and Salary &amp; Administration funding. The graph is a stacked bar chart.</p> <ul> <li>In 2009-2010, A-Base represents $166<abbr title="million">M</abbr>, Targeted $200<abbr title="million">M</abbr> and Salary &amp; Administration $13<abbr title="million">M</abbr> for a total of $379<abbr title="million">M</abbr>.</li> <li>In 2010-2011, A-Base represents $140<abbr title="million">M</abbr>, Targeted $236<abbr title="million">M</abbr> and Salary &amp; Administration $18<abbr title="million">M</abbr> for a total of $394<abbr title="million">M</abbr>.</li> <li>In 2011-2012, A-Base represents $149<abbr title="million">M</abbr>, Targeted $152<abbr title="million">M</abbr> and Salary &amp; Administration $10<abbr title="million">M</abbr> for a total of $311<abbr title="million">M</abbr>.</li> <li>In 2012-2013, A-Base represents $133<abbr title="million">M</abbr>, Targeted $158<abbr title="million">M</abbr> and Salary &amp; Administration $11<abbr title="million">M</abbr> for a total of $302<abbr title="million">M</abbr>.</li> <li>In 2013-2014, A-Base represents $139<abbr title="million">M</abbr>, Targeted $147<abbr title="million">M</abbr> and Salary &amp; Administration $9<abbr title="million">M</abbr> for a total of $295<abbr title="million">M</abbr>.</li> </ul> </details> </figure> </div> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 4.2: Regional Funding Level&nbsp;&ndash; A-Base &amp; Targeted (Vote&nbsp;10) </caption> <colgroup> <col class="col-md-8"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th id="T5-col-1">Region</th> <th id="T5-col-2" class="text-right">Funding</th> </tr> </thead> <tbody> <tr> <th id="T5-row-1" headers="T5-col-1">Atlantic</th> <td headers="T5-col-2 T5-row-1 T5-col-1" class="text-right">$10,228,299</td> </tr> <tr> <th id="T5-row-2" headers="T5-col-1">Quebec</th> <td headers="T5-col-2 T5-row-2 T5-col-1" class="text-right">$23,221,421</td> </tr> <tr> <th id="T5-row-3" headers="T5-col-1">Ontario</th> <td headers="T5-col-2 T5-row-3 T5-col-1" class="text-right">$52,784,862</td> </tr> <tr> <th id="T5-row-4" headers="T5-col-1">Manitoba</th> <td headers="T5-col-2 T5-row-4 T5-col-1" class="text-right">$61,579,434</td> </tr> <tr> <th id="T5-row-5" headers="T5-col-1">Saskatchewan</th> <td headers="T5-col-2 T5-row-5 T5-col-1" class="text-right">$39,495,764</td> </tr> <tr> <th id="T5-row-6" headers="T5-col-1">Alberta</th> <td headers="T5-col-2 T5-row-6 T5-col-1" class="text-right">$43,755,910</td> </tr> <tr> <th id="T5-row-7" headers="T5-col-1">British Columbia</th> <td headers="T5-col-2 T5-row-7 T5-col-1" class="text-right">$51,326,584</td> </tr> <tr> <th id="T5-row-8" headers="T5-col-1">Yukon</th> <td headers="T5-col-2 T5-row-8 T5-col-1" class="text-right">$2,898,005</td> </tr> <tr> <th id="T5-row-9" headers="T5-col-1"><abbr title="Headquarters">HQ</abbr></th> <td headers="T5-col-2 T5-row-9 T5-col-1" class="text-right">$498,160</td> </tr> </tbody> <tfoot> <tr> <th class="text-left" id="T5-row-10" headers="T5-col-1"><b>Total</b></th> <td headers="T5-col-2 T5-row-10 T5-col-1" class="text-right"><b>$285,788,439</b></td> </tr> </tfoot> </table> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 4.3: Number of Funded Proposal-Based Water &amp; Wastewater Projects </caption> <colgroup> <col class="col-md-4"> <col class="col-md-4"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th id="T6-col-1"><b>Region</b></th> <th class="text-right" id="T6-col-2"><b>Number In Progress </b></th> <th class="text-right" id="T6-col-3"><b>Number Completed </b></th> </tr> </thead> <tbody> <tr class="text-right"> <th id="T6-row-1" headers="T6-col-1">Atlantic</th> <td headers="T6-col-2 T6-row-1 T6-col-1">8</td> <td headers="T6-col-3 T6-row-1 T6-col-1">25</td> </tr> <tr class="text-right"> <th id="T6-row-2" headers="T6-col-1">Quebec</th> <td headers="T6-col-2 T6-row-2 T6-col-1">17</td> <td headers="T6-col-3 T6-row-2 T6-col-1">22</td> </tr> <tr class="text-right"> <th id="T6-row-3" headers="T6-col-1">Ontario</th> <td headers="T6-col-2 T6-row-3 T6-col-1">15</td> <td headers="T6-col-3 T6-row-3 T6-col-1">53</td> </tr> <tr class="text-right"> <th id="T6-row-4" headers="T6-col-1">Manitoba</th> <td headers="T6-col-2 T6-row-4 T6-col-1">14</td> <td headers="T6-col-3 T6-row-4 T6-col-1">19</td> </tr> <tr class="text-right"> <th id="T6-row-5" headers="T6-col-1">Saskatchewan</th> <td headers="T6-col-2 T6-row-5 T6-col-1">26</td> <td headers="T6-col-3 T6-row-5 T6-col-1">17</td> </tr> <tr class="text-right"> <th id="T6-row-6" headers="T6-col-1">Alberta</th> <td headers="T6-col-2 T6-row-6 T6-col-1">10</td> <td headers="T6-col-3 T6-row-6 T6-col-1">51</td> </tr> <tr class="text-right"> <th id="T6-row-7" headers="T6-col-1">British Columbia</th> <td headers="T6-col-2 T6-row-7 T6-col-1">58</td> <td headers="T6-col-3 T6-row-7 T6-col-1">32</td> </tr> <tr class="text-right"> <th id="T6-row-8" headers="T6-col-1">Yukon</th> <td headers="T6-col-2 T6-row-8 T6-col-1">3</td> <td headers="T6-col-3 T6-row-8 T6-col-1">2</td> </tr> </tbody> <tfoot> <tr class="text-right"> <th id="T6-row-9" headers="T6-col-1"> Total </th> <td headers="T6-col-2 T6-row-9 T6-col-1"><b>151</b></td> <td headers="T6-col-3 T6-row-9 T6-col-1"><b>221</b></td> </tr> </tfoot> </table> </div> <p>For a detailed list of all funded Water &amp; Wastewater proposal projects for 2013-2014 please refer to <a href="#a38">Annex&nbsp;A</a> of this report.</p> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 4.4: Key Performance Indicators </caption> <colgroup> <col class="col-md-3"> <col class="col-md-4"> <col class="col-md-3"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">Expected Results</th> <th scope="col">Performance Indicators</th> <th scope="col">Targets</th> <th scope="col">Actual Results</th> </tr> </thead> <tbody> <tr> <td rowspan="4">First Nations communities have a base of safe water and wastewater that meets established standards</td> <td>Percentage of First Nations drinking water systems that have LOW risk ratings</td> <td><ul> <li>42% by March 31, 2014</li> <li> 50% by March 31, 2015</li> </ul></td> <td>44%</td> </tr> <tr> <td>Percentage of First Nations wastewater systems that have LOW risk ratings</td> <td><ul> <li>60% by March 31, 2014</li> <li> 70% by March 31, 2015</li> </ul></td> <td>52%</td> </tr> <tr> <td>Percentage of First Nations drinking water systems with treated water that meets prescribed standards in the <cite>Guidelines for Canadian Drinking Water Quality</cite></td> <td><ul> <li>70% by March 31, 2014</li> <li> 85% by March 31, 2015</li> </ul></td> <td>74%</td> </tr> <tr> <td>Percentage of First Nations wastewater systems producing treated water that meet the requirements specified in the <cite>Wastewater Systems Effluent Regulations</cite></td> <td><ul> <li>80% of systems meet current standards by March 31, 2014</li> <li> 100% of systems meet current standards by March 31, 2016</li> </ul></td> <td>63%</td> </tr> </tbody> </table> </div> </section> <section> <div class="clearfix">&nbsp;</div> <h3 id="a18">Investment Highlights</h3> <p>Water and wastewater projects funded by <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> include the construction of new treatment facilities, the construction of water and wastewater storage facilities, the expansion of existing systems, renovations or upgrades of systems, the servicing of lots for new home constructions, installation of remote monitoring systems, supply lines, intakes, pumping stations, distribution system piping, house service connections, fire hydrants, tank trucks, storage reservoirs, lift stations, lagoons, force mains, sewage collection piping, manholes, outfall sewers, storage tanks, collection vehicles, and storm, sewers.</p> <p>From April&nbsp;2006 to March&nbsp;2014, the Government of Canada has invested approximately $3&nbsp;billion to support First Nations in managing their water and wastewater infrastructure, including Health Canada funding. Between fiscal years 2008-2009 and 2013-2014, the average annual departmental spending to support First Nations water and wastewater services has been approximately $332&nbsp;million.</p> <p>In 2013-2014, 543&nbsp;First Nations and 74&nbsp;Tribal Councils received funding to support 733&nbsp;on-reserve drinking water systems and 49&nbsp;service agreements with municipalities to provide drinking water services. First Nations received approximately $146&nbsp;million in capital investments ($57&nbsp;million in A-Base Capital and $88&nbsp;million in First Nations Water and Wastewater Action Plan Capital) from <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> for water and wastewater projects. Projects funded included the construction of new treatment facilities, the construction of water and wastewater storage facilities, the expansion of existing systems and the servicing of lots for new home construction.</p> <p>In addition to capital investments, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> also provided First Nations with $140&nbsp;million in Operations and Maintenance investments ($81&nbsp;million in A-Base Operations and Maintenance and $58&nbsp;million in First Nations Water and Wastewater Action Plan Operations and Maintenance) for water and wastewater systems built with departmental funds.</p> <section> <h4>Safe Drinking Water for First Nations Act</h4> <p>While all provinces and territories have laws governing the treatment and distribution or disposal of drinking water and wastewater, there is no comprehensive regulatory regime governing the same on First Nation lands. To address the regulatory gap, Parliament passed the&nbsp;<a href="/eng/1330528512623/1533729830801"><cite>Safe Drinking Water for First Nations Act</cite></a> in June&nbsp;2013, which came into force on November&nbsp;1,&nbsp;2013. The Act allows the Government to develop, in partnership with First Nations, enforceable federal regulations to ensure access to safe, clean, and reliable drinking water; the effective treatment of wastewater; and the protection of sources of drinking water on First Nation lands.</p> <p>Regulations will be developed with input from First Nations, provincial/territorial governments, and other stakeholders, region-by-region. It is expected that one set of federal regulations will be developed for each region, harmonizing as much as possible with the relevant provincial/territorial regulations. Once regulations are developed and approved, implementation will be phased-in over a number of years. This will provide the Federal Government and First Nations the opportunity to bring infrastructure and capacity to the levels required to meet regulations.</p> </section> <section> <h4>Toquaht First Nation, <abbr title="British Columbia">BC</abbr>&nbsp;&ndash; Water System Treatment and Upgrades</h4> <div class="pull-right mrgn-lft-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img1_1450706796954_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <p>The Toquaht First Nation has an on-reserve population of 350 and is located on Vancouver Island, south of Tofino. The water system treatment and upgrade project included the construction of a water treatment plant, upgrades to the reservoir and water intake structures and repairs to the water distribution system. The project also included an electrical grid system expansion to the new treatment plant and upgrades on the access road to the reservoir.</p> <p>Toquaht's water system was considered high risk and the community was on a long term Boil Water Advisory. Summer flows from the former intake source were inadequate to provide sufficient water for the community.</p> <p>The $2.2&nbsp;million project provided slow sand filtration and chlorine disinfection for the surface water source supplying water to this small First Nation. The treatment plant is designed to allow for expansion, allowing for growth within the community and its proposed developments. This project was completed in&nbsp;2013.</p> </section> <section> <h4>Okanagan Band, <abbr title="British Columbia">BC</abbr>&nbsp;&ndash; Bradley Creek Water Improvements</h4> <p>The Okanagan Indian Band has an on-reserve population of 4,865 and is located at the head of Lake Okanagan in Vernon <abbr title="British Columbia">BC</abbr>, 427&nbsp;<abbr title="kilometer">km</abbr> northeast of Vancouver. The Okanagan Indian Band&nbsp;&ndash; Bradley Creek Water Improvement Project expanded the Six Mile Water System to deliver safe and potable drinking water to the Six Mile and Bradley Creek communities. The Bradley Creek community had been on a Boil Water Order since June&nbsp;2004 when <cite>Escherichia coli</cite> bacteria were discovered in the Bradley Creek Water Distribution System. The water supply to the Six Mile and Bradley Creek communities was not previously disinfected.</p> <p>The expansion included well upgrades and replacements to meet capacity demands, construction of a new water treatment facility to provide manganese filtration and chlorine disinfection, upgrades to the Six Mile Reservoir to improve water quality and safety, and the installation of dedicated water mains for raw and treated water. There also were updates to security and controls, Supervisory Control and Data Acquisition monitoring, and alarms for the combined Six Mile and Bradley Creek Water Systems. The total project cost is estimated at $4.7&nbsp;million and will be completed in the fall of&nbsp;2014.</p> </section> <section> <h4>Moosomin First Nation, Saskatchewan&nbsp;&ndash; Water Treatment Plant Upgrade</h4> <div class="pull-left mrgn-rght-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img2_1450707172947_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <p>The Moosomin First Nation has an on-reserve population of 1,115 and is located near North Battleford, Saskatchewan. The water treatment plant upgrade addresses a high risk system in the national assessment and is funded with First Nations Water and Wastewater Action Plan funds. The scope of work includes an existing well upgrade, new stand-alone water treatment plant including biological filtration and membrane treatment, reservoir, back-up systems and de-commissioning of the existing plant. Construction started in 2013-2014 and is estimated to cost $5.1&nbsp;million.</p> </section> <section> <h4>Little Black River First Nation, Manitoba&nbsp;&ndash; Water Treatment Plant Upgrade</h4> <p>Little Black River First Nation has an on-reserve population of 884 and is located approximately 150&nbsp;<abbr title="kilometer">km</abbr> northeast of Winnipeg, Manitoba. The water treatment plant upgrade consists of upgrading and expanding the existing water treatment plant building and the below ground reservoir and water treatment system, as well as installing a new raw water intake and decommissioning the existing raw water intake. A new distribution pumping system and chlorination are included in the treatment system.</p> <p>The project cost is estimated at $7.4&nbsp;million and will be completed in the fall of 2014; the upgraded water treatment system will meet the projected 20&nbsp;year potable water requirements for the community.</p> </section> <section> <h4>Six Nations of the Grand River, Ontario&nbsp;&ndash; New Water Supply and Treatment System</h4> <div class="pull-right mrgn-lft-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img3_1450707198203_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <p>The Six Nations of the Grand River have a combined on-reserve population of 12,244 and are located in southern Ontario, near Hamilton. The existing treatment plant for the Six Nations is operating beyond capacity and disruptions in production of water put the communities at risk.</p> <p>Investment in a new water treatment system was approved in 2011 and construction is currently underway. The new water supply and treatment system is comprised of a raw water intake, a raw water storage/sedimentation/clarification system, a low lift station, a raw water force main, and an 1800&nbsp;<abbr title="square meter">m<sup>2</sup></abbr> water treatment plant. The new system will connect to the existing water distribution system.</p> <p>The total cost of this project is $41&nbsp;million. <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> committed a maximum contribution of $26&nbsp;million, with the community agreeing to contribute $15&nbsp;million. The project is expected to be completed in 2014-2015.</p> </section> <section> <h4>Kitigan Zibi Anishinabeg First Nation, Quebec&nbsp;&ndash; Water and Sewer Infrastructure</h4> <div class="pull-left mrgn-rght-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img4_1450707219837_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <p>Kitigan Zibi Anishinabeg First Nation has a registered on-reserve population of 1,572 and is located near Maniwaki, Quebec, approximately 130&nbsp;<abbr title="kilometer">km</abbr> north of Ottawa-Gatineau. The water and wastewater infrastructure project was needed to meet the housing requirements stemming from the significant population growth that Kitigan Zibi has been experiencing over the past few years. The project consisted of new water and sanitary wastewater systems in the existing community that will also service a new subdivision of 17&nbsp;lots currently under development. Phase&nbsp;1 of the $2.8&nbsp;million dollar project was completed in September&nbsp;2013. The&nbsp;remaining phases are being implemented on a yearly basis with the final phase to be completed in the fall of fiscal year&nbsp;2015-2016.</p> </section> <section> <h4>Bouctouche First Nation, New Brunswick&nbsp;&ndash; Community Water Supply Upgrades</h4> <div class="pull-right mrgn-lft-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img5_1450707235143_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <p>Bouctouche First Nation has an on-reserve population of 74 and is located approximately 60&nbsp;<abbr title="kilometer">km</abbr> north of Moncton, New Brunswick. Their current water system was constructed 20&nbsp;years ago and consists of a pump house containing pressure tanks, chlorine pump and feed, and distribution main. The water source is a single well located adjacent to the pump house. A back up well was developed in 2005, but had not been connected to the existing pump house. In 2008, the community water distribution tested positive for <cite>E-coli</cite> which prompted a Boil Water Advisory.</p> <p>The Community Water Supply Upgrades Project was undertaken to bring the community's water system up to national standards for design and treatment. <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> invested $2.3&nbsp;million towards the upgrades to the water system, which consisted of a new pump house, an above ground water storage reservoir, a connection between the existing back up well and the system, and the completion of a well field protection plan.</p> <p>The project was completed in March&nbsp;2014, and the Boil Water Advisory was removed.</p> </section> <section> <h4>Kingsclear First Nation, New Brunswick&nbsp;&ndash; Water Disinfection System Upgrade Project</h4> <p>Kingsclear has an on-reserve registered population of 685&nbsp;people and is located near Fredericton, New Brunswick. Their current water system was constructed in 1987 and consists of two production wells located near the shoreline of the St&nbsp;John River. Water from the wells is distributed through a piped distribution network that consists of a transmission main connecting the wells to a grade level storage reservoir (constructed in 1998), and a series of local distribution piping delivering water to consumers.</p> <p>The Water Disinfection System Upgrade Project was required to address deficiencies found in the Pre-Design Report completed in&nbsp;2011. The water source is potentially vulnerable to contamination by pathogens and to flooding, and the control system was in poor condition. The scope of work for the project included the construction of a new disinfection facility, the installation of a Supervisory Control and Data Acquisition system, the decommissioning and demolition of the existing well house, a video inspection of the well casings, a groundwater under the direct influence of surface water assessment, the implementation of stand-by power supply, well site access road upgrade, twinning the transmission main to reservoir, a water system security assessment, a source water protection study, a maintenance management plan, and a sampling and monitoring program. Departmental investments towards this project were made from the First Nations Water and Wastewater Action Plan in the amount of $1.56&nbsp;million and construction was completed in the fall of&nbsp;2013.</p> </section> </section> <section> <h3 id="a19">Looking Forward</h3> <p>The Federal Government will continue to work with First Nations, provinces, territories, and other stakeholders to build on progress already achieved. The Government of Canada plans to allocate $612&nbsp;million to <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> between April&nbsp;1,&nbsp;2014 and March&nbsp;31,&nbsp;2016, to fund on-reserve water and wastewater infrastructure and complementary activities. The funding includes grants and contributions as well as departmental operational budgets.</p> <p>The goal of the Water and Wastewater sub-category is that First Nation communities have a base of safe water and wastewater that meets established standards; Departmental activities in 2014-2015 will align with this objective and be rooted in the Government of Canada's long-term strategic four pillars approach as follows:</p> <ul> <li>Work with First Nations, provincial and territorial governments and other stakeholders to develop federal regulations to ensure access to safe, clean and reliable drinking water, the effective treatment of wastewater, and the protection of sources of water on First Nation Lands.</li> <li>Continue to provide a strategic response to the National Assessment findings in order to improve and strengthen results for water and wastewater in First Nation communities such as: <ul> <li>Clarifying applicable standards and protocols to bolster water and wastewater protection on reserve until regulations are in place;</li> <li>Increasing First Nation capacity to operate and maintain drinking water and wastewater systems by augmenting the number of certified operators, increasing funding for operator training and operations and maintenance, and implementing the new Circuit Rider Training Guidelines; and</li> <li>Prioritizing capital investments to target highest risk systems.</li> </ul> </li> <li>Support First Nations in developing regional hubs of expertise and in supporting monitoring and, where feasible, operating systems remotely as already implemented in Alberta.</li> <li>Continuing to support First Nations to comply with the requirements of <cite>Environment Canada's Wastewater Systems Effluent Regulations</cite></li> </ul> </section> </section> <section> <h2 id="a20">5. Education Facilities</h2> <section> <h3 id="a21">Sub-Category Description</h3> <p>This sub-category supports the provision of funding for the planning, design, construction/acquisition, renovation, repair, replacement, and operation and maintenance of elementary and secondary education facilities (including school buildings, teacherages and student residences) and any related facility services for the benefit of First Nations students.</p> <p><abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> invests annually to support First Nations across the country with their education facilities. The Government of Canada has provided additional investments in school infrastructure through targeted initiatives so that education facilities meet established standards.</p> </section> <section> <h3 id="a22">Oversight</h3> <p>School infrastructure assets are assessed on a three year cycle under the Asset Condition Reporting System. A General Condition Rating is provided for schools assets based on an overall assessment for all components of the asset. <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> has a target of 70% for education facilities to have a General Condition Rating score greater than &quot;fair condition.&quot; As of April&nbsp;1,&nbsp;2014, 63% of schools met this target.</p> </section> <section> <h3 id="a23">Education at a Glance 2013-2014</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 5.1: 2013-2014 Actual Expenditures&nbsp;&ndash; Education Facilities </caption> <colgroup> <col class="col-md-8"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th colspan="2" id="T7-row-1">A-Base Allocations to Eligible Recipients (Vote&nbsp;10)</th> </tr> </thead> <tbody> <tr> <th id="T7-row-2" headers="T7-row-1">Capital</th> <td headers="T7-row-2 T7-row-1" class="text-right">$50,221,391</td> </tr> <tr> <th id="T7-row-3" headers="T7-row-1">Operations and Maintenance</th> <td headers="T7-row-3 T7-row-1" class="text-right">$112,292,012</td> </tr> <tr> <th id="T7-row-4" headers="T7-row-1">Total A-Base</th> <td headers="T7-row-4 T7-row-1" class="text-right"><b>$162,513,403</b></td> </tr> <tr class="active"> <th colspan="2" id="T7-row-5">Targeted Allocations to Eligible Recipients (Vote 10)</th> </tr> <tr> <th id="T7-row-6" headers="T7-row-5">Gas Tax Fund*</th> <td headers="T7-row-6 T7-row-5" class="text-right">$3,000,000</td> </tr> <tr> <th id="T7-row-7" headers="T7-row-5">Budget 2012 Schools</th> <td headers="T7-row-7 T7-row-5" class="text-right">$41,984,817</td> </tr> <tr> <th id="T7-row-11" headers="T7-row-5">James Bay Cree</th> <td headers="T7-row-11 T7-row-5" class="text-right">$5,527,047</td> </tr> <tr> <th id="T7-row-12" headers="T7-row-5">Total Targeted</th> <td headers="T7-row-12 T7-row-5" class="text-right">$50,511,864</td> </tr> <tr> <th id="T7-row-13" headers="T7-row-5">Total A-Base and Targeted (Vote&nbsp;10)</th> <td headers="T7-row-13 T7-row-5" class="text-right"><b>$213,025,267</b></td> </tr> <tr class="active"> <th colspan="2" id="T7-row-14">2013-2014 Salary &amp; Administration (Votes 1&amp;5)</th> </tr> <tr> <th id="T7-row-15" headers="T7-row-14">Total Salary &amp; Administration</th> <td headers="T7-row-15 T7-row-14" class="text-right"><b>$1,217,122</b></td> </tr> </tbody> <tfoot> <tr> <th id="T7-row-16" headers="T7-row-14">Total Investments </th> <td headers="T7-row-16 T7-row-14" class="text-right"><b>$214,242,389</b></td> </tr> <tr> <td colspan="2">*This is departmental A-Base that was used to finish the construction of Red Earth School, which was initially funded through Gas Tax Fund.</td> </tr> </tfoot> </table> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 5.2: Regional Funding Level – A-Base & Targeted (Vote 10) </caption> <colgroup> <col class="col-md-8"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th id="T7a-col-1">Region</th> <th id="T7a-col-2" class="text-right">Funding</th> </tr> </thead> <tbody> <tr> <th id="T7a-row-1" headers="T7a-col-1">Atlantic</th> <td headers="T7a-col-2 T7a-row-1 T7a-col-1" class="text-right">$5,684,250</td> </tr> <tr> <th id="T7a-row-2" headers="T7a-col-1">Quebec</th> <td headers="T7a-col-2 T7a-row-2 T7a-col-1" class="text-right">$13,950,497</td> </tr> <tr> <th id="T7a-row-3" headers="T7a-col-1">Ontario</th> <td headers="T7a-col-2 T7a-row-3 T7a-col-1" class="text-right">$58,480,038</td> </tr> <tr> <th id="T7a-row-4" headers="T7a-col-1">Manitoba</th> <td headers="T7a-col-2 T7a-row-4 T7a-col-1" class="text-right">$34,445,158</td> </tr> <tr> <th id="T7a-row-5" headers="T7a-col-1">Saskatchewan</th> <td headers="T7a-col-2 T7a-row-5 T7a-col-1" class="text-right">$51,817,527</td> </tr> <tr> <th id="T7a-row-6" headers="T7a-col-1">Alberta</th> <td headers="T7a-col-2 T7a-row-6 T7a-col-1" class="text-right">$27,949,160</td> </tr> <tr> <th id="T7a-row-7" headers="T7a-col-1">British Columbia</th> <td headers="T7a-col-2 T7a-row-7 T7a-col-1" class="text-right">$15,171,590</td> </tr> <tr> <th id="T7a-row-9" headers="T7a-col-1"><abbr title="Headquarters">HQ</abbr></th> <td headers="T7a-col-2 T7a-row-9 T7a-col-1" class="text-right">$5,527,047</td> </tr> </tbody> <tfoot> <tr> <th class="text-left" id="T7a-row-10" headers="T7a-col-1"><b>Total</b></th> <td headers="T7a-col-2 T7a-row-10 T7a-col-1" class="text-right"><b>$213,025,267</b></td> </tr> </tfoot> </table> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 5.3: Number of Funded Proposal-Based Education Projects 2013-2014 </caption> <colgroup> <col class="col-md-4"> <col class="col-md-4"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th id="T7b-col-1"><b>Region</b></th> <th class="text-right" id="T7b-col-2"><b>Number In Progress </b></th> <th class="text-right" id="T7b-col-3"><b>Number Completed </b></th> </tr> </thead> <tbody> <tr class="text-right"> <th id="T7b-row-1" headers="T7b-col-1">Atlantic</th> <td headers="T7b-col-2 T7b-row-1 T7b-col-1">2</td> <td headers="T7b-col-3 T7b-row-1 T7b-col-1">2</td> </tr> <tr class="text-right"> <th id="T7b-row-2" headers="T7b-col-1">Quebec</th> <td headers="T7b-col-2 T7b-row-2 T7b-col-1">1</td> <td headers="T7b-col-3 T7b-row-2 T7b-col-1">4</td> </tr> <tr class="text-right"> <th id="T7b-row-3" headers="T7b-col-1">Ontario</th> <td headers="T7b-col-2 T7b-row-3 T7b-col-1">9</td> <td headers="T7b-col-3 T7b-row-3 T7b-col-1">11</td> </tr> <tr class="text-right"> <th id="T7b-row-4" headers="T7b-col-1">Manitoba</th> <td headers="T7b-col-2 T7b-row-4 T7b-col-1">3</td> <td headers="T7b-col-3 T7b-row-4 T7b-col-1">2</td> </tr> <tr class="text-right"> <th id="T7b-row-5" headers="T7b-col-1">Saskatchewan</th> <td headers="T7b-col-2 T7b-row-5 T7b-col-1">13</td> <td headers="T7b-col-3 T7b-row-5 T7b-col-1">7</td> </tr> <tr class="text-right"> <th id="T7b-row-6" headers="T7b-col-1">Alberta</th> <td headers="T7b-col-2 T7b-row-6 T7b-col-1">2</td> <td headers="T7b-col-3 T7b-row-6 T7b-col-1">26</td> </tr> <tr class="text-right"> <th id="T7b-row-7" headers="T7b-col-1">British Columbia</th> <td headers="T7b-col-2 T7b-row-7 T7b-col-1">10</td> <td headers="T7b-col-3 T7b-row-7 T7b-col-1">7</td> </tr> <tr class="text-right"> <th id="T7b-row-8" headers="T7b-col-1">Yukon</th> <td headers="T7b-col-2 T7b-row-8 T7b-col-1">0</td> <td headers="T7b-col-3 T7b-row-8 T7b-col-1">0</td> </tr> </tbody> <tfoot> <tr class="text-right"> <th id="T7b-row-9" headers="T7b-col-1"> Total </th> <td headers="T7b-col-2 T7b-row-9 T7b-col-1"><b>40</b></td> <td headers="T7b-col-3 T7b-row-9 T7b-col-1"><b>59</b></td> </tr> </tfoot> </table> </div> <p>For a detailed list of all funded Education Facilities proposal projects for 2013-2014 please refer to <a href="#a39">Annex&nbsp;B</a> of this report.</p> <div class="row mrgn-tp-md"> <div class="col-md-12"> <figure> <figcaption>Graph 5.1: 5-Year Funding Trend (All Votes)&nbsp;&ndash; Educational Facilities ($<abbr title="million">M</abbr>)</figcaption> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR_Graph_5_1_1450367967019_eng.jpg" alt="Graph 5.1: 5-Year Funding Trend&nbsp;&ndash; Educational Facilities" class="img-responsive"> <details class="mrgn-tp-md mrgn-bttm-md"> <summary class="wb-toggle bg-warning" data-toggle='{"print": "on"}'>Description of figure 5.1&nbsp;&ndash; 5-Year Funding Trend (All Votes)&nbsp;&ndash; Educational Facilities ($<abbr title="million">M</abbr>)</summary> <p>This is a chart showing the five year funding trend of the Education program area for the years 2009-2010 to 2013-2014. Each fiscal year is divided into A-Base funding, Targeted funding, and Salary &amp; Administration funding. The graph is a stacked bar chart.</p> <ul> <li>In 2009-2010, A-Base represents $155<abbr title="million">M</abbr>, Targeted $123<abbr title="million">M</abbr> and Salary &amp; Administration $4<abbr title="million">M</abbr> for a total of $282<abbr title="million">M</abbr>.</li> <li>In 2010-2011, A-Base represents $149<abbr title="million">M</abbr>, Targeted $155<abbr title="million">M</abbr> and Salary &amp; Administration $3<abbr title="million">M</abbr> for a total of $307<abbr title="million">M</abbr>.</li> <li>In 2011-2012, A-Base represents $163<abbr title="million">M</abbr>, Targeted $38<abbr title="million">M</abbr> and Salary &amp; Administration $3<abbr title="million">M</abbr> for a total of $204<abbr title="million">M</abbr>.</li> <li>In 2012-2013, A-Base represents $171<abbr title="million">M</abbr>, Targeted $54<abbr title="million">M</abbr> and Salary &amp; Administration $3<abbr title="million">M</abbr> for a total of $228<abbr title="million">M</abbr>.</li> <li>In 2013-2014, A-Base represents $163<abbr title="million">M</abbr>, Targeted $51<abbr title="million">M</abbr> and Salary &amp; Administration $1<abbr title="million">M</abbr> for a total of $215<abbr title="million">M</abbr>.</li> </ul> </details> </figure> </div> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 5.4: Key Performance Indicators </caption> <colgroup> <col class="col-md-4"> <col class="col-md-4"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th scope="col">Expected Results</th> <th scope="col">Performance Indicators</th> <th scope="col">Targets</th> </tr> </thead> <tbody> <tr> <td>First Nations communities have a base of education facilities that meet established standards</td> <td>Percentage of First Nations schools with a greater than &quot;fair&quot; condition rating (based on physical/structural conditions) as assessed through the Asset Condition Reporting System inspections</td> <td><ul> <li>Maintain 70% by March 31, 2014</li> <li> Maintain 70% by March 31, 2015</li> </ul></td> </tr> </tbody> </table> </div> </section> <section> <div class="clearfix">&nbsp;</div> <h3 id="a24">Investment Highlights</h3> <section> <h4>Nak'azdli Band, <abbr title="British Columbia">BC</abbr>&nbsp;&ndash; Nakal Bun School</h4> <div class="pull-left mrgn-rght-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img6_1450707260184_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <p>Nak'azdli Band is located 160&nbsp;<abbr title="kilometer">km</abbr> northwest of Prince George, British Columbia, near Fort St.&nbsp;James. The new Nakal Bun Elementary School project is currently under construction with students planning to move in during September&nbsp;2013. The new facility has an area of 1,890<abbr title="square meter">m<sup>2</sup></abbr> and will accommodate students from Kindergarten to Grade&nbsp;9. The cost of the project is $14.2&nbsp;million with the Band contributing $3.5&nbsp;million to provide additional educational space.</p> <p>The new facility includes 6&nbsp;classrooms, a school gymnasium, a language and culture room for elders, a library resource room, a First Aid room, a staff and kitchen room, a utilities room, offices and a reception area. All rooms will be heated by a geothermal heating system.</p> <p>The new facility will provide a positive impact on both the Nak'azdli community and surrounding communities by providing a safe and healthy environment for promoting education. In addition to educational programming, the new school will be used for cultural programs with elders, adult education programs, community meetings and celebrations, and evening recreation/sports.</p> </section> <section> <h4>Eel Ground First Nation, New Brunswick&nbsp;&ndash; New School</h4> <p>Eel Ground First Nation has an on-reserve registered population of 545 and is located approximately 160&nbsp;<abbr title="kilometer">km</abbr> northwest of Moncton, New Brunswick. The community's current school was constructed in 1977 and no longer meets the community's needs. This new facility will cost $9.02&nbsp;million and will be designed with the latest construction and energy efficiency technology, which will significantly reduced operating costs.</p> <p>Through the Schools Budget&nbsp;2012, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> was able to secure investment in the order of $8.02&nbsp;million for the community to proceed with the construction of the new education facility, $7.52&nbsp;million from Budget&nbsp;2012 and $500,000 from the Atlantic Region. Eel Ground First Nation is contributing $900,000 to the cost of the new school and the eco-Energy Program contributed $100,000.</p> <p>This new school is anticipated to be completed in March&nbsp;2015 and will provide a safe and quality learning environment for the children of&nbsp;Eel Ground First Nation. It will limit the need for children to attend school off reserve and ultimately enhance the communities' educational outcomes.</p> </section> </section> <section> <h3 id="a25">Looking Forward</h3> <p>The Government of Canada&nbsp;is committed to&nbsp;improving the quality of education in First Nation schools, thereby ensuring better educational outcomes for First Nation students living on reserve.</p> <p>Moving forward, the Department will be focusing on completing commitments under Economic Action Plan&nbsp;2012, and developing a strategy for the successful implementation of Economic Action Plan&nbsp;2014's investments.</p> <p>In implementing these new investments, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> will be building on lessons learned from the investments made under Budget&nbsp;2012. To that end, the Department is currently working on measures to improve the school infrastructure program. These changes are to ensure that future funding is associated with modern industry standards and practices for procurement, construction and operation and maintenance, and that schools remain in working condition for their full life cycle. The Department has consulted with private industry and First Nation technical organizations on the development of this new approach which is scheduled to be implemented during the 2014-2015 fiscal year.</p> <p>In allocating funding for education facilities <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> will continue to use the First Nation Infrastructure Investment Plan and the School Priority Ranking Framework tools. The First Nation Infrastructure Investment Plan is used to identify school infrastructure needs. The School Priority Ranking Framework applies a point ranking system based on nationally established criteria to rank schools eligible for funding. The first priority remains addressing health and safety concerns.</p> </section> </section> <section> <h2 id="a26">6. Housing</h2> <section> <h3 id="a27">Sub-Category Description</h3> <p>The Government of Canada invests an average of $300&nbsp;million in on-reserve housing each year through Canada Mortgage and Housing Corporation and <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr>. <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> offers annual funding that First Nations can use to meet a range of housing needs, including: maintenance, insurance, debt financing, rehabilitation of existing houses, and the planning and management of housing activities. In 2013–2014, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> alone invested approximately $143&nbsp;million in on-reserve housing, which has supported an increase in the number of adequate houses on reserve.</p> <p>To improve collaborative work and information sharing with the goal of improving housing outcomes on reserve, Canada Mortgage and Housing Corporation and <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> signed a Memorandum of Understanding in April&nbsp;2013. The Memorandum provides <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> with access to information concerning housing units under a Departmental Ministerial Loan Guarantee, and will enable <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> to manage the Ministerial Loan Guarantee program more effectively. It will also enable the organizations to increase the sharing of information related to capacity-development initiatives and promote project collaboration where possible.</p> </section> <section> <h3 id="a28">Oversight</h3> <p>In 2013-2014, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> provided over $143&nbsp;million in on-reserve housing support to First Nations, which supported the completion of 203 projects, and allowed the commencement of 29&nbsp;proposal projects which are still in progress. As a result, 75% of First Nations housing was deemed &quot;adequate&quot; as assessed and reported annually by First Nations, exceeding the 2013-2014 target of 72%.</p> </section> <section> <h3 id="a29">Housing at a Glance 2013-2014</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 6.1: 2013-2014 Actual Expenditures&nbsp;&ndash; Housing </caption> <colgroup> <col class="col-md-8"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th colspan="2" id="T8-row-1">A-Base Allocations to Eligible Recipients (Vote&nbsp;10)</th> </tr> </thead> <tbody> <tr> <th id="T8-row-2" headers="T8-row-1">Capital</th> <td headers="T8-row-2 T8-row-1" class="text-right">$138,280,479</td> </tr> <tr> <th id="T8-row-3" headers="T8-row-1">Operations and Maintenance</th> <td headers="T8-row-3 T8-row-1" class="text-right">$3,089,413</td> </tr> <tr> <th id="T8-row-4" headers="T8-row-1">Total A-Base</th> <td headers="T8-row-4 T8-row-1" class="text-right"><b>$141,369,892</b></td> </tr> <tr class="active"> <th colspan="2" id="T8-row-5">Targeted Allocations to Eligible Recipients (Vote 10)</th> </tr> <tr> <th id="T8-row-12" headers="T8-row-5">Total Targeted</th> <td headers="T8-row-12 T8-row-5" class="text-right"><b>$0</b></td> </tr> <tr> <th id="T8-row-13" headers="T8-row-5">Total A-Base and Targeted (Vote&nbsp;10)</th> <td headers="T8-row-13 T8-row-5" class="text-right"><b>$141,369,892</b></td> </tr> <tr class="active"> <th colspan="2" id="T8-row-14">2013-2014 Salary &amp; Administration (Votes 1&amp;5)</th> </tr> <tr> <th id="T8-row-15" headers="T8-row-14">Total Salary &amp; Administration</th> <td headers="T8-row-15 T8-row-14" class="text-right"><b>$1,680,262</b></td> </tr> </tbody> <tfoot> <tr> <th id="T8-row-16" headers="T8-row-14">Total Investments </th> <td headers="T8-row-16 T8-row-14" class="text-right"><b>$143,050,154</b></td> </tr> </tfoot> </table> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 6.2: Regional Funding Level&nbsp;&ndash; A-Base &amp; Targeted (Vote&nbsp;10) </caption> <colgroup> <col class="col-md-8"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th id="T9-col-1">Region</th> <th id="T9-col-2" class="text-right">Funding</th> </tr> </thead> <tbody> <tr> <th id="T9-row-1" headers="T9-col-1">Atlantic</th> <td headers="T9-col-2 T9-row-1 T9-col-1" class="text-right">$1,351,196</td> </tr> <tr> <th id="T9-row-2" headers="T9-col-1">Quebec</th> <td headers="T9-col-2 T9-row-2 T9-col-1" class="text-right">$8,630,232</td> </tr> <tr> <th id="T9-row-3" headers="T9-col-1">Ontario</th> <td headers="T9-col-2 T9-row-3 T9-col-1" class="text-right">$27,601,155</td> </tr> <tr> <th id="T9-row-4" headers="T9-col-1">Manitoba</th> <td headers="T9-col-2 T9-row-4 T9-col-1" class="text-right">$38,527,999</td> </tr> <tr> <th id="T9-row-5" headers="T9-col-1">Saskatchewan</th> <td headers="T9-col-2 T9-row-5 T9-col-1" class="text-right">$20,427,022</td> </tr> <tr> <th id="T9-row-6" headers="T9-col-1">Alberta</th> <td headers="T9-col-2 T9-row-6 T9-col-1" class="text-right">$27,824,768</td> </tr> <tr> <th id="T9-row-7" headers="T9-col-1">British Columbia</th> <td headers="T9-col-2 T9-row-7 T9-col-1" class="text-right">$14,245,890</td> </tr> <tr> <th id="T9-row-8" headers="T9-col-1">Yukon</th> <td headers="T9-col-2 T9-row-8 T9-col-1" class="text-right">$1,623,956</td> </tr> <tr> <th id="T9-row-9" headers="T9-col-1"><abbr title="Headquarters">HQ</abbr></th> <td headers="T9-col-2 T9-row-9 T9-col-1" class="text-right">$1,137,674</td> </tr> </tbody> <tfoot> <tr> <th class="text-left" id="T9-row-10" headers="T9-col-1"><b>Total</b></th> <td headers="T9-col-2 T9-row-10 T9-col-1" class="text-right"><b>$141,369,892</b></td> </tr> </tfoot> </table> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 6.3: Number of Funded Proposal-Based Housing Projects </caption> <colgroup> <col class="col-md-4"> <col class="col-md-4"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th id="T10-col-1"><b>Region</b></th> <th class="text-right" id="T10-col-2"><b>Number In Progress </b></th> <th class="text-right" id="T10-col-3"><b>Number Completed </b></th> </tr> </thead> <tbody> <tr class="text-right"> <th id="T10-row-1" headers="T10-col-1">Atlantic</th> <td headers="T10-col-2 T10-row-1 T10-col-1">0</td> <td headers="T10-col-3 T10-row-1 T10-col-1">4</td> </tr> <tr class="text-right"> <th id="T10-row-2" headers="T10-col-1">Quebec</th> <td headers="T10-col-2 T10-row-2 T10-col-1">1</td> <td headers="T10-col-3 T10-row-2 T10-col-1">1</td> </tr> <tr class="text-right"> <th id="T10-row-3" headers="T10-col-1">Ontario</th> <td headers="T10-col-2 T10-row-3 T10-col-1">4</td> <td headers="T10-col-3 T10-row-3 T10-col-1">1</td> </tr> <tr class="text-right"> <th id="T10-row-4" headers="T10-col-1">Manitoba</th> <td headers="T10-col-2 T10-row-4 T10-col-1">7</td> <td headers="T10-col-3 T10-row-4 T10-col-1">1</td> </tr> <tr class="text-right"> <th id="T10-row-5" headers="T10-col-1">Saskatchewan</th> <td headers="T10-col-2 T10-row-5 T10-col-1">0</td> <td headers="T10-col-3 T10-row-5 T10-col-1">1</td> </tr> <tr class="text-right"> <th id="T10-row-6" headers="T10-col-1">Alberta</th> <td headers="T10-col-2 T10-row-6 T10-col-1">0</td> <td headers="T10-col-3 T10-row-6 T10-col-1">12</td> </tr> <tr class="text-right"> <th id="T10-row-7" headers="T10-col-1">British Columbia</th> <td headers="T10-col-2 T10-row-7 T10-col-1">17</td> <td headers="T10-col-3 T10-row-7 T10-col-1">181</td> </tr> <tr class="text-right"> <th id="T10-row-8" headers="T10-col-1">Yukon</th> <td headers="T10-col-2 T10-row-8 T10-col-1">0</td> <td headers="T10-col-3 T10-row-8 T10-col-1">2</td> </tr> </tbody> <tfoot> <tr class="text-right"> <th id="T10-row-9" headers="T10-col-1"> Total </th> <td headers="T10-col-2 T10-row-9 T10-col-1">29</td> <td headers="T10-col-3 T10-row-9 T10-col-1">203</td> </tr> </tfoot> </table> </div> <p>For a detailed list of all funded Housing proposal projects for 2013-2014 please refer to <a href="#a40">Annex&nbsp;C</a> of this report.</p> <div class="row mrgn-tp-md"> <div class="col-md-12"> <figure> <figcaption>Graph 6.1: 5-Year Funding Trend (All Votes)&nbsp;&ndash; Housing ($<abbr title="million">M</abbr>)</figcaption> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR_Graph_6_1_1450367981976_eng.jpg" alt="Graph 6.1: 5-Year Funding Trend&nbsp;&ndash; Housing" class="img-responsive"> <details class="mrgn-tp-md mrgn-bttm-md"> <summary class="wb-toggle bg-warning" data-toggle='{"print": "on"}'>Description of figure 6.1&nbsp;&ndash; 5-Year Funding Trend (All Votes)&nbsp;&ndash; Housing ($<abbr title="million">M</abbr>)</summary> <p>This is a chart showing the five year funding trend of the Housing program area for the years 2009-2010 to 2013-2014. Each fiscal year is divided into A-Base funding, Targeted funding, and Salary &amp; Administration funding. The graph is a stacked bar chart.</p> <ul> <li>In 2009-2010, A-Base represents $122<abbr title="million">M</abbr>, Targeted $75<abbr title="million">M</abbr> and Salary &amp; Administration $3<abbr title="million">M</abbr> for a total of $200<abbr title="million">M</abbr>.</li> <li>In 2010-2011, A-Base represents $110<abbr title="million">M</abbr>, Targeted $79<abbr title="million">M</abbr> and Salary &amp; Administration $2<abbr title="million">M</abbr> for a total of $191<abbr title="million">M</abbr>.</li> <li>In 2011-2012, A-Base represents $130<abbr title="million">M</abbr>, no Targeted funding and Salary &amp; Administration $2<abbr title="million">M</abbr> for a total of $132<abbr title="million">M</abbr>.</li> <li>In 2012-2013, A-Base represents $118<abbr title="million">M</abbr>, no Targeted funding and Salary &amp; Administration $3<abbr title="million">M</abbr> for a total of $121<abbr title="million">M</abbr>.</li> <li>In 2013-2014, A-Base represents $141<abbr title="million">M</abbr>, no Targeted funding and Salary &amp; Administration $2<abbr title="million">M</abbr> for a total of $143<abbr title="million">M</abbr>.</li> </ul> </details> </figure> </div> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 6.4: Key Performance Indicators </caption> <colgroup> <col class="col-md-3"> <col class="col-md-4"> <col class="col-md-3"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">Expected Results</th> <th scope="col">Performance Indicators</th> <th scope="col">Targets</th> <th scope="col">Actual Results</th> </tr> </thead> <tbody> <tr> <td>Housing infrastructure meets the needs of First Nations communities</td> <td>Percentage of First Nations housing that is &quot;adequate&quot; as assessed and reported annually by First Nations ["Adequate" is defined in the Year-end Reporting Handbook for the Housing Data Collection Instrument.]</td> <td><ul> <li>Maintain 72% by March 31, 2014</li> <li> Maintain 72% by March 31, 2015</li> </ul></td> <td>75%*</td> </tr> </tbody> <tfoot> <tr> <td colspan="4">*Since the determinant of whether housing is "adequate" is self-assessed and self-reported by First Nations using the Housing Data Collection Instrument, the results cannot be independently verified. Consequently, caution should be used when drawing on the results because they may fluctuate significantly year-over-year.</td> </tr> </tfoot> </table> </div> </section> <section> <div class="clearfix">&nbsp;</div> <h3 id="a30">Investment Highlights</h3> <section> <h4>Daylu Dena, Yukon&nbsp;&ndash; Subdivision</h4> <p>Daylu Dena Council is located in Northern British Columbia, close to the Yukon border. Daylu Dena Council experienced the return of an 80-year flood in June&nbsp;2012, which was the third flood in the last 8&nbsp;years and was&nbsp;the highest in recorded history. The flood&nbsp;affected 11&nbsp;homes, with individuals being displaced for approximately 8 to 10&nbsp;months.</p> <p>An engineering report suggested the mitigation measures to protect the houses from floods, outweighed the cost of relocating the homes and developing a subdivision. The engineering report estimated the costs of relocation and subdivision development to be $1.8&nbsp;million.</p> <p>The project proved to be successful, as flooding occurred again during the spring of 2013 on the land where the homes were previously located. The First Nation is planning to complete the final repairs to the flood damaged homes this year, cleaning up debris, decommissioning old wells and septic systems, and completing the landscaping. The majority of the work should be completed by March&nbsp;2014.</p> </section> <section> <h4>Island Lake Tribal Council Region, Manitoba&nbsp;&ndash; Housing Retrofits</h4> <div class="pull-left mrgn-rght-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img7_1450707280393_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <div class="pull-right mrgn-lft-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img8_1450707297216_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <p>The Island Lake Tribal Council region consists of four First Nations: Garden Hill, St.&nbsp;Theresa Point, Wasagamack and Red Sucker Lake. The communities have a combined on-reserve population of 9,923 and are all located approximately 300&nbsp;<abbr title="kilometer">km</abbr> east of Thompson, Manitoba. The reserves have 1,461&nbsp;housing units, and 942 of these homes had no running water and sewer services prior to 2012.</p> <p><abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> is working with the Island Lake Tribal Council communities toward a long-term strategy to address the water and wastewater infrastructure needs of their communities. In the meantime, the department is taking interim action with the four communities in order to address their highest priorities.</p> <div class="clearfix">&nbsp;</div> <div class="pull-left mrgn-rght-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img9_1450707315894_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <div class="pull-right mrgn-lft-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img10_1450707334556_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <p>In November 2012, Island Lake Tribal Council submitted a five year plan to have 942&nbsp;houses retrofitted to provide running water and sewer services by 2016-17 at a total cost of $43&nbsp;million. The multi-year plan was initiated in 2011-12 and water and sewer trucks have been purchased and delivered, garages to park them have been built and 100&nbsp;houses have been retrofitted as of Spring&nbsp;2013. The materials for an additional 218&nbsp;houses were delivered over the winter road in February/March&nbsp;2013. Construction will start in the spring of 2013 for completion by March&nbsp;31,&nbsp;2014.</p> <div class="clearfix">&nbsp;</div> </section> </section> <section> <h3 id="a31">Looking Forward</h3> <p><abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> is planning to allocate annually over $138&nbsp;million for on-reserve housing over the next three fiscal years.</p> <p><abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> will continue to collaborate with Canada Mortgage and Housing Corporation, particularly on capacity-development initiatives and information sharing. <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> will also continue to collaborate with the Assembly of First Nations, Canada Mortgage and Housing Corporation and Health Canada on joint initiatives such as mould remediation</p> </section> </section> <section> <h2 id="a32">7. Other Community Infrastructure</h2> <section> <h3 id="a33">Sub-Category Description</h3> <p>This sub-program helps fund the planning, design, construction, acquisition, and operation and maintenance of community infrastructure assets and facilities. It provides funding for coordination, training, and capacity building for activities related to community infrastructure assets and facilities. The goal is to support First Nations in meeting health and safety standards for their assets and in providing their residents with similar levels of service to those in off-reserve communities of similar size and circumstance. First Nations identify their priorities and needs and present project proposals to the Department. Funding is provided based on a priority assessment.</p> <p>Projects funded under this sub-program include:</p> <ul> <li>Planning &amp; Skills Development: Community planning and/or skills development projects that will support long-term sustainable community development of First Nation communities.</li> <li>Solid Waste Management: Projects that improve solid waste management and increase the recovery and use of recycled and organic materials, reduces per capita tonnage of solid waste sent to a landfill, as well as reduce environmental impacts and enhances energy recovery.</li> <li>Roads and Bridges: Projects that construct or maintain local roads, arterial roads and bridges within local boundaries, or roads and bridges projects which fall outside local boundaries but provide access to local communities</li> <li>Energy Systems: Projects that optimize the use of energy systems (e.g. heat and electricity in buildings and other installations), accesses provincially owned energy grids, deploys alternative sources of energy, and reduces the Greenhouse Gas emissions and air contaminants arising from local sources.</li> <li>Connectivity: Projects that support under-connected First Nations to gain access to nearby regional broadband networks and/or nearby regional telecommunications rural broadband expansion projects in order to enhance community access to information and broadband technologies.</li> <li>Disaster Mitigation: Projects that eliminate or reduce the impacts and risks of hazards through proactive measures taken before an emergency, hazard, or disaster occurs.</li> <li>Fire Protection: Projects that support the purchase of equipment and infrastructure (fire trucks, fire halls, etc.), operations and maintenance, and firefighter training to enhance a community's capacity for fire protection and prevention.</li> <li>Fuel Tanks: Support First Nations to comply with the Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations introduced by Environment Canada in 2008 for fuel storage tank systems 2,500&nbsp;litres or more on federal and Aboriginal lands, including reserve lands.</li> <li>General Infrastructure: Projects that construct or maintain general community assets such as band offices or community recreational facilities or that support the purchase of band assets (e.g. essential community vehicles).</li> </ul> </section> <section> <h3 id="a34">Other Community Infrastructure at a Glance 2013-2014</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 7.1: 2013-2014 Actual Expenditures&nbsp;&ndash; Other Community Infrastructure </caption> <colgroup> <col class="col-md-8"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th colspan="2" id="T11-row-1">A-Base Allocations to Eligible Recipients (Vote&nbsp;10)</th> </tr> </thead> <tbody> <tr> <th id="T11-row-2" headers="T11-row-1">Capital</th> <td headers="T11-row-2 T11-row-1" class="text-right">$168,865,362</td> </tr> <tr> <th id="T11-row-3" headers="T11-row-1">Operations and Maintenance</th> <td headers="T11-row-3 T11-row-1" class="text-right">$171,566,387</td> </tr> <tr> <th id="T11-row-4" headers="T11-row-1">Total A-Base</th> <td headers="T11-row-4 T11-row-1" class="text-right"><b>$340,431,749</b></td> </tr> <tr class="active"> <th colspan="2" id="T11-row-5">Targeted Allocations to Eligible Recipients (Vote 10)</th> </tr> <tr> <th id="T11-row-6" headers="T11-row-5">Fuel Tanks</th> <td headers="T11-row-6 T11-row-5" class="text-right">$21,834,576</td> </tr> <tr> <th id="T11-row-7" headers="T11-row-5">First Nation Infrastructure Fund</th> <td headers="T11-row-7 T11-row-5" class="text-right">$3,026,983</td> </tr> <tr> <th id="T11-row-8" headers="T11-row-5">Total Targeted</th> <td headers="T11-row-8 T11-row-5" class="text-right"><b>$24,861,559</b></td> </tr> <tr> <th id="T11-row-9" headers="T11-row-5">Total A-Base and Targeted (Vote&nbsp;10)</th> <td headers="T11-row-9 T11-row-5" class="text-right"><b>$365,293,308</b></td> </tr> <tr class="active"> <th colspan="2" id="T11-row-10">2013-2014 Salary &amp; Administration (Votes 1&amp;5)</th> </tr> <tr> <th id="T11-row-11" headers="T11-row-10">Total Salary &amp; Administration</th> <td headers="T11-row-11 T11-row-10" class="text-right"><b>$17,349,770</b></td> </tr> </tbody> <tfoot> <tr> <th id="T11-row-12" headers="T11-row-10">Total Investments </th> <td headers="T11-row-12 T11-row-10" class="text-right"><b>$382,643,078</b></td> </tr> </tfoot> </table> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 7.2: Regional Funding Level&nbsp;&ndash; A-Base &amp; Targeted (Vote&nbsp;10) </caption> <colgroup> <col class="col-md-8"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th id="T12-col-1">Region</th> <th id="T12-col-2" class="text-right">Funding</th> </tr> </thead> <tbody> <tr> <th id="T12-row-1" headers="T12-col-1">Atlantic</th> <td headers="T12-col-2 T12-row-1 T12-col-1" class="text-right">$23,734,201</td> </tr> <tr> <th id="T12-row-2" headers="T12-col-1">Quebec</th> <td headers="T12-col-2 T12-row-2 T12-col-1" class="text-right">$29,134,783</td> </tr> <tr> <th id="T12-row-3" headers="T12-col-1">Ontario</th> <td headers="T12-col-2 T12-row-3 T12-col-1" class="text-right">$94,177,684</td> </tr> <tr> <th id="T12-row-4" headers="T12-col-1">Manitoba</th> <td headers="T12-col-2 T12-row-4 T12-col-1" class="text-right">$75,391,291</td> </tr> <tr> <th id="T12-row-5" headers="T12-col-1">Saskatchewan</th> <td headers="T12-col-2 T12-row-5 T12-col-1" class="text-right">$36,210,431</td> </tr> <tr> <th id="T12-row-6" headers="T12-col-1">Alberta</th> <td headers="T12-col-2 T12-row-6 T12-col-1" class="text-right">$38,404,097</td> </tr> <tr> <th id="T12-row-7" headers="T12-col-1">British Columbia</th> <td headers="T12-col-2 T12-row-7 T12-col-1" class="text-right">$65,219,918</td> </tr> <tr> <th id="T12-row-8" headers="T12-col-1">Yukon</th> <td headers="T12-col-2 T12-row-8 T12-col-1" class="text-right">$2,745,279</td> </tr> <tr> <th id="T12-row-9" headers="T12-col-1"><abbr title="Headquarters">HQ</abbr></th> <td headers="T12-col-2 T12-row-9 T12-col-1" class="text-right">$275,625</td> </tr> </tbody> <tfoot> <tr> <th class="text-left" id="T12-row-10" headers="T12-col-1"><b>Total</b></th> <td headers="T12-col-2 T12-row-10 T12-col-1" class="text-right"><b>$365,293,309</b></td> </tr> </tfoot> </table> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 7.3: Number of Funded Proposal-Based Other Community Infrastructure Projects </caption> <colgroup> <col class="col-md-4"> <col class="col-md-4"> <col class="col-md-4"> </colgroup> <thead> <tr class="active"> <th id="T13-col-1"><b>Region</b></th> <th class="text-right" id="T13-col-2"><b>Number In Progress </b></th> <th class="text-right" id="T13-col-3"><b>Number Completed </b></th> </tr> </thead> <tbody> <tr class="text-right"> <th id="T13-row-1" headers="T13-col-1">Atlantic</th> <td headers="T13-col-2 T13-row-1 T13-col-1">3</td> <td headers="T13-col-3 T13-row-1 T13-col-1">13</td> </tr> <tr class="text-right"> <th id="T13-row-2" headers="T13-col-1">Quebec</th> <td headers="T13-col-2 T13-row-2 T13-col-1">4</td> <td headers="T13-col-3 T13-row-2 T13-col-1">27</td> </tr> <tr class="text-right"> <th id="T13-row-3" headers="T13-col-1">Ontario</th> <td headers="T13-col-2 T13-row-3 T13-col-1">33</td> <td headers="T13-col-3 T13-row-3 T13-col-1">22</td> </tr> <tr class="text-right"> <th id="T13-row-4" headers="T13-col-1">Manitoba</th> <td headers="T13-col-2 T13-row-4 T13-col-1">6</td> <td headers="T13-col-3 T13-row-4 T13-col-1">10</td> </tr> <tr class="text-right"> <th id="T13-row-5" headers="T13-col-1">Saskatchewan</th> <td headers="T13-col-2 T13-row-5 T13-col-1">11</td> <td headers="T13-col-3 T13-row-5 T13-col-1">11</td> </tr> <tr class="text-right"> <th id="T13-row-6" headers="T13-col-1">Alberta</th> <td headers="T13-col-2 T13-row-6 T13-col-1">3</td> <td headers="T13-col-3 T13-row-6 T13-col-1">28</td> </tr> <tr class="text-right"> <th id="T13-row-7" headers="T13-col-1">British Columbia</th> <td headers="T13-col-2 T13-row-7 T13-col-1">42</td> <td headers="T13-col-3 T13-row-7 T13-col-1">74</td> </tr> <tr class="text-right"> <th id="T13-row-8" headers="T13-col-1">Yukon</th> <td headers="T13-col-2 T13-row-8 T13-col-1">0</td> <td headers="T13-col-3 T13-row-8 T13-col-1">2</td> </tr> </tbody> <tfoot> <tr class="text-right"> <th id="T13-row-9" headers="T13-col-1"> Total </th> <td headers="T13-col-2 T13-row-9 T13-col-1">102</td> <td headers="T13-col-3 T13-row-9 T13-col-1">187</td> </tr> </tfoot> </table> </div> <p>For a detailed list of all funded Other Community Infrastructure proposal for 2013-2014 projects please refer to <a href="#a41">Annex&nbsp;D</a> of this report.</p> <div class="row mrgn-tp-md"> <div class="col-md-12"> <figure> <figcaption>Graph 7.1: 5-Year Funding Trend (All Votes)&nbsp;&ndash; Other Community Infrastructure ($<abbr title="million">M</abbr>)</figcaption> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR_Graph_7_1_1450367996515_eng.jpg" alt="Graph 7.1: 5-Year Funding Trend&nbsp;&ndash; Other Community Infrastructure" class="img-responsive"> <details class="mrgn-tp-md mrgn-bttm-md"> <summary class="wb-toggle bg-warning" data-toggle='{"print": "on"}'>Description of figure 7.1&nbsp;&ndash; 5-Year Funding Trend (All Votes)&nbsp;&ndash; Other Community Infrastructure ($<abbr title="million">M</abbr>)</summary> <p>This is a chart showing the five year funding trend of the Other Community Infrastructure program area for the years 2009-2010 to 2013-2014. Each fiscal year is divided into A-Base funding, Targeted funding, and Salary &amp; Administration funding. The graph is a stacked bar chart.</p> <ul> <li>In 2009-2010, A-Base represents $370<abbr title="million">M</abbr>, Targeted $46<abbr title="million">M</abbr> and Salary &amp; Administration $21<abbr title="million">M</abbr> for a total of $437<abbr title="million">M</abbr>.</li> <li>In 2010-2011, A-Base represents $355<abbr title="million">M</abbr>, Targeted $37<abbr title="million">M</abbr> and Salary &amp; Administration $18<abbr title="million">M</abbr> for a total of $410<abbr title="million">M</abbr>.</li> <li>In 2011-2012, A-Base represents $338<abbr title="million">M</abbr>, Targeted $91<abbr title="million">M</abbr> and Salary &amp; Administration $24<abbr title="million">M</abbr> for a total of $453<abbr title="million">M</abbr>.</li> <li>In 2012-2013, A-Base represents $333<abbr title="million">M</abbr>, Targeted $72<abbr title="million">M</abbr> and Salary &amp; Administration $20<abbr title="million">M</abbr> for a total of $425<abbr title="million">M</abbr>.</li> <li>In 2013-2014, A-Base represents $340<abbr title="million">M</abbr>, Targeted $28<abbr title="million">M</abbr> and Salary &amp; Administration $19<abbr title="million">M</abbr> for a total of $387<abbr title="million">M</abbr>.</li> </ul> </details> </figure> </div> </div> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed small"> <caption> Table 7.4: Key Performance Indicators </caption> <colgroup> <col class="col-md-3"> <col class="col-md-4"> <col class="col-md-3"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">Expected Results</th> <th scope="col">Performance Indicators</th> <th scope="col">Targets</th> <th scope="col">Actual Results</th> </tr> </thead> <tbody> <tr> <td rowspan="3">First Nations communities have a base of safe infrastructure that meets established standards (e.g., fire protection, electricity, safe roads and bridges, and telecommunications)</td> <td>Percentage of First Nations communities with access to broadband connectivity</td> <td><ul> <li>60% by March 31, 2014</li> <li> 70% by March 31, 2015</li> </ul></td> <td>80%</td> </tr> <tr> <td>Percentage of bridges with greater than &quot;fair&quot; condition rating</td> <td><ul> <li>Maintain 65% by March 31, 2014</li> <li>Maintain 65% by March 31, 2015</li> </ul></td> <td>54%</td> </tr> <tr> <td>Percentage of roads with greater than &quot;fair&quot; condition rating</td> <td><ul> <li>Maintain 45% by March 31, 2014</li> <li>Maintain 45% by March 31, 2015</li> </ul></td> <td>42%</td> </tr> </tbody> </table> </div> </section> <section> <div class="clearfix">&nbsp;</div> <h3 id="a35">Investment Highlights</h3> <p>In 2013-2014, the Department provided approximately $98 million in funding for 270&nbsp;Other Community Infrastructure proposal-based projects (see <a href="../../../tab7-3">Table&nbsp;7.3</a> for detailed breakdown of investments) or organizations to deliver projects. Highlights from these investments include:</p> <ul> <li>Funding of $272,825 for the Aboriginal Firefighters Association of Canada to organize a number of fire prevention awareness and training initiatives throughout the year, including the annual National Aboriginal Firefighters Competition and the National Fire Safety Poster Contest for school-aged children and youth.</li> <li>The Department launched the national <cite>BeFireSafe</cite> education campaign in partnership with the Aboriginal Firefighters Association of Canada on March&nbsp;20,&nbsp;2014 to raise awareness of the importance of fire prevention in First Nation communities. The year-long campaign aims to reduce fire-related deaths, injuries and damages by sharing seasonal fire safety tips and information through regular radio features and social media messaging.</li> <li>Funding of $2&nbsp;<abbr title="million">M</abbr> to upgrade both the diesel generating station and the community's distribution system in the remote coastal community of Gitga'at First Nation, to allow the transfer of responsibility for electrical service to <abbr title="British Columbia">BC</abbr> Hydro. With the completion of this project, the residents of Gitga'at now enjoy reliable electrical service at rates similar to other residents of British Columbia, a significant savings from the cost of their previous system.</li> </ul> </section> <section> <h4>Louis Bull Tribe, Alberta&nbsp;&ndash; Transfer Station </h4> <div class="pull-right mrgn-lft-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img11_1450707353982_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <p>The Louis Bull Tribe has an on-reserve registered population of 1,475 and is located in Maskwacis, just south of Edmonton, Alberta. The community's original landfill site was established in the early 1990s, and numerous reports have noted that a new properly designed&nbsp;and constructed transfer station&nbsp;is required to address the considerable waste management and health and safety issues with the existing arrangement.</p> <p>Through the First Nation Infrastructure Fund, the department was able to secure funding in the order of $2.0&nbsp;million for this project. The scope of the project includes the construction of a waste transfer station and the decommissioning of the existing landfill. Construction of the transfer station started in September&nbsp;2012 and the project is now completed and operational.</p> </section> <section> <h4> Mistawasis First Nation, Saskatchewan&nbsp;&ndash; Gasification</h4> <p>Mistawasis First Nation has an on-reserve registered population of 1,103 and is located approximate 80 <abbr title="kilometer">km</abbr> west of Prince Albert, Saskatchewan. The gasification project aims to provide natural gas to all houses and buildings on the Mistawasis reserve. The project will be constructed in 2013-2014 and is estimated to cost $2.6&nbsp;million. The provincial natural gas provider, SaskEnergy, is paying $379,000 of this amount, with the remainder shared 50/50 by the First Nation and <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr>.</p> <section> <h4> Pekuakamiulnuatsh Takuhikan First Nation, Quebec&nbsp;&ndash; Remediation of Ouiatchouane Street</h4> <div class="pull-left mrgn-rght-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img12_1450707370554_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <p>Pekuakamiulnuatsh Tauhikan First Nation has a registered on-reserve population of 2,049 and is located 267&nbsp;<abbr title="kilometer">km</abbr> north of Quebec City. The community began work to upgrade the Ouiatchouane Street in the early 2000. Work is currently underway to further upgrade a new stretch of road. This upgrade project will focus on improving the roadbed and surface of the road but will also include the installation of water trunk lines, sanitary wastewater, and a storm drain system. This project began in September 2012 and is anticipated to be completed sometime in September&nbsp;2013. <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> is investing $4&nbsp;million dollars into this project while the Band is contributing $173&nbsp;thousand of their own source revenue.</p> </section> <section> <h4>Eskasoni First Nation, Nova Scotia&nbsp;&ndash; Fuel Tank Replacement</h4> <div class="pull-right mrgn-lft-md"> <figure> <img src="/DAM/DAM-ISC-SAC/DAM-INF/STAGING/images-images/cIIR-img13_1450707384393_eng.jpg" alt="" class="img-responsive thumbnail"> </figure> </div> <p>Eskasoni First Nation is located about 400&nbsp;<abbr title="kilometer">km</abbr> east of Halifax alongside the Bras d'Or Lake in Cape Breton Island, Nova Scotia. Eskasoni represents the largest Aboriginal community in Atlantic Canada. The Eskasoni reserve, consisting of 2,800&nbsp;acres of land, dates back to 1834 and is home to the largest Mi'kmaq community in the world with an on-reserve population of approximately 3,700.</p> <p>In 2008, Environment Canada introduced the <cite>Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations</cite> for fuel storage tank systems 2,500&nbsp;litres or more. At the time, the Eskasoni High School was heated with fuel stored in a 9,150&nbsp;litre single walled tank located inside the building while the middle school used two smaller tanks, none of which complied with the new regulations.</p> <p>With $125,710 in 2013-2014 program funding, the fuel tank at Eskasoni High School was replaced along with two fuel tanks at the Middle School replaced with one larger tank. The picture below, taken at the time of substantial completion inspection, shows the High School's new 13,800&nbsp;litre double-walled aboveground storage tank&nbsp;&ndash; complete with vacuum monitoring, located outside the school building now compliant with Environment Canada's regulations.</p> </section> </section> <section> <h3 id="a36">Looking Forward</h3> <p>In 2014-2015, <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> will support Other Community Infrastructure and Activities in the following ways:</p> <ul> <li>Work with the Aboriginal Firefighters Association of Canada to renew the First Nations Fire Protection Strategy, building on the successes and lessons learned of the existing 2010-2015 version.</li> <li>Expanding the <cite>BeFireSafe</cite> education campaign with communities and regional partners.</li> <li>Work to implement the renewed First Nation Infrastructure Fund, including expanding the fund to include disaster mitigation and developing a proposal review process for the Building Canada Fund funding envelope of the First Nation Infrastructure Fund.</li> <li>Support Regional Offices and First Nations with the identification, prioritization, and proposal of structural disaster mitigation projects on a comparable national scale, in using the Structural Mitigation Framework and Structural Mitigation Ranking Tool.</li> </ul> </section> </section> <section> <h2 id="a37">8. Conclusion&nbsp;&ndash; Long-term Initiatives</h2> <p>Improving infrastructure outcomes for First Nations across Canada is a priority for the Government of Canada. As well, developing greater self-sufficiency and exploring alternative governance approaches to governance and capacity support for asset management will be a focus for the Department in the coming year. For example, discussions have begun with the Atlantic Policy Congress in the Atlantic region on examining options for an aggregated authority to manage all water and wastewater facilities within the Atlantic region. This type of approach could develop under a centralized authority responsible for maintaining quality water services for all First Nation communities. Along with examining alternative approached to financing and procuring infrastructure, the Department will continue to support the exploration of innovative approaches to the delivery of infrastructure programs and services on reserve.</p> <p>The Department is committed to continuing to support First Nations in the operation and maintenance of public infrastructure and will be supporting reforms to the Asset Condition Reporting System through the inclusion of fire-safety inspections in 2014-2015.</p> <p>Capacity development will also be a focus for the Department. Building on the success of the Circuit Rider Training Program for water and wastewater, the Department will examine options for improved capacity for the operation and maintenance of other infrastructure assets.</p> <p>Finally, the Department will work towards exploring options to improve outcomes for operations and maintenance of infrastructure on reserve. Focusing efforts and targeted funding towards operations and maintenance will have a significant impact on meeting the desired outcomes and targets not only for the Department, but for First Nation communities across Canada. Effective and sustainable operations and maintenance of infrastructure helps protect the health and safety of all communities by supporting endeavours to maintained infrastructure to a consistent standard.</p> </section> <!-- ANNEXE A START --> <section> <div class="clearfix">&nbsp;</div> <h2 id="a38" class="mrgn-tp-md">Annex A: 372 Water &amp; Wastsewater Projects (April&nbsp;1,&nbsp;2013 to March&nbsp;31,&nbsp;2014)</h2> <section> <h3>Atlantic (AT) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Acadia</td> <td>Water</td> <td>A-Base</td> <td class="text-right">$14,859</td> <td class="text-right">$14,859</td> </tr> <tr> <td>Annapolis Valley</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$33,000</td> </tr> <tr> <td>Bouctouche</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$36,000</td> </tr> <tr> <td>Bouctouche</td> <td>Water System Upgrades</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,307,935</td> <td class="text-right">$1,224,146</td> </tr> <tr> <td>Chapel Island</td> <td>Water</td> <td>A-Base</td> <td class="text-right">$27,832</td> <td class="text-right">$27,832</td> </tr> <tr> <td>Chapel Island</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$47,800</td> </tr> <tr> <td>Eel Ground FN</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr> top up</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$19,000</td> </tr> <tr> <td>Elsipogtog FN</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr> top up</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$29,000</td> </tr> <tr> <td>Esgenoopetitj FN</td> <td>Upgrades to Pumping station</td> <td>A-Base</td> <td class="text-right">$564,406</td> <td class="text-right">$523,514</td> </tr> <tr> <td>Esgenoopetitj FN</td> <td>Wastewater Treatment</td> <td>A-Base</td> <td class="text-right">$8,600,000</td> <td class="text-right">$138,000</td> </tr> <tr> <td>Esgenoopetitj FN</td> <td>Water O &amp;M</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$78,615</td> </tr> <tr> <td>Eskasoni</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$80,000</td> </tr> <tr> <td>Indian Island</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$29,640</td> </tr> <tr> <td>Kingsclear FN</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr> top up</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$19,400</td> </tr> <tr> <td>Kingsclear FN</td> <td>Water System Upgrades</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,562,610</td> <td class="text-right">$982,610</td> </tr> <tr> <td>Metepenagiag FN</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr> top up</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$34,000</td> </tr> <tr> <td>Pabineau</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$32,000</td> </tr> <tr> <td>Paq'tnkek</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$16,000</td> </tr> <tr> <td>Pictou</td> <td>Water</td> <td>A-Base</td> <td class="text-right">$150,000</td> <td class="text-right">$150,000</td> </tr> <tr> <td>Pictou</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$15,000</td> </tr> <tr> <td>Tobique FN</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr> top up</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$9,400</td> </tr> <tr> <td>Wagmatcook</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$158,700</td> </tr> <tr> <td>Waycobah</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$37,500</td> </tr> <tr> <td>Woodstock FN</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr> top up</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$33,800</td> </tr> <tr> <td>Woodstock FN</td> <td>Water System Upgrades</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,751,272</td> <td class="text-right">$836,272</td> </tr> </tbody> </table> </div> </section> <section> <h3>Québec (QC) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Abitib.</td> <td><span lang="fr">Réhabilitation - Biodiscs</span></td> <td>A-Base</td> <td class="text-right">$65,000</td> <td class="text-right">$65,000</td> </tr> <tr> <td>Ekuanitshit</td> <td><span lang="fr">Eau potable correctif</span> - QL72</td> <td>A-Base</td> <td class="text-right">$607,130</td> <td class="text-right">$179,600</td> </tr> <tr> <td>Ekuanitshit</td> <td><span lang="fr">Émissaire pluvial</span></td> <td>A-Base</td> <td class="text-right">$1,200,000</td> <td class="text-right">$50,598</td> </tr> <tr> <td>Kanesatake</td> <td><span lang="fr">Étude de faisabilité</span> - Water &amp; Wastewater Network</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$117,264</td> <td class="text-right">$117,264</td> </tr> <tr> <td>Kipawa</td> <td>Drinking water system supply - QD12</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,607,000</td> <td class="text-right">$40,510</td> </tr> <tr> <td>Kipawa</td> <td>Wagosh Crescent Curb</td> <td>A-Base</td> <td class="text-right">$153,567</td> <td class="text-right">$153,567</td> </tr> <tr> <td><span lang="fr">Lac Simon</span></td> <td><span lang="fr">Mise aux normes - Traitement de l'eau potable</span></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$298,250</td> <td class="text-right">$298,250</td> </tr> <tr> <td>Listuguj</td> <td><span lang="fr">Réhab. Réseau collecte eaux usées</span> - QC10</td> <td>A-Base</td> <td class="text-right">$389,805</td> <td class="text-right">$389,805</td> </tr> <tr> <td>Long Point</td> <td><span lang="fr">Réhabilitation étangs aérés</span></td> <td>A-Base</td> <td class="text-right">$346,268</td> <td class="text-right">$346,268</td> </tr> <tr> <td>Mashteuiatsh</td> <td><span lang="fr">Pompe alimentation eau brute</span></td> <td>A-Base</td> <td class="text-right">$48,683</td> <td class="text-right">$48,683</td> </tr> <tr> <td>Natashquan</td> <td><span lang="fr">Clôture de protection - eau potable</span></td> <td>A-Base</td> <td class="text-right">$10,200</td> <td class="text-right">$10,200</td> </tr> <tr> <td>Odanak</td> <td><span lang="fr">Vidanges de boues</span></td> <td>A-Base</td> <td class="text-right">$33,458</td> <td class="text-right">$33,458</td> </tr> <tr> <td>Opitciwan</td> <td>Eau potable / étude - QD41</td> <td>A-Base</td> <td class="text-right">$496,284</td> <td class="text-right">$496,284</td> </tr> <tr> <td>Opitciwan</td> <td><span lang="fr">Nappe phréatique - Étude</span> - QM26</td> <td>A-Base</td> <td class="text-right">$18,350</td> <td class="text-right">$18,350</td> </tr> <tr> <td>Pakua Shipu</td> <td><span lang="fr">Conception émissaire eaux usées</span></td> <td>A-Base</td> <td class="text-right">$600,000</td> <td class="text-right">$28,477</td> </tr> <tr> <td>Timiskaming</td> <td>Drinking water system upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,272,595</td> <td class="text-right">$50,000</td> </tr> <tr> <td>Timiskaming</td> <td>Sanitary Sewer inspection - QL37</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$459,672</td> <td class="text-right">$459,672</td> </tr> <tr> <td>Uashat</td> <td><span lang="fr">Prolongement des infrastructures</span></td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,268,181</td> <td class="text-right">$500,000</td> </tr> <tr> <td>Uashat</td> <td><span lang="fr">Réhabilitation, Regard sanitaire</span></td> <td>A-Base</td> <td class="text-right">$69,500</td> <td class="text-right">$69,500</td> </tr> <tr> <td>Uashat</td> <td><span lang="fr">Taitement des eaux usées</span> - Maliotenam</td> <td>A-Base</td> <td class="text-right">$6,677</td> <td class="text-right">$6,677</td> </tr> <tr> <td>Uashat</td> <td><span lang="fr">Traitement eau potable</span> - Maliotenam - QD98</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,665,000</td> <td class="text-right">$170,000</td> </tr> <tr> <td>Wendake</td> <td><span lang="fr">Développement secteur Doyon</span></td> <td>A-Base</td> <td class="text-right">$2,300,000</td> <td class="text-right">$943,086</td> </tr> </tbody> </table> </div> </section> <section> <h3>Ontario (ON) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>0121 - Six Nations of the Grand River</td> <td>SIX NATIONS WTP</td> <td>A-Base</td> <td class="text-right">$26,065,812</td> <td class="text-right">$4,136,368</td> </tr> <tr> <td>0136 - Wasauksing First Nation</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$69,600</td> <td class="text-right">$69,600</td> </tr> <tr> <td>0137 - Shawanaga First Nation</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$109,878</td> <td class="text-right">$109,878</td> </tr> <tr> <td>0142 - Albany Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$71,900</td> <td class="text-right">$71,900</td> </tr> <tr> <td>0143 - Attawapiskat Band</td> <td>ATTAWAPISKAT WATER QUALITY IMPROVEMENT MEASURES #RHFR</td> <td>A-Base</td> <td class="text-right">$752,494</td> <td class="text-right">$43,994</td> </tr> <tr> <td>0143 - Attawapiskat Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$115,400</td> <td class="text-right">$115,400</td> </tr> <tr> <td>0144 - Moose Cree First Nation</td> <td>SEWAGE LAGOON UPGRADE - MOOSE CREE #RE2X</td> <td>A-Base</td> <td class="text-right">$2,908,810</td> <td class="text-right">$69,000</td> </tr> <tr> <td>0150 - Wabaseemoong Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$94,608</td> <td class="text-right">$94,608</td> </tr> <tr> <td>0150 - Wabaseemoong Band</td> <td>WABASEEMOONG WWTP REPAIRS #RJ9C</td> <td>A-Base</td> <td class="text-right">$986,185</td> <td class="text-right">$453,150</td> </tr> <tr> <td>0151 - Northwest Angle <abbr title="number">No</abbr> 33 Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$155,400</td> <td class="text-right">$155,400</td> </tr> <tr> <td>0152 - Northwest Angle <abbr title="number">No</abbr> 37 Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$155,400</td> <td class="text-right">$155,400</td> </tr> <tr> <td>0155 - Shoal Lake <abbr title="number">No</abbr>40 Band</td> <td>SHOAL LAKE #40 FIRST NATION- WATER TREATMENT PLANT #RA47</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$9,295,865</td> <td class="text-right">$8,165</td> </tr> <tr> <td>0156 - Wabauskang First Nation</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$51,877</td> <td class="text-right">$51,877</td> </tr> <tr> <td>0158 - Naotkamegwanning</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$60,800</td> <td class="text-right">$60,800</td> </tr> <tr> <td>0158 - Naotkamegwanning</td> <td>WEST END SERVICING DESIGN #RF1A</td> <td>A-Base</td> <td class="text-right">$6,864,576</td> <td class="text-right">$13,374</td> </tr> <tr> <td>0159 - Mohawks Council of Akwesasne</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> O/M DISCRETIONARY</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$51,500</td> <td class="text-right">$51,500</td> </tr> <tr> <td>0159 - Mohawks Council of Akwesasne</td> <td>TSI SNAIHNE FEASIBILITY STUDY AND WATER SUPPLY &amp; DISTRIBUTION PROJECT #RDHJ</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$7,805,690</td> <td class="text-right">$196,993</td> </tr> <tr> <td>0163 - Algonquins of Pikwakanagan</td> <td>URANIUM TESTING AND TREATMENT FOR INDIVIDUAL WELLS #RKOV</td> <td>A-Base</td> <td class="text-right">$56,810</td> <td class="text-right">$56,810</td> </tr> <tr> <td>0164 - Mohawks of the Bay of Quinte</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$67,285</td> <td class="text-right">$67,285</td> </tr> <tr> <td>0172 - Aamjiwnaang First Nation</td> <td>AAMJIWNAAG - WATER METER AND BACKFLOW PREVENTER #RKOB</td> <td>A-Base</td> <td class="text-right">$39,500</td> <td class="text-right">$39,500</td> </tr> <tr> <td>0182 - Constance Lake Band</td> <td>CONSTANCE LAKE - WELL FIELD CONNECTION WTP OPTIONS STUDY #RIBF</td> <td>A-Base</td> <td class="text-right">$1,090,365</td> <td class="text-right">$15,282</td> </tr> <tr> <td>0182 - Constance Lake Band</td> <td>CONSTANCE LAKE WELL LOCATION DEVELOPMENT PROGRAM #RI2J</td> <td>A-Base</td> <td class="text-right">$175,731</td> <td class="text-right">$5,963</td> </tr> <tr> <td>0183 - Eabametoong First Nation Indian Band</td> <td>WATER TREATABILITY STUDY AND OPTIONS ANALYSIS - EABAMETOONG #RE2P</td> <td>A-Base</td> <td class="text-right">$138,500</td> <td class="text-right">$11,500</td> </tr> <tr> <td>0185 - Ginoogaming First Nation</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> O/M DISCRETIONARY</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$16,668</td> <td class="text-right">$16,668</td> </tr> <tr> <td>0186 - Marten Falls Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> O/M DISCRETIONARY</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$362,560</td> <td class="text-right">$362,560</td> </tr> <tr> <td>0186 - Marten Falls Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$105,113</td> <td class="text-right">$105,113</td> </tr> <tr> <td>0186 - Marten Falls Band</td> <td>MARTEN FALLS - WATER TREATABILITY STUDY #RIES</td> <td>A-Base</td> <td class="text-right">$172,420</td> <td class="text-right">$48,130</td> </tr> <tr> <td>0195 - Pic Mobert Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> O/M DISCRETIONARY</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,002</td> <td class="text-right">$2,002</td> </tr> <tr> <td>0195 - Pic Mobert Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$41,993</td> <td class="text-right">$41,993</td> </tr> <tr> <td>0203 - Mishkeegogamang Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$160,000</td> <td class="text-right">$160,000</td> </tr> <tr> <td>0208 - Pikangikum Band</td> <td>PIKANGIKUM WATER/SEWER TRUCK PURCHASE #RJT2</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$230,000</td> <td class="text-right">$230,000</td> </tr> <tr> <td>0210 - Kasabonika Lake Band</td> <td>KASABONIKA RBC REPAIRS 2013 #RJQS</td> <td>A-Base</td> <td class="text-right">$27,877</td> <td class="text-right">$27,877</td> </tr> <tr> <td>0210 - Kasabonika Lake Band</td> <td>WASTEWATER TREATMENT OPTIONS #RJT6</td> <td>A-Base</td> <td class="text-right">$38,895</td> <td class="text-right">$38,895</td> </tr> <tr> <td>0211 - Sandy Lake Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$102,800</td> <td class="text-right">$102,800</td> </tr> <tr> <td>0213 - Muskrat Dam Lake Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> O/M DISCRETIONARY</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,838</td> <td class="text-right">$5,838</td> </tr> <tr> <td>0213 - Muskrat Dam Lake Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$110,000</td> <td class="text-right">$110,000</td> </tr> <tr> <td>0235 - Obashkaandagaang</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> O/M DISCRETIONARY</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,194</td> <td class="text-right">$5,194</td> </tr> <tr> <td>0237 - Deer Lake Band</td> <td>DEER LAKE WATER/SEWER TRUCK FIRE LOSS REPLACEMENT</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$240,000</td> <td class="text-right">$240,000</td> </tr> <tr> <td>0239 - Neskantaga First Nation</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> O/M DISCRETIONARY</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$47,596</td> <td class="text-right">$47,596</td> </tr> <tr> <td>0239 - Neskantaga First Nation</td> <td>WTP TREATABILITY STUDY - NESKANTAGA</td> <td>A-Base</td> <td class="text-right">$319,577</td> <td class="text-right">$9,050</td> </tr> <tr> <td>0241 - Nibinamik First Nation Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> O/M DISCRETIONARY</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,616</td> <td class="text-right">$2,616</td> </tr> <tr> <td>0243 - Kashechewan Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,534,150</td> <td class="text-right">$1,534,150</td> </tr> <tr> <td>0259 - Slate Falls Nation Band</td> <td>SLATE FALLS WATER SUPPLY &amp; DISTRIBUTION SYSTEM UPGRADE</td> <td>A-Base</td> <td class="text-right">$150,000</td> <td class="text-right">$150,000</td> </tr> <tr> <td>1003 - Keewaytinook Okimakanak Tribal Coun</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> O/M DISCRETIONARY</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$266,000</td> <td class="text-right">$266,000</td> </tr> <tr> <td>1003 - Keewaytinook Okimakanak Tribal Council</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$729,718</td> <td class="text-right">$729,718</td> </tr> <tr> <td>1048 - Windigo First Nations Council</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$400,016</td> <td class="text-right">$400,016</td> </tr> <tr> <td>1075 - Shibogama Tribal Council</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$318,096</td> <td class="text-right">$318,096</td> </tr> <tr> <td>1080 - Wabun Tribal Council</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> SWOP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$329,973</td> <td class="text-right">$329,973</td> </tr> <tr> <td>3675 - Ontario Clean Water Agency</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> 24/7 Technical Support</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$176,858</td> <td class="text-right">$176,858</td> </tr> <tr> <td>4860 - Northern Waterworks Inc</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> 24/7 Technical Support</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$258,183</td> <td class="text-right">$258,183</td> </tr> <tr> <td>4860 - Northern Waterworks Inc</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> O/M DISCRETIONARY</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$340,104</td> <td class="text-right">$340,104</td> </tr> <tr> <td>9238 - Ont. First Nations Technical Servs</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> API</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$409,000</td> <td class="text-right">$409,000</td> </tr> <tr> <td>9238 - Ont. First Nations Technical Servs</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> CRTP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,876,600</td> <td class="text-right">$1,876,600</td> </tr> </tbody> </table> </div> </section> <section> <h3>Manitoba (MB) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Bloodvein</td> <td>S629 Bloodvein Lift Station Repair</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$206,090</td> <td class="text-right">$206,090</td> </tr> <tr> <td>Garden Hill</td> <td>S578 Housing Plumbing Retrofits Phase <abbr title="roman numeral 2">II</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$466,545</td> <td class="text-right">$466,545</td> </tr> <tr> <td>Island Lake Tribal Council</td> <td>S519 Sewer Truck Garage Facilities</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$7,103,133</td> <td class="text-right">$2,973</td> </tr> <tr> <td>Island Lake Tribal Council</td> <td>S578 Housing Plumbing Retrofits Phase <abbr title="roman numeral 2">II</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$4,768,000</td> <td class="text-right">$568,000</td> </tr> <tr> <td>Keewatin Tribal Council</td> <td>Northern Communities Opportunities fund</td> <td>NCOF</td> <td class="text-right">$500,861</td> <td class="text-right">$500,861</td> </tr> <tr> <td>Keewatin Tribal Council (Bunibonibee)</td> <td>S575 Housing Water and Sewer Retrofits Phase I</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr>/Gathering Strength/A-Base</td> <td class="text-right">$4,671,900</td> <td class="text-right">$1,374,400</td> </tr> <tr> <td>Keewatin Tribal Council (Shamattawa)</td> <td>S533 Water Protocol Upgrade</td> <td>Gathering Strength</td> <td class="text-right">$1,638,600</td> <td class="text-right">$578,600</td> </tr> <tr> <td>Little Grand Rapids</td> <td>S562 WTP Expansion</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$7,155,900</td> <td class="text-right">$405,900</td> </tr> <tr> <td>Manto Sipi Cree Nation</td> <td>S625 WTP Repair</td> <td>NCOF</td> <td class="text-right">$60,000</td> <td class="text-right">$60,000</td> </tr> <tr> <td>Marcel Colomb</td> <td>S614 15 House Septic Tank Replacement</td> <td>Gathering Strength</td> <td class="text-right">$357,650</td> <td class="text-right">$357,650</td> </tr> <tr> <td>O-Chi-Chak-Ko-Sipi</td> <td>S555 WTP Protocol Upgrades</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$520,400</td> <td class="text-right">$520,400</td> </tr> <tr> <td>Pinaymootang</td> <td>S567 Water Protocol Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$725,891</td> <td class="text-right">$122,370</td> </tr> <tr> <td>Red Sucker Lake</td> <td>S578 Housing Plumbing Retrofits Phase <abbr title="roman numeral 2">II</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$427,320</td> <td class="text-right">$427,320</td> </tr> <tr> <td>Red Sucker Lake</td> <td>S635 Water Truck Purchase</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$110,873</td> <td class="text-right">$110,873</td> </tr> <tr> <td>Sayisi Dene</td> <td>S631 WTP Repair</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$187,000</td> <td class="text-right">$187,000</td> </tr> <tr> <td>Southeast Regional Development Corporation (Little Grand Rapids)</td> <td>S627 WTP Repair &amp; Bottled Water</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$134,335</td> <td class="text-right">$134,335</td> </tr> <tr> <td>St Theresa Pt</td> <td>S578 Housing Plumbing Retrofits Phase <abbr title="roman numeral 2">II</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$944,373</td> <td class="text-right">$994,373</td> </tr> <tr> <td>Wasagamack</td> <td>S578 Housing Plumbing Retrofits Phase <abbr title="roman numeral 2">II</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$569,855</td> <td class="text-right">$569,855</td> </tr> <tr> <td>York Factory</td> <td>S632 Bottled Water</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$52,505</td> <td class="text-right">$52,505</td> </tr> </tbody> </table> </div> </section> <section> <h3>Saskatchewan (SK) &ndash;<abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Canoe Lake</td> <td>Water Treatment Plant Expansion</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,693,000</td> <td class="text-right">$1,743,000</td> </tr> <tr> <td>English River</td> <td>Patuanak New Lagoon and SPS#1</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$8,833,500</td> <td class="text-right">$3,500,000</td> </tr> <tr> <td>Lac La Ronge</td> <td>Stanley Mission Lagoon Berm Raising</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$602,200</td> <td class="text-right">$602,200</td> </tr> <tr> <td>Mosquito</td> <td>Water Treatment Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$3,990,000</td> <td class="text-right">$686,600</td> </tr> <tr> <td>Muscowpetung</td> <td>Back-up Well and Refurbish Existing Well</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$290,000</td> <td class="text-right">$99,000</td> </tr> <tr> <td>Muscowpetung</td> <td>Lagoon Repairs</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$180,000</td> <td class="text-right">$50,000</td> </tr> <tr> <td>Muskeg Lake</td> <td>Water Plant Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,311,900</td> <td class="text-right">$1,066,900</td> </tr> <tr> <td>Nekaneet</td> <td>Small Water System</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$762,600</td> <td class="text-right">$227,600</td> </tr> <tr> <td>Peepeekisis</td> <td>Lagoon and Jet Replacements</td> <td>A-Base</td> <td class="text-right">$53,300</td> <td class="text-right">$53,300</td> </tr> <tr> <td>Pelican Lake</td> <td>WTP Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$4,712,200</td> <td class="text-right">$182,000</td> </tr> <tr> <td>Peter Ballantyne</td> <td>Southend Well protection and Supply to SPS</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$50,000</td> <td class="text-right">$111,000</td> </tr> <tr> <td>Poundmaker</td> <td>Water Treatment Plant Upgrade/Expansion</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$8,950,000</td> <td class="text-right">$364,200</td> </tr> <tr> <td>Red Earth</td> <td>Raw water Reservoir Expansion</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$3,967,000</td> <td class="text-right">$1,744,000</td> </tr> <tr> <td>Saulteaux</td> <td>Water Treatment Plant Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$4,358,000</td> <td class="text-right">$1,461,500</td> </tr> <tr> <td>Sturgeon Lake</td> <td>East End SPS #1 Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$400,000</td> <td class="text-right">$531,500</td> </tr> <tr> <td>Thunderchild</td> <td>Water Treatment Plant Expansion Turtle Lake</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,500,000</td> <td class="text-right">$543,600</td> </tr> <tr> <td>Witchekan Lake</td> <td>Water Treatment Plant Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,266,700</td> <td class="text-right">$1,151,700</td> </tr> </tbody> </table> </div> </section> <section> <h3>Alberta (AB) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Alexander</td> <td>Alexander Lagoon Emergency Repairs</td> <td>Gathering Strength</td> <td class="text-right">$50,000</td> <td class="text-right">$500,000</td> </tr> <tr> <td>Alexander</td> <td>Alexander Lagoon Feasibility Study</td> <td>Gathering Strength</td> <td class="text-right">$250,000</td> <td class="text-right">$55,000</td> </tr> <tr> <td>Alexander</td> <td>Alexander Water Truck</td> <td>A-Base</td> <td class="text-right">$209,000</td> <td class="text-right">$68,947</td> </tr> <tr> <td>Alexander</td> <td>Alexander Water Truck</td> <td>Gathering Strength</td> <td class="text-right">$209,000</td> <td class="text-right">$140,053</td> </tr> <tr> <td>Beaver First Nation</td> <td>Beaver Water System Design</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$653,173</td> <td class="text-right">$155,425</td> </tr> <tr> <td>Beaver First Nation</td> <td>Beaver Water System Design</td> <td>Gathering Strength</td> <td class="text-right">$653,173</td> <td class="text-right">$132,500</td> </tr> <tr> <td>Beaver Lake</td> <td>Beaver Lake Water Feasibility Study</td> <td>Gathering Strength</td> <td class="text-right">$75,000</td> <td class="text-right">$75,000</td> </tr> <tr> <td>Blood</td> <td>Blood Standoff Raw Water Pipeline</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$4,900,000</td> <td class="text-right">$2,900,000</td> </tr> <tr> <td>Blood</td> <td>Blood Tribe Vacuum Trucks</td> <td>Gathering Strength</td> <td class="text-right">$215,000</td> <td class="text-right">$180,000</td> </tr> <tr> <td>Blood</td> <td>Blood Tribe Water Trucks</td> <td>Gathering Strength</td> <td class="text-right">$335,000</td> <td class="text-right">$315,000</td> </tr> <tr> <td>Driftpile</td> <td>Driftpile Raw Water Reservoir Conversion</td> <td>A-Base</td> <td class="text-right">$99,326</td> <td class="text-right">$99,326</td> </tr> <tr> <td>Driftpile</td> <td>Driftpile Water &amp; Sewer Line Emergency Repairs</td> <td>A-Base</td> <td class="text-right">$219,406</td> <td class="text-right">$130,706</td> </tr> <tr> <td>Driftpile</td> <td>Driftpile Water &amp; Sewer Line Emergency Repairs</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$219,406</td> <td class="text-right">$33,700</td> </tr> <tr> <td>Driftpile</td> <td>Driftpile Water &amp; Sewer Line Emergency Repairs</td> <td>Gathering Strength</td> <td class="text-right">$219,406</td> <td class="text-right">$55,000</td> </tr> <tr> <td>Enoch</td> <td>Enoch Water Pump House/Reservoir Design</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$491,300</td> <td class="text-right">$491,300</td> </tr> <tr> <td>Fort McMurray</td> <td>Ft McMurray Surge Pond Repair</td> <td>A-Base</td> <td class="text-right">$255,299</td> <td class="text-right">$63,825</td> </tr> <tr> <td>Frog Lake</td> <td>Frog Lake Water Feasibility Study</td> <td>Gathering Strength</td> <td class="text-right">$90,000</td> <td class="text-right">$90,000</td> </tr> <tr> <td>Heart Lake</td> <td>Heart Lake WTP Repairs</td> <td>Infra Alloc</td> <td class="text-right">$90,400</td> <td class="text-right">$90,400</td> </tr> <tr> <td>Horse Lake</td> <td>WCTC Horse Lake Water Feasibility Study</td> <td>Gathering Strength</td> <td class="text-right">$200,000</td> <td class="text-right">$75,000</td> </tr> <tr> <td>Kehewin</td> <td>Kehewin Water Treatment Plant Feasibility Study</td> <td>Gathering Strength</td> <td class="text-right">$68,000</td> <td class="text-right">$68,000</td> </tr> <tr> <td>Kehewin</td> <td>Kehewin WTP Upgrades</td> <td>A-Base</td> <td class="text-right">$286,160</td> <td class="text-right">$134,798</td> </tr> <tr> <td>Little Red River Cree Nation</td> <td>LRRCN Fox Lake Water Interim Repairs</td> <td>Gathering Strength</td> <td class="text-right">$258,500</td> <td class="text-right">$188,500</td> </tr> <tr> <td>Loon River</td> <td>KTKN Loon River Joint Feasibility Study with MD</td> <td>Gathering Strength</td> <td class="text-right">$95,920</td> <td class="text-right">$95,920</td> </tr> <tr> <td>Loon River</td> <td>KTKN Loon River Sewer Extension</td> <td>A-Base</td> <td class="text-right">$31,548</td> <td class="text-right">$31,548</td> </tr> <tr> <td>Loon River</td> <td>KTKN Loon River WTP Truck Fill</td> <td>A-Base</td> <td class="text-right">$350,000</td> <td class="text-right">$150,000</td> </tr> <tr> <td>Louis Bull</td> <td>Louis Bull Water Hauling</td> <td>A-Base</td> <td class="text-right">$1,594,400</td> <td class="text-right">$120,000</td> </tr> <tr> <td>Montana</td> <td>Montana Water Feasibility Study</td> <td>Gathering Strength</td> <td class="text-right">$425,000</td> <td class="text-right">$75,000</td> </tr> <tr> <td>Montana</td> <td>Montana WTP Fire Pump</td> <td>A-Base</td> <td class="text-right">$25,000</td> <td class="text-right">$25,000</td> </tr> <tr> <td>Montana</td> <td>Montana WTP Upgrades</td> <td>Gathering Strength</td> <td class="text-right">$140,000</td> <td class="text-right">$136,500</td> </tr> <tr> <td>Paul</td> <td>Paul Vacuum Trucks</td> <td>A-Base</td> <td class="text-right">$200,000</td> <td class="text-right">$197,000</td> </tr> <tr> <td>Piikani</td> <td>Piikani Water Study</td> <td>Emerg Mgmt</td> <td class="text-right">$65,000</td> <td class="text-right">$30,000</td> </tr> <tr> <td>Saddle Lake</td> <td>Saddle Lake Core Area Water Pumphouse Repairs</td> <td>Gathering Strength</td> <td class="text-right">$166,000</td> <td class="text-right">$16,000</td> </tr> <tr> <td>Saddle Lake</td> <td>Saddle Lake Waste Water Repairs</td> <td>Gathering Strength</td> <td class="text-right">$2,073,411</td> <td class="text-right">$1,760,000</td> </tr> <tr> <td>Samson</td> <td>Samson Lagoon and Lift Station Repairs</td> <td>A-Base</td> <td class="text-right">$112,267</td> <td class="text-right">$112,267</td> </tr> <tr> <td>Stoney</td> <td>Stoney Morley Water Study</td> <td>Infra Alloc</td> <td class="text-right">$75,000</td> <td class="text-right">$75,000</td> </tr> <tr> <td>Stoney</td> <td>Stoney Vacuum Truck Purchase Flood Mitigation</td> <td>A-Base</td> <td class="text-right">$245,250</td> <td class="text-right">$49,050</td> </tr> <tr> <td>Stoney</td> <td>Stoney Water Leak Repairs</td> <td>Gathering Strength</td> <td class="text-right">$102,479</td> <td class="text-right">$102,479</td> </tr> <tr> <td>Stoney</td> <td>Stoney Water Truck Purchase Flood Mitigation</td> <td>A-Base</td> <td class="text-right">$193,210</td> <td class="text-right">$19,310</td> </tr> <tr> <td>Sturgeon Lake</td> <td>WCTC Sturgeon Lake Water Trucks</td> <td>A-Base</td> <td class="text-right">$366,461</td> <td class="text-right">$366,461</td> </tr> <tr> <td>Tallcree</td> <td>Tallcree (South) Water Treatment (Investment Opportunity)</td> <td>A-Base</td> <td class="text-right">$9,988,276</td> <td class="text-right">$4,142,553</td> </tr> <tr> <td>Tallcree</td> <td>Tallcree (South) Water Treatment (Investment Opportunity)</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$9,988,276</td> <td class="text-right">$3,574,755</td> </tr> <tr> <td>Tsuu T'ina</td> <td>Tsuu T'ina Lift Station Repairs</td> <td>A-Base</td> <td class="text-right">$204,555</td> <td class="text-right">$204,555</td> </tr> <tr> <td>Whitefish Lake #128</td> <td>Whitefish #128 Truck Fill Installation</td> <td>Gathering Strength</td> <td class="text-right">$100,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Whitefish Lake #128</td> <td>Whitefish Lake #128 Water Feasibility Study</td> <td>Gathering Strength</td> <td class="text-right">$50,000</td> <td class="text-right">$50,000</td> </tr> <tr> <td>Whitefish Lake #459</td> <td>KTKN WFL#459 Atigameg Wastewater Upgrades</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,398,620</td> <td class="text-right">$1,418,620</td> </tr> <tr> <td>Whitefish Lake #459</td> <td>KTKN WFL#459 Atigameg Wastewater Upgrades</td> <td>Gathering Strength</td> <td class="text-right">$2,398,620</td> <td class="text-right">$180,000</td> </tr> <tr> <td>Whitefish Lake #459</td> <td>KTKN Whitefish Atigameg #459 Water Hydro Geo Study</td> <td>Gathering Strength</td> <td class="text-right">$1,050,000</td> <td class="text-right">$150,000</td> </tr> <tr> <td>Whitefish Lake #459</td> <td>KTKN Whitefish Atikameg Waste Water Design</td> <td>Gathering Strength</td> <td class="text-right">$389,770</td> <td class="text-right">$43,148</td> </tr> <tr> <td>Woodland Cree Nation</td> <td>KTKN Marten Lake Water Truck</td> <td>A-Base</td> <td class="text-right">$194,400</td> <td class="text-right">$48,440</td> </tr> <tr> <td>Woodland Cree Nation</td> <td>KTKN Marten Lake Water Truck</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$194,400</td> <td class="text-right">$146,000</td> </tr> <tr> <td>First Nations (Alberta)Technical Services Advisory Group (TSAG)</td> <td>TSAG Purchase Trailer Mounted Emergency Services Pump</td> <td>Emerg Mgmt</td> <td class="text-right">$25,800</td> <td class="text-right">$25,800</td> </tr> </tbody> </table> </div> </section> <section> <h3>British Columbia (BC) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>?Akisq'Nuk First Nation</td> <td>Community Water Supply</td> <td>A-Base</td> <td class="text-right">$3,821,003</td> <td class="text-right">$27,000</td> </tr> <tr> <td>?Esdilagh First Nation</td> <td>Cat 1 - DWS Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,765,160</td> <td class="text-right">$88,334</td> </tr> <tr> <td>Carrier Chilcotin Tribal Council</td> <td>Ulkatcho Effluent Monitoring Program</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$385,620</td> <td class="text-right">$29,120</td> </tr> <tr> <td>Cowichan Tribes</td> <td>Club Road Sanitary Sewer</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$111,879</td> <td class="text-right">$111,879</td> </tr> <tr> <td>Dzawada'Enuxw First Nation</td> <td>Kingcome River Watershed Analysis</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$712,782</td> <td class="text-right">$33,522</td> </tr> <tr> <td>Fort Nelson First Nation</td> <td>Fort Nelson PRV #1 Replacement</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$142,545</td> <td class="text-right">$142,545</td> </tr> <tr> <td>Gitsegukla Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr>- Wastewater Treatment Assessment</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$909,198</td> <td class="text-right">$596,698</td> </tr> <tr> <td>Gwa'Sala-Nakwaxda'Xw Indian Band</td> <td>Watermain Extension and Looping</td> <td>A-Base</td> <td class="text-right">$949,539</td> <td class="text-right">$783,223</td> </tr> <tr> <td>Hagwilget Village</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Sewage Treatment</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,732,891</td> <td class="text-right">$61,032</td> </tr> <tr> <td>Haisla Nation</td> <td>Liftstation Remediation</td> <td>A-Base</td> <td class="text-right">$235,532</td> <td class="text-right">$229,532</td> </tr> <tr> <td>Halalt Indian Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> Community Waterworks System Halalt IR #2</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,977,668</td> <td class="text-right">$735,633</td> </tr> <tr> <td>Kitsumkalum Indian Band</td> <td>Lift Station Upgrade</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$205,088</td> <td class="text-right">$28,030</td> </tr> <tr> <td>Kwadacha Indian Band</td> <td>Water Distribution and Road Reconstruction</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$4,622,758</td> <td class="text-right">$300,134</td> </tr> <tr> <td>Little Shuswap Lake Indian Band</td> <td>Quaaout IR 1 Emergency Well Replacement</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$251,894</td> <td class="text-right">$35,248</td> </tr> <tr> <td>Lower Kootenay Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvements Creston I.R. #1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,383,930</td> <td class="text-right">$1,844,337</td> </tr> <tr> <td>Nazko First Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Supply &amp; Treatment IR#20</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$3,622,607</td> <td class="text-right">$233,139</td> </tr> <tr> <td>Okanagan Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvements Bradley Creek, Okanagan I.R. # 1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,759,449</td> <td class="text-right">$2,280,039</td> </tr> <tr> <td>Pacheedaht First Nation</td> <td>Water System Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$270,082</td> <td class="text-right">$244,040</td> </tr> <tr> <td>Quatsino Indian Band</td> <td>Sanitary Sewer <abbr title="roman numeral 1">I</abbr> &amp; <abbr title="roman numeral 1">I</abbr> Upgrade</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$725,678</td> <td class="text-right">$213,174</td> </tr> <tr> <td>Skidegate Indian Band</td> <td>WTP Intake Slide Repairs</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$162,204</td> <td class="text-right">$55,185</td> </tr> <tr> <td>Snuneymuxw First Nation</td> <td>IR#4 Sanitary Pump Station</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,732,231</td> <td class="text-right">$1,601,231</td> </tr> <tr> <td>Snuneymuxw First Nation</td> <td>Snuneymuxw IR4 water supply</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,132,727</td> <td class="text-right">$219,488</td> </tr> <tr> <td>Stswecem'C Xgat'Tem First Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Treatment and Storage Dog Creek I.R. # 1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,123,239</td> <td class="text-right">$104,222</td> </tr> <tr> <td>Tla-O-Qui-Aht First Nations</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> Sewer Forcemain IR #3 - Tofino</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,522,591</td> <td class="text-right">$21,035</td> </tr> <tr> <td>Tl'Etinqox Government</td> <td>Water Systems Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,600,000</td> <td class="text-right">$248,224</td> </tr> <tr> <td>Tsartlip Indian Band</td> <td>MTSA Sewer System Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,439,651</td> <td class="text-right">$1,054,536</td> </tr> <tr> <td>Tseshaht</td> <td>Santu Subdivision Extension - Tsahaheh IR#1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,232,943</td> <td class="text-right">$237,982</td> </tr> <tr> <td>Upper Nicola Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Well Water Assessment Nicola Lake I.R. #1</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$332,055</td> <td class="text-right">$2,200,000</td> </tr> <tr> <td>Westbank First Nation</td> <td>Coyote Crescent Sanitary Sewer IR#9</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$292,592</td> <td class="text-right">$257,023</td> </tr> <tr> <td>Whispering Pines/Clinton Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvement Whispering Pines I.R. #4</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,329,302</td> <td class="text-right">$1,183,353</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvement Williams Lake I.R. # 1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,241,320</td> <td class="text-right">$125,000</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Sugar Cane IR#1 Lagoon Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$214,280</td> <td class="text-right">$3,341</td> </tr> </tbody> </table> </div> </section> <section> <h3>Yukon (YK) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Liard First Nation</td> <td>2 Mile Water Treatment Plant Completion</td> <td>Gathering Strength</td> <td class="text-right">$2,372,000</td> <td class="text-right">$25,000</td> </tr> <tr> <td>Ross River Dena Council</td> <td>Septic Fields</td> <td>Gathering Strength</td> <td class="text-right">$30,495</td> <td class="text-right">$30,495</td> </tr> </tbody> </table> </div> </section> <section> <h3>Atlantic (AT) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Bear River</td> <td>Wastewater</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$451,500</td> <td class="text-right">$215,000</td> </tr> <tr> <td>Eel Ground FN</td> <td>Water System Improvements</td> <td>A-Base</td> <td class="text-right">$7,231,500</td> <td class="text-right">$800,000</td> </tr> <tr> <td>Elsipogtog FN</td> <td>Water Infrastructure Project</td> <td>A-Base</td> <td class="text-right">$4,480,000</td> <td class="text-right">$0</td> </tr> <tr> <td>Glooscap</td> <td>Water</td> <td>A-Base</td> <td class="text-right">$1,120,000</td> <td class="text-right">$45,500</td> </tr> <tr> <td>Pabineau</td> <td>Water Storage and System Upgrades</td> <td>Gathering Strength</td> <td class="text-right">$6,825,454</td> <td class="text-right">$1,154,354</td> </tr> <tr> <td>Shubenacadie</td> <td>Water <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$22,700</td> </tr> <tr> <td>Shubenacadie</td> <td>Water Systems</td> <td>A-Base</td> <td class="text-right">$754,373</td> <td class="text-right">$404,373</td> </tr> <tr> <td>Woodstock FN</td> <td>Wastewater Feasibility Study</td> <td>A-Base</td> <td class="text-right">$219,000</td> <td class="text-right">$93,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Québec (QC) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Cra</td> <td><span lang="fr">Formation des Premières Nations</span></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$335,200</td> <td class="text-right">$335,200</td> </tr> <tr> <td>Cree</td> <td>Cree RNF / <span lang="fr">Eau</span> - QA82</td> <td>RNF</td> <td class="text-right">$1,710,000</td> <td class="text-right">$1,710,000</td> </tr> <tr> <td>Cree</td> <td><span lang="fr">Stratégie Eau</span> - QM31</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,006,700</td> <td class="text-right">$1,006,700</td> </tr> <tr> <td><span lang="fr">Divers</span></td> <td><span lang="fr">Formation des Premières Nations / Soutien technique</span></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$178,434</td> <td class="text-right">$178,434</td> </tr> <tr> <td><span lang="fr">Divers</span></td> <td><span lang="fr">Mise au point de systèmes / Nettoyage de puits</span></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$436,679</td> <td class="text-right">$436,679</td> </tr> <tr> <td>Kanesatake</td> <td>Waste water system rehabilitation - QL40</td> <td>A-Base</td> <td class="text-right">$300,000</td> <td class="text-right">$150,000</td> </tr> <tr> <td>Kanesatake</td> <td>Water sytem rehabilitation - QL41</td> <td>A-Base</td> <td class="text-right">$300,000</td> <td class="text-right">$150,000</td> </tr> <tr> <td>Kitig.Zibi</td> <td>Water and sewer Infrastructure - QM29</td> <td>A-Base</td> <td class="text-right">$2,800,000</td> <td class="text-right">$185,295</td> </tr> <tr> <td><span lang="fr">Lac Simon</span></td> <td><span lang="fr">Développement rue Ogima</span> - QL95</td> <td>A-Base</td> <td class="text-right">$1,547,612</td> <td class="text-right">$430,000</td> </tr> <tr> <td>Mamit</td> <td><span lang="fr">Programme de formation itinérante</span></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,100,000</td> <td class="text-right">$1,100,000</td> </tr> <tr> <td>Mamuitun</td> <td><span lang="fr">Colloque des opérateurs</span></td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$139,730</td> <td class="text-right">$139,730</td> </tr> <tr> <td>Mamuitun</td> <td><span lang="fr">Formation continue</span></td> <td>A-Base / <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td class="text-right">$203,000</td> <td class="text-right">$203,000</td> </tr> <tr> <td>Natashquan</td> <td><span lang="fr">Réhabilitation des étangs aérés</span> - QC90</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,740,919</td> <td class="text-right">$2,282,902</td> </tr> <tr> <td>Natashquan</td> <td><span lang="fr">Réservoir eau potable</span> - QM30</td> <td>A-Base</td> <td class="text-right">$2,930,774</td> <td class="text-right">$71,783</td> </tr> <tr> <td>Pessamit</td> <td><span lang="fr">Alimentation et trait. Eau potable</span> - Phase 3 - QM21</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$14,107,710</td> <td class="text-right">$2,500,000</td> </tr> <tr> <td>Timiskaming</td> <td>Sludge treatment</td> <td>A-Base</td> <td class="text-right">$28,091</td> <td class="text-right">$28,091</td> </tr> <tr> <td>Wemotaci</td> <td><span lang="fr">Eau potable</span> - QM42</td> <td>A-Base</td> <td class="text-right">$252,577</td> <td class="text-right">$252,577</td> </tr> </tbody> </table> </div> </section> <section> <h3>Ontario (ON) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>0128 - Naicatchewenin Band</td> <td>NAICATCHEWENIN WATER TREATMENT PILOT STUDY #RJ6K</td> <td>A-Base</td> <td class="text-right">$91,814</td> <td class="text-right">$33,354</td> </tr> <tr> <td>0137 - Shawanaga First Nation</td> <td>SHAWANAGA 2012 WATER TREATMENT PLANT UPGRADES #RJLH</td> <td>A-Base</td> <td class="text-right">$2,222,500</td> <td class="text-right">$100,000</td> </tr> <tr> <td>0160 - Alderville First Nation</td> <td>CANADA-ONTARIO DRINKING WATER IMPROVEMENT INITIATIVE - ALDERVILLE #RJTA</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,358,326</td> <td class="text-right">$50,000</td> </tr> <tr> <td>0166 - Chippewas Of The Thames 1st Nation</td> <td>CHIPPEWAS OF THE THAMES WTP INTERIM UPGRADE #RJKD</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,829,792</td> <td class="text-right">$747,869</td> </tr> <tr> <td>0166 - Chippewas Of The Thames 1st Nation</td> <td>CHIPPEWAS OF THE THAMES WTP INTERIM UPGRADE #RJKD</td> <td>A-Base</td> <td class="text-right">$1,829,792</td> <td class="text-right">$82,400</td> </tr> <tr> <td>0168 - Munsee-Delaware First Nation</td> <td>CANADA-ONTARIO DRINKING WATER IMPROVEMENT INITIATIVE - MUNSEE DELAWARE #RJTC</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,670,000</td> <td class="text-right">$934,432</td> </tr> <tr> <td>0173 - Zhiibaahaasing First Nation</td> <td>CANADA-ONTARIO DRINKING WATER IMPROVEMENT INITIATIVE - ZHIIBAAHAASING #RJT9</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$73,516</td> <td class="text-right">$36,758</td> </tr> <tr> <td>0176 - Sheguiandah Band</td> <td>SHEGUIANDAH COMMUNICATIONS LINK INVESTIGATION #RJT0</td> <td>A-Base</td> <td class="text-right">$30,000</td> <td class="text-right">$6,000</td> </tr> <tr> <td>0195 - Pic Mobert Band</td> <td>NEW WATER TREATMENT PLANT #RFN7</td> <td>A-Base</td> <td class="text-right">$11,078,082</td> <td class="text-right">$495,300</td> </tr> <tr> <td>0201 - Serpent River Band</td> <td>SERPENT RIVER NEW WATER TREATMENT PLANT #RCA4</td> <td>A-Base</td> <td class="text-right">$12,630,000</td> <td class="text-right">$3,568,997</td> </tr> <tr> <td>0205 - <span lang="fr">Lac Seul</span> Band</td> <td>CANADA-ONTARIO DRINKING WATER IMPROVEMENT INITIATIVE - <span lang="fr">LAC SEUL</span> #RJTB</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$74,452</td> <td class="text-right">$9,720</td> </tr> <tr> <td>0205 - Lac Seul Band</td> <td>CANADA-ONTARIO DRINKING WATER IMPROVEMENT INITIATIVE - <span lang="fr">LAC SEUL</span> #RJTB</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,023,207</td> <td class="text-right">$570,877</td> </tr> <tr> <td>0235 - Obashkaandagaang</td> <td>OBASHKAANDAGAANG PUMPHOUSE REPAIRS</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$45,000</td> <td class="text-right">$40,000</td> </tr> <tr> <td>0240 - Webequie</td> <td>WEBEQUIE WTP/SEWAGE TREATMENT UPGRADE PROJECT</td> <td>A-Base</td> <td class="text-right">$12,759,467</td> <td class="text-right">$2,560</td> </tr> <tr> <td>0243 - Kashechewan Band</td> <td>WTP UPGRADE/FIRE PUMP BACKUP POWER - KASHECHEWAN</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,440,750</td> <td class="text-right">$50,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Manitoba (MB) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Black River</td> <td>S507 WTP and Lagoon Expansion</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$7,250,100</td> <td class="text-right">$3,729,300</td> </tr> <tr> <td>Bunibonibee</td> <td>S630 Lift Station Repair</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$89,400</td> <td class="text-right">$89,400</td> </tr> <tr> <td>Frontier Shool Division (Norway House)</td> <td>S621 Jack River School W/WW Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$4,057,644</td> <td class="text-right">$1,023,900</td> </tr> <tr> <td>Gods Lake</td> <td>S531 STP Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$10,671,200</td> <td class="text-right">$5,029,200</td> </tr> <tr> <td>Hollow Water</td> <td>S525 WTP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$8,584,353</td> <td class="text-right">$41,423</td> </tr> <tr> <td>Hollow Water</td> <td>S626 Lift Station Upgrades</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$363,850</td> <td class="text-right">$363,850</td> </tr> <tr> <td>Island Lake Tribal Council</td> <td>S619 Housing Plumbing Retrofits Phase <abbr title="roman numeral 3">III</abbr></td> <td>NCOF/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$13,933,012</td> <td class="text-right">$3,863,012</td> </tr> <tr> <td>Keewatin Tribal Council (Bunibonibee)</td> <td>S575 Housing Water and Sewer Retrofits Phase <abbr title="roman numeral 2">II</abbr></td> <td>NCOF</td> <td class="text-right">$4,669,000</td> <td class="text-right">$3,869,000</td> </tr> <tr> <td>Lake St Martin</td> <td>S435 W/WW Facility Upgrade</td> <td>FMC 40M</td> <td class="text-right">$24,876,489</td> <td class="text-right">$545,681</td> </tr> <tr> <td>Misipawistic (Grand Rapids)</td> <td>S601 Lagoon Upgrade</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$3,124,626</td> <td class="text-right">$1,663,102</td> </tr> <tr> <td>Skownan</td> <td>S504 WTP Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$3,737,625</td> <td class="text-right">$69,925</td> </tr> <tr> <td>West Region Tribal Council</td> <td>Annual Inspections</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$68,145</td> <td class="text-right">$68,145</td> </tr> <tr> <td>West Region Tribal Council</td> <td>Wastewater Monitoring</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td>&nbsp;</td> <td class="text-right">$134,868</td> </tr> <tr> <td>York Factory</td> <td>S634 WTP Repair</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$788,555</td> <td class="text-right">$536,924</td> </tr> </tbody> </table> </div> </section> <section> <h3>Saskatchewan (SK) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Canoe Lake</td> <td>Eagles lake Lagoon Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,727,000</td> <td class="text-right">$50,000</td> </tr> <tr> <td>Canoe Lake</td> <td>Eagles Lake WTP Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$750,000</td> <td class="text-right">$400,000</td> </tr> <tr> <td>Carry the Kettle</td> <td>Lagoon Expansion</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$773,000</td> <td class="text-right">$21,000</td> </tr> <tr> <td>Cote</td> <td>Water System Recharge</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,275,000</td> <td class="text-right">$197,000</td> </tr> <tr> <td>Cumberland House</td> <td>Pemmican Portage Lagoon</td> <td>A-Base</td> <td class="text-right">$2,113,700</td> <td class="text-right">$64,800</td> </tr> <tr> <td>Hatchet Lake</td> <td>Water and Sewer Study</td> <td>A-Base</td> <td class="text-right">$182,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>James Smith</td> <td>Water Treatment Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$7,173,000</td> <td class="text-right">$2,539,000</td> </tr> <tr> <td>Kinistin</td> <td>SPS Upgrades</td> <td>A-Base</td> <td class="text-right">$15,200</td> <td class="text-right">$15,200</td> </tr> <tr> <td><span lang="fr">Lac La Ronge</span></td> <td>Stanley Mission THM WTP Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,610,000</td> <td class="text-right">$431,200</td> </tr> <tr> <td><span lang="fr">Lac La Ronge</span></td> <td>Sucker River Lagoon Expansion</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,075,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Makwa Sahgaiehcan</td> <td>Water Treatment Plant Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,315,600</td> <td class="text-right">$1,000,000</td> </tr> <tr> <td>Ministikwan Lake</td> <td>Mudie Lake WTP Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$750,000</td> <td class="text-right">$50,000</td> </tr> <tr> <td>Montreal Lake</td> <td>Lagoon Study</td> <td>A-Base</td> <td class="text-right">$30,000</td> <td class="text-right">$30,000</td> </tr> <tr> <td>Moosomin</td> <td>Water Treatment Plant Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,390,000</td> <td class="text-right">$2,308,500</td> </tr> <tr> <td>Mosquito</td> <td>Core Area Drainage</td> <td>A-Base</td> <td class="text-right">$125,000</td> <td class="text-right">$105,000</td> </tr> <tr> <td>Muskoday</td> <td>Water Supply Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,141,500</td> <td class="text-right">$12,500</td> </tr> <tr> <td>Muskowekwan</td> <td>New Lagoon</td> <td>A-Base</td> <td class="text-right">$3,075,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Pasqua</td> <td>Community Lagoon Expansion</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,000,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Peter Ballantyne</td> <td>Pelican Narrows WTP</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,370,000</td> <td class="text-right">$120,000</td> </tr> <tr> <td>Peter Ballantyne</td> <td>Sandy Bay Sewage Pumping Station Upgrades</td> <td>A-Base</td> <td class="text-right">$3,750,000</td> <td class="text-right">$1,000,000</td> </tr> <tr> <td>Red Earth</td> <td>Lagoon Repairs</td> <td>A-Base</td> <td class="text-right">$230,000</td> <td class="text-right">$230,000</td> </tr> <tr> <td>Red Earth</td> <td>Water Supply Study</td> <td>A-Base</td> <td class="text-right">$6,342,000</td> <td class="text-right">$50,000</td> </tr> <tr> <td>Shoal Lake</td> <td>WTP Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,100,500</td> <td class="text-right">$520,000</td> </tr> <tr> <td>Sturgeon Lake</td> <td>WTP Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,000,000</td> <td class="text-right">$150,000</td> </tr> <tr> <td>White Bear</td> <td>WTP Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$4,620,000</td> <td class="text-right">$300,000</td> </tr> <tr> <td>Witchekan Lake</td> <td>Sewage Lagoon Expansion</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,225,000</td> <td class="text-right">$200,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Alberta (AB) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Beaver Lake</td> <td>Beaver Lake Water Hauling</td> <td>A-Base</td> <td class="text-right">$50,447</td> <td class="text-right">$32,483</td> </tr> <tr> <td>Dene Tha'</td> <td>Dene Tha' Meander River Water Design</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$455,000</td> <td class="text-right">$330,000</td> </tr> <tr> <td>Dene Tha'</td> <td>Dene Tha' Meander River Water Design</td> <td>Gathering Strength</td> <td class="text-right">$455,000</td> <td class="text-right">$25,000</td> </tr> <tr> <td>Little Red River Cree Nation</td> <td>LRRCN JDP WTP Design &amp; Construction</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,672,414</td> <td class="text-right">$340,000</td> </tr> <tr> <td>Little Red River Cree Nation</td> <td>LRRCN JDP WTP Design &amp; Construction</td> <td>Gathering Strength</td> <td class="text-right">$2,672,414</td> <td class="text-right">$20,000</td> </tr> <tr> <td>North Peace Tribal Council</td> <td>NPTC Northern Alberta WTP Bundled Projects</td> <td>A-Base</td> <td class="text-right">$1,411,765</td> <td class="text-right">$443,965</td> </tr> <tr> <td>North Peace Tribal Council</td> <td>NPTC Northern Alberta WTP Bundled Projects</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,411,765</td> <td class="text-right">$376,300</td> </tr> <tr> <td>North Peace Tribal Council</td> <td>NPTC Northern Alberta WTP Bundled Projects</td> <td>Gathering Strength</td> <td class="text-right">$1,411,765</td> <td class="text-right">$91,500</td> </tr> <tr> <td>Paul</td> <td>Paul Water &amp; Wastewater Design</td> <td>Gathering Strength</td> <td class="text-right">$3,000,000</td> <td class="text-right">$300,000</td> </tr> <tr> <td>&nbsp;</td> <td>TSAG FN Comprehensive Water Strategy</td> <td>A-Base</td> <td class="text-right">$200,000</td> <td class="text-right">$200,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>British Columbia (BC) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>?Akisq'Nuk First Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr>-DWS COLUMBIA LAKE IR#3 NORTH COMMUNITY</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$225,044</td> <td class="text-right">$110,000</td> </tr> <tr> <td>Adams Lake Indian Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> WATER SUPPLY &amp; TREATMENT - SAHHLTKUM IR#4</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,250,000</td> <td class="text-right">$190,000</td> </tr> <tr> <td>Alexis Creek Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> IR 1 Water System Upgrades</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,550,000</td> <td class="text-right">$29,130</td> </tr> <tr> <td>Blueberry River First Nations</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Water System Upgrades</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$800,000</td> <td class="text-right">$173,008</td> </tr> <tr> <td>Bonaparte Indian Band</td> <td>DWS Upgrading Bonaparte IR#3</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$4,059,126</td> <td class="text-right">$397,179</td> </tr> <tr> <td>Boothroyd Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Upgrading Kahmoose I.R. # 4</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,289,427</td> <td class="text-right">$1,648,467</td> </tr> <tr> <td>Bridge River Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Supply/Treatment Improvement Bridge River IR #1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,931,302</td> <td class="text-right">$520,051</td> </tr> <tr> <td>Canim Lake Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvements East and West Community</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,029,565</td> <td class="text-right">$48,575</td> </tr> <tr> <td>Cayoose Creek Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Well Investigation/Installation Cayoose Creek I.R. #1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,454,390</td> <td class="text-right">$109,045</td> </tr> <tr> <td>Cheam Indian Band</td> <td>Water Systems Upgrade</td> <td>A-Base</td> <td class="text-right">$2,008,789</td> <td class="text-right">$115,097</td> </tr> <tr> <td>Cowichan Tribes</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Wilson Road Community Water System Cowichan IR #1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,510,534</td> <td class="text-right">$159,613</td> </tr> <tr> <td>Doig River First Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvements Doig River I.R. # 206</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,687,813</td> <td class="text-right">$45,963</td> </tr> <tr> <td>Esk'Etemc</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvements Alkali Lake I.R. #1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$3,542,182</td> <td class="text-right">$94,399</td> </tr> <tr> <td>Halalt Indian Band</td> <td>Sewer Collection &amp; Disposal Halalt IR #2</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,870,763</td> <td class="text-right">$9,380</td> </tr> <tr> <td>Halfway River First Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Treatment Facility Halfway River I.R. # 168</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,614,796</td> <td class="text-right">$88,645</td> </tr> <tr> <td>Kitselas Indian Band</td> <td>Water System Upgrade - Gitaus IR <abbr title="number">no.</abbr>1</td> <td>A-Base</td> <td class="text-right">$4,196,098</td> <td class="text-right">$602,088</td> </tr> <tr> <td>Klahoose First Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Water Supply Assessment/Hydrogeotechnical Study</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,950,000</td> <td class="text-right">$94,886</td> </tr> <tr> <td>Kwikwasut'Inuxw Haxwa'Mis</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> Water Treatment Plant Upgrades</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,231,869</td> <td class="text-right">$347,817</td> </tr> <tr> <td>Lake Babine Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Improvements to Wastewater System Babine I.R. #6</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,344,426</td> <td class="text-right">$50,000</td> </tr> <tr> <td>Lhoosk'Uz Dene Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Domestic Water Supply Improvements - Kluskus I.R. # 1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,649,050</td> <td class="text-right">$89,050</td> </tr> <tr> <td>Lhoosk'Uz Dene Nation</td> <td>Sewage Disposal System Upgrade IR#1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$500,000</td> <td class="text-right">$27,665</td> </tr> <tr> <td>Lhtako Dene Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvement Quesnel I.R. #1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,597,400</td> <td class="text-right">$17,938</td> </tr> <tr> <td>Little Shuswap Lake Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvements Quaaout IR #1 &amp; North Bay IR #5</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$5,291,285</td> <td class="text-right">$249,923</td> </tr> <tr> <td>Lower Similkameen Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Water System Ashnola IR #10</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,657,289</td> <td class="text-right">$309,622</td> </tr> <tr> <td>Lower Stl'Atl'Imx Tribal Council</td> <td>Community Wastewater Disposal System - Skatin</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,022,000</td> <td class="text-right">$40,755</td> </tr> <tr> <td>Lytton Indian Band</td> <td>Stein Intake Backwash System</td> <td>A-Base</td> <td class="text-right">$463,272</td> <td class="text-right">$88,624</td> </tr> <tr> <td>Metlakatla Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Sewage Treatment and Disposal Facility</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$9,346,648</td> <td class="text-right">$378,346</td> </tr> <tr> <td>Musqueam Indian Band</td> <td>AC Watermain Pipe Replacement</td> <td>A-Base</td> <td class="text-right">$842,955</td> <td class="text-right">$734,729</td> </tr> <tr> <td>Nadleh Whut'En Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> North Shore Sewer System Study</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,242,861</td> <td class="text-right">$75,000</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> Liquid Waste Disposal</td> <td>A-Base</td> <td class="text-right">$859,686</td> <td class="text-right">$160,437</td> </tr> <tr> <td>Osoyoos Indian Band</td> <td>Osoyoos IR #1 Domestic Water System Improvements</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$3,862,640</td> <td class="text-right">$263,015</td> </tr> <tr> <td>Prophet River First Nation</td> <td>Domestic Water Source / Treatment Assessment</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$183,959</td> <td class="text-right">$93,959</td> </tr> <tr> <td>Samahquam Indian Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> DWS Improvements</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,462,407</td> <td class="text-right">$294,047</td> </tr> <tr> <td>Saulteau First Nations</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvements East Moberly I.R. #169</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$4,707,071</td> <td class="text-right">$34,400</td> </tr> <tr> <td>Siska Indian Band</td> <td>Water Supply Improvements IR#5/5B</td> <td>A-Base</td> <td class="text-right">$109,506</td> <td class="text-right">$75,230</td> </tr> <tr> <td>Skatin Nations</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> - Skatine Water System Improvements</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$300,000</td> <td class="text-right">$55,035</td> </tr> <tr> <td>Skidegate Indian Band</td> <td>Skarkedus Lake Dam Assessment and Major Maintenance</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,465,916</td> <td class="text-right">$98,475</td> </tr> <tr> <td>Sliammon Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr>- Wastewater Treatment/ Disposal System</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$10,285,019</td> <td class="text-right">$321,597</td> </tr> <tr> <td>Snuneymuxw First Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr>- Nanaimo River 2,3&amp;4 Sewage Disposal &amp; Subdivision</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$791,973</td> <td class="text-right">$78,606</td> </tr> <tr> <td>Splatsin</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> - Enderby IR#2 Jackpine &amp; Canyon</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,045,632</td> <td class="text-right">$246,905</td> </tr> <tr> <td>Spuzzum Indian Band</td> <td>Inkawathia and Skemis Water Intake Upgrades</td> <td>A-Base</td> <td class="text-right">$454,448</td> <td class="text-right">$104,042</td> </tr> <tr> <td>Spuzzum Indian Band</td> <td>Spuzzum IR#1 Slope Stabilization and Drainage</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$56,045</td> <td class="text-right">$51,045</td> </tr> <tr> <td>St. Mary'S Indian Band</td> <td>Water Reservoir Replacement St. Mary's IR #1A</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,583,587</td> <td class="text-right">$770,000</td> </tr> <tr> <td>Stz'Uminus First Nation</td> <td>Emergency Water Supply IR 13</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$681,799</td> <td class="text-right">$320,580</td> </tr> <tr> <td>Stz'Uminus First Nation</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> Long Term Water Supply - Ladysmith Connection</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$203,390</td> <td class="text-right">$203,390</td> </tr> <tr> <td>T'It'Q'Et</td> <td>McCartney's Flat Water Supply Study</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$47,036</td> <td class="text-right">$29,992</td> </tr> <tr> <td>T'It'Q'Et</td> <td>Water System Improvements</td> <td>A-Base</td> <td class="text-right">$573,113</td> <td class="text-right">$216,772</td> </tr> <tr> <td>Toosey Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvements Toosey I.R. # 1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$3,714,500</td> <td class="text-right">$177,900</td> </tr> <tr> <td>Toquaht Indian Band</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr> Water Treatment &amp; System Upgrades</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,227,822</td> <td class="text-right">$106,337</td> </tr> <tr> <td>Tsawout First Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> - Water and Sewer Servicing Feasibility -569 Semiahmoo</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$55,982</td> <td class="text-right">$9,351</td> </tr> <tr> <td>Ts'Kw'Aylaxw First Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvements Pavilion I.R. #1 Marble Canyon IR#3</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,224,067</td> <td class="text-right">$245,000</td> </tr> <tr> <td>Uchucklesaht Indian Band</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Water System Upgrade - Elhlatese IR #2</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,829,320</td> <td class="text-right">$40,000</td> </tr> <tr> <td>Ucluelet First Nation</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr>- DWS Upgrade</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$3,912,063</td> <td class="text-right">$3,599,143</td> </tr> <tr> <td>West Moberly First Nations</td> <td>Water Treatment Plant Upgrade</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$4,326,000</td> <td class="text-right">$87,000</td> </tr> <tr> <td>Xaxli'P Indian Band</td> <td>PRV Station Upgrade Xaxli'p IR #1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$77,654</td> <td class="text-right">$5,475</td> </tr> <tr> <td>Xeni Gwet'In First Nations Government</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> DWS Improvement Lohbihee I.R. # 3</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$2,264,000</td> <td class="text-right">$112,840</td> </tr> <tr> <td>Xeni Gwet'In First Nations Government</td> <td>Septic Waste Disposal System</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$81,000</td> <td class="text-right">$81,000</td> </tr> <tr> <td>Yunesit'In Government</td> <td><abbr title="First Nations Water Management Strategy">FNWMS</abbr> Sewage Lagoons Upgrade Stone I.R. # 1</td> <td>A-base/<abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,217,996</td> <td class="text-right">$72,158</td> </tr> </tbody> </table> </div> </section> <section> <h3>Yukon (YK) &ndash; <abbr title="Water & Wastsewater">W&amp;WW</abbr> Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Daylu Dena Council</td> <td>WTP Pre-Design/Design</td> <td>Gathering Strength</td> <td class="text-right">$2,853,625</td> <td class="text-right">$77,000</td> </tr> <tr> <td>Dease River</td> <td>Water Line Extension &amp; reservoir</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr></td> <td class="text-right">$1,877,635</td> <td class="text-right">$473,113</td> </tr> <tr> <td>Liard First Nation</td> <td>Cluster Well Upgrades</td> <td>Gathering Strength</td> <td class="text-right">$615,300</td> <td class="text-right">$146,000</td> </tr> </tbody> </table> </div> </section> </section> <!-- ANNEX A END --> <!-- ANNEX B START --> <section> <div class="clearfix">&nbsp;</div> <h2 id="a39" class="mrgn-tp-md">ANNEX B: 99 School Projects (April&nbsp;1,&nbsp;2013 to March&nbsp;31,&nbsp;2014)</h2> <section> <h3>Atlantic (AT) - School Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Kingsclear <abbr title="First Nation">FN</abbr></td> <td>School Deficiences</td> <td>A-Base</td> <td class="text-right">$27,840</td> <td class="text-right">$27,840</td> </tr> <tr> <td>St Mary's <abbr title="First Nation">FN</abbr></td> <td>School Deficiences</td> <td>A-Base</td> <td class="text-right">$38,526</td> <td class="text-right">$11,110</td> </tr> </tbody> </table> </div> </section> <section> <h3>Québec (QC) - School Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td><span lang="fr">Lac Simon</span></td> <td><span lang="fr">Rénovation - École secondaire</span></td> <td>A-Base</td> <td class="text-right">$182,403</td> <td class="text-right">$182,403</td> </tr> <tr> <td>Long Point</td> <td><span lang="fr">Revue architecturale</span></td> <td>A-Base</td> <td class="text-right">$30,855</td> <td class="text-right">$30,855</td> </tr> <tr> <td>Manawan</td> <td><span lang="fr">École primaire - Rénovation</span></td> <td>A-Base</td> <td class="text-right">$1,448,663</td> <td class="text-right">$1,100,511</td> </tr> <tr> <td>Opitciwan</td> <td><span lang="fr">École - Réhabilitation</span> - QM46</td> <td>A-Base</td> <td class="text-right">$1,120,800</td> <td class="text-right">$822,391</td> </tr> </tbody> </table> </div> </section> <section> <h3>Ontario (ON) - School Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>0121 - Six Nations Of The Grand River</td> <td>BOILERS REPLACEMENT - EMILY C GENERAL SCHOOL #RJRQ</td> <td>A-Base</td> <td class="text-right">$47,831</td> <td class="text-right">$47,831</td> </tr> <tr> <td>0122 - Chippewas Of Nawash First Nation</td> <td>New School Project #RF98</td> <td>A-Base</td> <td class="text-right">$8,507,460</td> <td class="text-right">$3,748,441</td> </tr> <tr> <td>0143 - Attawapiskat Band</td> <td>ATTAWAPISKAT SCHOOL FURNISHINGS #RJRK</td> <td>A-Base</td> <td class="text-right">$900,000</td> <td class="text-right">$900,000</td> </tr> <tr> <td>0164 - Mohawks Of The Bay Of Quinte</td> <td>QUINTE MOHAWK SCHOOL HEALTH AND SAFETY DEFICIENCIES #RKOC</td> <td>A-Base</td> <td class="text-right">$34,325</td> <td class="text-right">$34,325</td> </tr> <tr> <td>0164 - Mohawks Of The Bay Of Quinte</td> <td>QUINTE MOHAWK SCHOOL INTERNET CONNECTIVITY UPGRADES PROJECT #RJRU</td> <td>A-Base</td> <td class="text-right">$81,850</td> <td class="text-right">$81,850</td> </tr> <tr> <td>0169 - Oneida Nation Of The Thames</td> <td>STANDING STONE SCHOOL ROOF SECTION&nbsp;F REPAIRS/REPLACEMENT #RJ23</td> <td>A-Base</td> <td class="text-right">$237,714</td> <td class="text-right">$231,064</td> </tr> <tr> <td>0208 - Pikangikum Band</td> <td>PIKANGIKUM SCHOOL BUS REPLACEMENT #RJRS</td> <td>A-Base</td> <td class="text-right">$367,770</td> <td class="text-right">$367,770</td> </tr> <tr> <td>0208 - Pikangikum Band</td> <td>PIKANGIKUM TEACHERAGE MOULD REMEDIATION #RJJR</td> <td>A-Base</td> <td class="text-right">$494,535</td> <td class="text-right">$16,718</td> </tr> <tr> <td>0208 - Pikangikum Band</td> <td>SCHOOL CAPITAL PLANNING STUDY #RA78</td> <td>Budget 2012 Schools</td> <td class="text-right">$499,086</td> <td class="text-right">$98,886</td> </tr> <tr> <td>0215 - Fort Severn Band</td> <td>FORT SEVERN FIRST NATION - SCHOOL CAPITAL PLANNING STUDY</td> <td>Budget 2012 Schools</td> <td class="text-right">$170,342</td> <td class="text-right">$77,342</td> </tr> <tr> <td>0216 - Cat Lake Band</td> <td>NEW SCHOOL</td> <td>A-Base</td> <td class="text-right">$15,889,801</td> <td class="text-right">$3,608,196</td> </tr> </tbody> </table> </div> </section> <section> <h3>Manitoba (MB) - School Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Dauphin River</td> <td>S583 Portable Classroom 2011 Flood</td> <td>FMC 40M</td> <td class="text-right">$825,000</td> <td class="text-right">$325,000</td> </tr> <tr> <td>Lake St Martin</td> <td>S109 School Feasibility Study</td> <td>FMC 40M</td> <td class="text-right">$27,176,265</td> <td class="text-right">$86,040</td> </tr> </tbody> </table> </div> </section> <section> <h3>Saskatchewan (SK) - School Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Clearwater River</td> <td>School Boiler Replacement</td> <td>A-Base</td> <td class="text-right">$393,000</td> <td class="text-right">$393,000</td> </tr> <tr> <td>Fishing Lake</td> <td>Portable Classrooms</td> <td>A-Base</td> <td class="text-right">$1,280,000</td> <td class="text-right">$455,000</td> </tr> <tr> <td>Muscowpetung</td> <td>School Roof Repairs</td> <td>A-Base</td> <td class="text-right">$922,900</td> <td class="text-right">$366,900</td> </tr> <tr> <td>Onion Lake</td> <td>Eagleview High School Roof Replacement</td> <td>A-Base</td> <td class="text-right">$2,905,000</td> <td class="text-right">$2,770,000</td> </tr> <tr> <td>Piapot</td> <td>School Boiler Replacement</td> <td>A-Base</td> <td class="text-right">$847,600</td> <td class="text-right">$847,600</td> </tr> <tr> <td>Shoal Lake</td> <td>School Mechanical System Upgrades</td> <td>A-Base</td> <td class="text-right">$680,000</td> <td class="text-right">$82,000</td> </tr> <tr> <td>White Bear</td> <td>School Fire Alarm Repairs</td> <td>A-Base</td> <td class="text-right">$113,500</td> <td class="text-right">$60,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Alberta (AB) - School Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Alexander</td> <td>Alexander School Upgrades</td> <td>A-Base</td> <td class="text-right">$189,224</td> <td class="text-right">$165,500</td> </tr> <tr> <td>Alexis</td> <td>Alexis School Security System</td> <td>A-Base</td> <td class="text-right">$31,116</td> <td class="text-right">$31,116</td> </tr> <tr> <td>Beaver Lake</td> <td>Beaver Lake School Pest Control</td> <td>A-Base</td> <td class="text-right">$30,000</td> <td class="text-right">$30,000</td> </tr> <tr> <td>Beaver Lake</td> <td>Beaver Lake School Upgrades</td> <td>A-Base</td> <td class="text-right">$1,167,620</td> <td class="text-right">$350,000</td> </tr> <tr> <td>Blood</td> <td>Blood Aahsaopi School Boiler Replacement</td> <td>A-Base</td> <td class="text-right">$80,000</td> <td class="text-right">$80,000</td> </tr> <tr> <td>Blood</td> <td>Blood Saipoyi School Expansion</td> <td>Budget 2012 Schools</td> <td class="text-right">$1,390,000</td> <td class="text-right">$1,390,000</td> </tr> <tr> <td>Cold Lake</td> <td>Cold Lake School Roof Repairs</td> <td>A-Base</td> <td class="text-right">$135,000</td> <td class="text-right">$135,000</td> </tr> <tr> <td>Dene Tha'</td> <td>Dene Tha' School Boilers</td> <td>A-Base</td> <td class="text-right">$16,749</td> <td class="text-right">$16,749</td> </tr> <tr> <td>Enoch</td> <td>Enoch School Gym Divider</td> <td>A-Base</td> <td class="text-right">$16,000</td> <td class="text-right">$16,000</td> </tr> <tr> <td>Heart Lake</td> <td>Heart Lake School Pest Control</td> <td>A-Base</td> <td class="text-right">$30,000</td> <td class="text-right">$30,000</td> </tr> <tr> <td>Kehewin</td> <td>Kehewin School Upgrades</td> <td>A-Base</td> <td class="text-right">$300,000</td> <td class="text-right">$300,000</td> </tr> <tr> <td>Kehewin</td> <td>Kehewin School Emergency Repairs</td> <td>Emerg Mgmt</td> <td class="text-right">$39,300</td> <td class="text-right">$39,300</td> </tr> <tr> <td>Lubicon Lake Band</td> <td>KTKN Lubicon School Modulars</td> <td>A-Base</td> <td class="text-right">$1,422,884</td> <td class="text-right">$1,422,884</td> </tr> <tr> <td>Montana</td> <td>Montana School Boilers</td> <td>A-Base</td> <td class="text-right">$47,967</td> <td class="text-right">$47,967</td> </tr> <tr> <td>Paul</td> <td>Paul School Kitchen Renovation</td> <td>A-Base</td> <td class="text-right">$100,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Piikani</td> <td>Peigan Board of Educ Cafeteria Upgrades</td> <td>A-Base</td> <td class="text-right">$60,000</td> <td class="text-right">$60,000</td> </tr> <tr> <td>Saddle Lake</td> <td>Saddle Lake Elementary Mechanical Upgrade</td> <td>A-Base</td> <td class="text-right">$200,000</td> <td class="text-right">$200,000</td> </tr> <tr> <td>Samson</td> <td>Samson Pigeon Lake NEA School Connectivity</td> <td>A-Base</td> <td class="text-right">$76,500</td> <td class="text-right">$76,500</td> </tr> <tr> <td>Stoney</td> <td>Information technology fit ups - Morely New Primary School</td> <td>A-Base</td> <td class="text-right">$28,450</td> <td class="text-right">$28,450</td> </tr> <tr> <td>Sturgeon Lake</td> <td>WCTC Sturgeon Lake School Boiler Repairs</td> <td>A-Base</td> <td class="text-right">$410,000</td> <td class="text-right">$410,000</td> </tr> <tr> <td>Sturgeon Lake</td> <td>WCTC Sturgeon Lake Roof Repairs</td> <td>A-Base</td> <td class="text-right">$434,560</td> <td class="text-right">$54,560</td> </tr> <tr> <td>Tallcree</td> <td>South Tallcree School Feasibility Study</td> <td>A-Base</td> <td class="text-right">$100,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Tsuu T'ina</td> <td>Tsuu T'ina School Upgrades</td> <td>A-Base</td> <td class="text-right">$157,883</td> <td class="text-right">$157,883</td> </tr> <tr> <td>Whitefish Lake #128</td> <td>WFL#128 School Structural Repairs</td> <td>A-Base</td> <td class="text-right">$150,000</td> <td class="text-right">$150,000</td> </tr> <tr> <td>Woodland Cree Nation</td> <td>KTKN Woodland Cadotte Lake School Roof Replacement</td> <td>A-Base</td> <td class="text-right">$913,240</td> <td class="text-right">$153,335</td> </tr> <tr> <td>&nbsp;</td> <td>Maskwachees Cultural College Roof Replacement</td> <td>A-Base</td> <td class="text-right">$294,662</td> <td class="text-right">$294,662</td> </tr> </tbody> </table> </div> </section> <section> <h3>British Columbia (BC) - School Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Ahousaht Indian Band</td> <td>School Renovation Project</td> <td>A-Base</td> <td class="text-right">$1,093,536</td> <td class="text-right">$71,000</td> </tr> <tr> <td>Ahousaht Indian Band</td> <td>Maaqtusiis School - Ahousaht</td> <td>A-Base</td> <td class="text-right">$13,466,940</td> <td class="text-right">$107,000</td> </tr> <tr> <td>Gitanyow Indian Band</td> <td>Gitanyow School Exterior Renovations</td> <td>A-Base</td> <td class="text-right">$80,000</td> <td class="text-right">$80,000</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Heiltsuk School Major Renovations</td> <td>A-Base</td> <td class="text-right">$7,476,445</td> <td class="text-right">$951,405</td> </tr> <tr> <td>Iskut Indian Band</td> <td>Klappan School Heating Upgrade</td> <td>A-Base</td> <td class="text-right">$445,344</td> <td class="text-right">$374,024</td> </tr> <tr> <td>Stz'Uminus First Nation</td> <td>School - Replace Stu&quot;ate lelum Secondary</td> <td>A-Base</td> <td class="text-right">$10,580,266</td> <td class="text-right">$11,472</td> </tr> <tr> <td>Tl'Azt'En Nation</td> <td>Eugene Joseph School Boiler Retrofit</td> <td>A-Base</td> <td class="text-right">$82,738</td> <td class="text-right">$82,738</td> </tr> </tbody> </table> </div> </section> <section> <h3>Atlantic (AT) - School Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Eel Ground <abbr title="First Nation">FN</abbr></td> <td>School Construction</td> <td>Budget 2012 Schools</td> <td class="text-right">$9,020,000</td> <td class="text-right">$3,750,000</td> </tr> <tr> <td>Elsipogtog <abbr title="First Nation">FN</abbr></td> <td>School Deficiences</td> <td>A-Base</td> <td class="text-right">$745,580</td> <td class="text-right">$73,871</td> </tr> </tbody> </table> </div> </section> <section> <h3>Québec (QC) - School Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Wemotaci</td> <td><span lang="fr">École Seskitin - Rénovation et agrandissement</span> - QL73</td> <td>A-Base</td> <td class="text-right">$8,200,000</td> <td class="text-right">$734,470</td> </tr> </tbody> </table> </div> </section> <section> <h3>Ontario (ON) - School Projects in Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>0143 - Attawapiskat Band</td> <td>Attawapiskat Vezina Secondary School Flood Restoration #Rjsy/Rjsw</td> <td>A-Base</td> <td class="text-right">$949,704</td> <td class="text-right">$411,704</td> </tr> <tr> <td>0143 - Attawapiskat Band</td> <td>Attawapiskat School (Elementary)</td> <td>Budget 2012 Schools</td> <td class="text-right">$31,116,050</td> <td class="text-right">$8,386,280</td> </tr> <tr> <td>0205 - <span lang="fr">Lac Seul</span> Band</td> <td><span lang="fr">Lac Seul</span>-Frenchman's Head School #Red7</td> <td>A-Base</td> <td class="text-right">$7,068,707</td> <td class="text-right">$120,000</td> </tr> <tr> <td>0208 - Pikangikum Band</td> <td>New School Project #Rjrn</td> <td>Budget 2012 Schools</td> <td class="text-right">$66,405,942</td> <td class="text-right">$326,679</td> </tr> <tr> <td>0211 - Sandy Lake Band</td> <td>Sandy Lake Elementary School Fire Rehabilitation and Repairs Project</td> <td>A-Base</td> <td class="text-right">$4,044,256</td> <td class="text-right">$3,034,549</td> </tr> <tr> <td>0213 - Muskrat Dam Lake Band</td> <td>Muskrat Dam Samson Beardy Memorial School Water Damage Tear Out</td> <td>A-Base</td> <td class="text-right">$387,495</td> <td class="text-right">$354,252</td> </tr> <tr> <td>0216 - Cat Lake Band</td> <td>School Servicing</td> <td>A-Base</td> <td class="text-right">$6,599,667</td> <td class="text-right">$196,734</td> </tr> <tr> <td>0238 - North Spirit Lake Band</td> <td>North Spirit Lk. <abbr title="First Nation">F.N.</abbr> - School Project</td> <td>A-Base</td> <td class="text-right">$15,964,900</td> <td class="text-right">$124,072</td> </tr> <tr> <td>1003 - Keewaytinook Okimakanak Tribl Council</td> <td>New Schools Project - Fort Severn Poplar Hill First Nations</td> <td>Budget 2012 Schools</td> <td class="text-right">$45,577,454</td> <td class="text-right">$445,821</td> </tr> </tbody> </table> </div> </section> <section> <h3>Manitoba (MB) - School Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Manto Sipi Cree Nation</td> <td>S600 School Bundling</td> <td>Budget 2012 Schools</td> <td class="text-right">$522,475</td> <td class="text-right">$150,000</td> </tr> <tr> <td>Shamattawa</td> <td>S530 New School</td> <td>Budget 2012 Schools</td> <td class="text-right">$38,990,500</td> <td class="text-right">$11,584,600</td> </tr> <tr> <td>St Theresa <abbr title="Point">Pt</abbr></td> <td>S298 School (sprinklers)</td> <td>Gathering Strength</td> <td class="text-right">$38,856,629</td> <td class="text-right">$300,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Saskatchewan (SK) - School Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Big River</td> <td>High School Repairs</td> <td>A-Base</td> <td class="text-right">$75,000</td> <td class="text-right">$75,000</td> </tr> <tr> <td>Birch Narrows</td> <td>School Back-up Generator</td> <td>A-Base</td> <td class="text-right">$60,000</td> <td class="text-right">$60,000</td> </tr> <tr> <td>Black Lake</td> <td>School Portables</td> <td>A-Base</td> <td class="text-right">$500,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Buffalo River</td> <td>School Boiler and Control Upgrade</td> <td>A-Base</td> <td class="text-right">$290,000</td> <td class="text-right">$290,000</td> </tr> <tr> <td>Canoe Lake</td> <td>School Boiler and Control Upgrade</td> <td>A-Base</td> <td class="text-right">$290,000</td> <td class="text-right">$290,000</td> </tr> <tr> <td>Fishing Lake</td> <td>New School</td> <td>A-Base</td> <td class="text-right">$27,710,600</td> <td class="text-right">$1,000,000</td> </tr> <tr> <td>Peepeekisis</td> <td>School Renovations</td> <td>A-Base</td> <td class="text-right">$2,771,500</td> <td class="text-right">$839,700</td> </tr> <tr> <td>Peter Ballantyne</td> <td>Pelican Narrows High School Add/Reno</td> <td>Budget 2012 Schools</td> <td class="text-right">$25,294,600</td> <td class="text-right">$15,859,800</td> </tr> <tr> <td>Poundmaker</td> <td>School Emergency Boiler Repair</td> <td>A-Base</td> <td class="text-right">$530,000</td> <td class="text-right">$530,000</td> </tr> <tr> <td>Red Earth</td> <td>School Addition &amp; Renovation</td> <td>BCP</td> <td class="text-right">$17,677,000</td> <td class="text-right">$3,000,000</td> </tr> <tr> <td>Wahpeton</td> <td>New School</td> <td>A-Base</td> <td class="text-right">$3,000,000</td> <td class="text-right">$23,500</td> </tr> <tr> <td>Waterhen Lake</td> <td>School Roof Repairs</td> <td>A-Base</td> <td class="text-right">$1,100,000</td> <td class="text-right">$25,000</td> </tr> <tr> <td>Witchekan Lake</td> <td>School Mechanical System Emergency Repair</td> <td>A-Base</td> <td class="text-right">$500,000</td> <td class="text-right">$300,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Alberta (AB) - School Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Little Red River Cree Nation</td> <td><abbr title="​Little Red River Cree Nation">LRRCN</abbr> Fox Lake School Roof Repair</td> <td>A-Base</td> <td>&nbsp;</td> <td class="text-right">$150,000</td> </tr> <tr> <td>O'Chiese</td> <td>O'Chiese New School</td> <td>Budget 2012 Schools</td> <td>&nbsp;</td> <td class="text-right">$1,531,750</td> </tr> </tbody> </table> </div> </section> <section> <h3>British Columbia (BC) - School Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Esk'Etemc</td> <td>New Sxoxomic School</td> <td>A-Base</td> <td class="text-right">$6,417,715</td> <td class="text-right">$311,943</td> </tr> <tr> <td>Gitga'At First Nation</td> <td>Education and Recreation Center Repairs and Renovations</td> <td>A-Base</td> <td class="text-right">$394,853</td> <td class="text-right">$129,870</td> </tr> <tr> <td>Kwakiutl Indian Band</td> <td>Wagalus School Replacement</td> <td>Budget 2012 Schools</td> <td class="text-right">$9,644,072</td> <td class="text-right">$817,858</td> </tr> <tr> <td>Lax Kw'Alaams Indian Band</td> <td>Community School</td> <td>Budget 2012 Schools</td> <td class="text-right">$20,670,044</td> <td class="text-right">$5,404,416</td> </tr> <tr> <td>Nak'Azdli Indian Band</td> <td>Nak'al Bun School</td> <td>A-Base</td> <td class="text-right">$14,208,599</td> <td class="text-right">$1,546,729</td> </tr> <tr> <td>Prophet River First Nation</td> <td>Prophet River School</td> <td>A-Base</td> <td class="text-right">$5,186,532</td> <td class="text-right">$375,224</td> </tr> <tr> <td>Snuneymuxw First Nation</td> <td>Qwam Qwun Stuwixwulh School Replacement</td> <td>A-Base</td> <td class="text-right">$61,365</td> <td class="text-right">$61,365</td> </tr> <tr> <td>Takla Lake First Nation</td> <td>School Renovation and Repairs</td> <td>A-Base</td> <td class="text-right">$558,449</td> <td class="text-right">$200,000</td> </tr> <tr> <td>Tl'Etinqox Government</td> <td>New School Building plus gym reno</td> <td>Budget 2012 Schools</td> <td class="text-right">$8,357,833</td> <td class="text-right">$473,440</td> </tr> <tr> <td>Yunesit'In Government</td> <td>Yunesit'in School Gym Addition</td> <td>A-Base</td> <td class="text-right">$2,680,209</td> <td class="text-right">$25,584</td> </tr> </tbody> </table> </div> </section> </section> <!-- ANNEX B END --> <!-- ANNEX C START --> <section> <div class="clearfix">&nbsp;</div> <h2 id="a40" class="mrgn-tp-md">ANNEX C: 232 Housing Projects (April&nbsp;1,&nbsp;2013 to March&nbsp;31,&nbsp;2014)</h2> <section> <h3>Atlantic (AT) - Housing Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Metepenagiag <abbr title="First Nation">FN</abbr></td> <td>Housing Policy</td> <td>A-Base</td> <td class="text-right">$35,000</td> <td class="text-right">$35,000</td> </tr> <tr> <td>Shubenacadie</td> <td>Housing Policy</td> <td><abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$35,000</td> <td class="text-right">$35,000</td> </tr> <tr> <td>Tobique <abbr title="First Nation">FN</abbr></td> <td>Housing Repairs</td> <td>A-Base</td> <td class="text-right">$63,000</td> <td class="text-right">$63,000</td> </tr> <tr> <td>Waycobah</td> <td>Housing Policy</td> <td><abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$35,000</td> <td class="text-right">$35,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Québec (QC) - Housing Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Kitcisakik</td> <td><span lang="fr">Plan aménagement communautaire</span></td> <td>A-Base</td> <td class="text-right">$131,760</td> <td class="text-right">$131,760</td> </tr> </tbody> </table> </div> </section> <section> <h3>Ontario (ON) - Housing Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>0215 - Fort Severn Band</td> <td>NCOF - Multi-Unit Housing </td> <td>NCOF</td> <td class="text-right">$400,000</td> <td class="text-right">$400,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Manitoba (MB) - Housing Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Opaskwayak Cree Nation</td> <td><abbr title="Operating and Maintenance">O&amp;M</abbr> Housing Planning</td> <td><abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$9,997</td> <td class="text-right">$9,997</td> </tr> </tbody> </table> </div> </section> <section> <h3>Saskatchewan (SK) - Housing Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Carry the Kettle</td> <td>Flooding House Recovery</td> <td>EM</td> <td class="text-right">$758,800</td> <td class="text-right">$462,300</td> </tr> </tbody> </table> </div> </section> <section> <h3>Alberta (AB) - Housing Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Blood</td> <td>Blood Tribe Mould Remediation Housing Units</td> <td>A-Base</td> <td class="text-right">$1,082,259</td> <td class="text-right">$602,259</td> </tr> <tr> <td>Enoch</td> <td>Enoch Housing</td> <td>A-Base</td> <td class="text-right">$625,632</td> <td class="text-right">$366,032</td> </tr> <tr> <td>Little Red River Cree Nation</td> <td><abbr title="Little Red River Cree Nation">LRRCN</abbr> John D'Or Prairie &amp; Garden River Lot Development</td> <td>Infra Alloc</td> <td class="text-right">$255,850</td> <td class="text-right">$255,850</td> </tr> <tr> <td>Loon River</td> <td>KTKN Loon River Sub Division Design</td> <td>A-Base</td> <td class="text-right">$78,834</td> <td class="text-right">$78,834</td> </tr> <tr> <td>Louis Bull</td> <td>Louis Bull Housing</td> <td>A-Base</td> <td class="text-right">$424,951</td> <td class="text-right">$238,351</td> </tr> <tr> <td>Lubicon Lake Band</td> <td>KTKN Lubicon New Housing Units</td> <td>A-Base</td> <td class="text-right">$1,499,408</td> <td class="text-right">$1,499,408</td> </tr> <tr> <td>Lubicon Lake Band</td> <td>Lubicon Housing </td> <td>Hsg Alloc</td> <td class="text-right">$140,100</td> <td class="text-right">$140,100</td> </tr> <tr> <td>Montana</td> <td>Montana Mould Remediation and Retrofits</td> <td>A-Base</td> <td class="text-right">$45,000</td> <td class="text-right">$45,000</td> </tr> <tr> <td>Saddle Lake</td> <td>Saddle Lake Wind Damaged Homes</td> <td>A-Base</td> <td class="text-right">$123,000</td> <td class="text-right">$123,000</td> </tr> <tr> <td>Siksika</td> <td>Siksika New Housing Units</td> <td>A-Base</td> <td class="text-right">$5,304,000</td> <td class="text-right">$5,304,000</td> </tr> <tr> <td>Whitefish Lake #128</td> <td><abbr title="Whitefish Lake">WFL</abbr> #128 Wind Damaged Home Repairs</td> <td>A-Base</td> <td class="text-right">$88,000</td> <td class="text-right">$88,000</td> </tr> <tr> <td>Whitefish Lake #459</td> <td>KTKN Whitefish Atikameg #459 Modular Purchase</td> <td>A-Base</td> <td class="text-right">$535,345</td> <td class="text-right">$535,345</td> </tr> </tbody> </table> </div> </section> <section> <h3>British Columbia (BC) - Housing Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Adams Lake Indian Band</td> <td>Social Housing (MG) 2013/2014 2 units CMHC #19-362-110/008</td> <td>A-Base</td> <td class="text-right">$355,996</td> <td class="text-right">$47,296</td> </tr> <tr> <td>Adams Lake Indian Band</td> <td>Individual Housing (no MG) 2012/2013 AD</td> <td>A-Base</td> <td class="text-right">$242,543</td> <td class="text-right">$23,648</td> </tr> <tr> <td>Alexis Creek Indian Band</td> <td>Social Housing (MG) 2013/2014 4 units CMHC #22-730-519/001</td> <td>A-Base</td> <td class="text-right">$808,900</td> <td class="text-right">$139,396</td> </tr> <tr> <td>Alexis Creek Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, MG</td> <td>A-Base</td> <td class="text-right">$20,134</td> <td class="text-right">$20,134</td> </tr> <tr> <td>Bonaparte Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, JP</td> <td>A-Base</td> <td class="text-right">$28,000</td> <td class="text-right">$27,648</td> </tr> <tr> <td>Bonaparte Indian Band</td> <td>Housing Renovations (No MG) 2012-2013, NG</td> <td>A-Base</td> <td class="text-right">$10,200</td> <td class="text-right">$10,200</td> </tr> <tr> <td>Campbell River Indian Band</td> <td>Social Housing (MG) 2013/2014 2 units CMHC #17-961-947/004</td> <td>A-Base</td> <td class="text-right">$234,150</td> <td class="text-right">$24,672</td> </tr> <tr> <td>Campbell River Indian Band</td> <td>Individual Housing (no MG) 2013/2014 JH</td> <td>A-Base</td> <td class="text-right">$194,672</td> <td class="text-right">$24,672</td> </tr> <tr> <td>Campbell River Indian Band</td> <td>Housing Renovations (No MG) 2013/2014, AH</td> <td>A-Base</td> <td class="text-right">$12,300</td> <td class="text-right">$12,300</td> </tr> <tr> <td>Campbell River Indian Band</td> <td>Housing Renovations (No MG) 2012-2013, LS</td> <td>A-Base</td> <td class="text-right">$12,300</td> <td class="text-right">$12,300</td> </tr> <tr> <td>Cape Mudge Indian Band</td> <td>Elders home</td> <td>A-Base</td> <td class="text-right">$50,000</td> <td class="text-right">$50,000</td> </tr> <tr> <td>Cape Mudge Indian Band</td> <td>Individual Housing (MG) 2013/2014 RB</td> <td>A-Base</td> <td class="text-right">$160,450</td> <td class="text-right">$450</td> </tr> <tr> <td>Cape Mudge Indian Band</td> <td>Individual Housing (MG) 2013/2014 HD</td> <td>A-Base</td> <td class="text-right">$130,450</td> <td class="text-right">$450</td> </tr> <tr> <td>Cape Mudge Indian Band</td> <td>Individual Housing (MG) 2013/2014 AH</td> <td>A-Base</td> <td class="text-right">$304,672</td> <td class="text-right">$24,672</td> </tr> <tr> <td>Cape Mudge Indian Band</td> <td>Individual Housing (MG) 2012/2013 AEC</td> <td>A-Base</td> <td class="text-right">$230,450</td> <td class="text-right">$24,672</td> </tr> <tr> <td>Da Naxda Xw First Nation</td> <td>Housing Renovations (No MG) 2013-2014, JG &amp; VG</td> <td>A-Base</td> <td class="text-right">$35,000</td> <td class="text-right">$35,000</td> </tr> <tr> <td>Doig River First Nation</td> <td>Band Administered Housing (MG) 2013/2014 5 units</td> <td>A-Base</td> <td class="text-right">$830,811</td> <td class="text-right">$174,245</td> </tr> <tr> <td>Douglas Indian Band</td> <td>Social Housing (MG) 2013/2014 5 units CMHC #19-360-395/003</td> <td>A-Base</td> <td class="text-right">$1,086,645</td> <td class="text-right">$199,610</td> </tr> <tr> <td>Ehattesaht Band</td> <td>Band administered (MG) 2013/2014 4 plex</td> <td>A-Base</td> <td class="text-right">$671,376</td> <td class="text-right">$120,393</td> </tr> <tr> <td>Esk'Etemc</td> <td>Mould Renovation (No MG) 2013-2014, WM</td> <td>A-Base</td> <td class="text-right">$17,208</td> <td class="text-right">$17,208</td> </tr> <tr> <td>Esk'Etemc</td> <td>Mould Renovation (No MG) 2013-2014, RC</td> <td>A-Base</td> <td class="text-right">$28,086</td> <td class="text-right">$28,086</td> </tr> <tr> <td>Esk'Etemc</td> <td>Mould Renovation (No MG) 2013-2014, PR</td> <td>A-Base</td> <td class="text-right">$13,346</td> <td class="text-right">$13,346</td> </tr> <tr> <td>Esk'Etemc</td> <td>Mould Renovation (No MG) 2013-2014, MP</td> <td>A-Base</td> <td class="text-right">$28,478</td> <td class="text-right">$28,478</td> </tr> <tr> <td>Esk'Etemc</td> <td>Mould Renovation (No MG) 2013-2014, MC</td> <td>A-Base</td> <td class="text-right">$31,803</td> <td class="text-right">$31,803</td> </tr> <tr> <td>Esk'Etemc</td> <td>Mould Renovation (No MG) 2012-2013, MP</td> <td>A-Base</td> <td class="text-right">$31,805</td> <td class="text-right">$31,805</td> </tr> <tr> <td>Esk'Etemc</td> <td>Mould Renovation (No MG) 2012-2013, JR</td> <td>A-Base</td> <td class="text-right">$31,816</td> <td class="text-right">$31,816</td> </tr> <tr> <td>Esk'Etemc</td> <td>Mould Renovation (No MG) 2012-2013, AP</td> <td>A-Base</td> <td class="text-right">$31,814</td> <td class="text-right">$31,814</td> </tr> <tr> <td>Fort Nelson First Nation</td> <td>Individual Housing (no MG) 2013/2014 JN</td> <td>A-Base</td> <td class="text-right">$110,000</td> <td class="text-right">$34,849</td> </tr> <tr> <td>Fort Nelson First Nation</td> <td>Band Administered Housing (MG) 2013/2014 1 unit</td> <td>A-Base</td> <td class="text-right">$110,000</td> <td class="text-right">$34,849</td> </tr> <tr> <td>Fort Nelson First Nation</td> <td>Band Administered Housing (MG) 2013/2014 1 unit</td> <td>A-Base</td> <td class="text-right">$110,000</td> <td class="text-right">$34,849</td> </tr> <tr> <td>Gitga'At First Nation</td> <td>Inspection of Homes</td> <td>A-Base</td> <td class="text-right">$2,052,800</td> <td class="text-right">$52,800</td> </tr> <tr> <td>Gitxaala Nation</td> <td>Mould Renovation (No MG) 2012-2013, RL</td> <td>A-Base</td> <td class="text-right">$28,400</td> <td class="text-right">$28,400</td> </tr> <tr> <td>Gitxaala Nation</td> <td>Mould Renovation (No MG) 2012-2013, RB</td> <td>A-Base</td> <td class="text-right">$31,700</td> <td class="text-right">$31,700</td> </tr> <tr> <td>Gitxaala Nation</td> <td>Mould Renovation (No MG) 2012-2013, NR</td> <td>A-Base</td> <td class="text-right">$32,900</td> <td class="text-right">$32,900</td> </tr> <tr> <td>Gitxaala Nation</td> <td>Mould Renovation (No MG) 2012-2013, JB</td> <td>A-Base</td> <td class="text-right">$41,850</td> <td class="text-right">$41,330</td> </tr> <tr> <td>Gitxaala Nation</td> <td>Mould Renovation (No MG) 2012-2013, IL</td> <td>A-Base</td> <td class="text-right">$34,900</td> <td class="text-right">$34,900</td> </tr> <tr> <td>Gitxaala Nation</td> <td>Mould Renovation (No MG) 2012-2013, GH</td> <td>A-Base</td> <td class="text-right">$41,610</td> <td class="text-right">$41,330</td> </tr> <tr> <td>Gitxaala Nation</td> <td>Mould Renovation (No MG) 2012-2013, AM</td> <td>A-Base</td> <td class="text-right">$42,900</td> <td class="text-right">$41,330</td> </tr> <tr> <td>Gitxaala Nation</td> <td>Housing Renovations (No MG) 2011/12, 7 units (revised)</td> <td>A-Base</td> <td class="text-right">$186,109</td> <td class="text-right">$127,981</td> </tr> <tr> <td>Gwa'Sala-Nakwaxda'Xw Indian Band</td> <td>Individual Housing (no MG) 2013/2014 PS</td> <td>A-Base</td> <td class="text-right">$43,000</td> <td class="text-right">$30,672</td> </tr> <tr> <td>Gwa'Sala-Nakwaxda'Xw Indian Band</td> <td>Individual Housing (no MG) 2012/2013 NC</td> <td>A-Base</td> <td class="text-right">$120,672</td> <td class="text-right">$30,672</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Stream 1 New BC Region Housing Approach</td> <td>A-Base</td> <td class="text-right">$50,000</td> <td class="text-right">$50,000</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, TH</td> <td>A-Base</td> <td class="text-right">$39,875</td> <td class="text-right">$39,875</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, SC</td> <td>A-Base</td> <td class="text-right">$39,386</td> <td class="text-right">$39,386</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, RM</td> <td>A-Base</td> <td class="text-right">$39,907</td> <td class="text-right">$39,907</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, AT</td> <td>A-Base</td> <td class="text-right">$39,826</td> <td class="text-right">$39,826</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, AP Jr.</td> <td>A-Base</td> <td class="text-right">$34,860</td> <td class="text-right">$34,860</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, AB</td> <td>A-Base</td> <td class="text-right">$39,859</td> <td class="text-right">$39,859</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Band Administered Housing (MG) 2011/12, 2 units</td> <td>A-Base</td> <td class="text-right">$389,550</td> <td class="text-right">$79,844</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, MB</td> <td>A-Base</td> <td class="text-right">$39,869</td> <td class="text-right">$39,869</td> </tr> <tr> <td>Katzie Indian Band</td> <td>Social Housing (MG) 2013/2014 2 units CMHC #19-360-312/003</td> <td>A-Base</td> <td class="text-right">$359,750</td> <td class="text-right">$40,638</td> </tr> <tr> <td>Katzie Indian Band</td> <td>Housing Renovations (No MG) 2012-13, JA</td> <td>A-Base</td> <td class="text-right">$10,300</td> <td class="text-right">$10,235</td> </tr> <tr> <td>K'Ómoks First Nation</td> <td>Housing Renovations (No MG) 2013-2014, Roofs 16 units</td> <td>A-Base</td> <td class="text-right">$80,680</td> <td class="text-right">$80,680</td> </tr> <tr> <td>Kwadacha Indian Band</td> <td>Energy Efficiency Upgrades/Pilot (No MG) 2013-2014, 4 units</td> <td>A-Base</td> <td class="text-right">$267,200</td> <td class="text-right">$55,352</td> </tr> <tr> <td>Little Shuswap Lake Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, SD</td> <td>A-Base</td> <td class="text-right">$27,599</td> <td class="text-right">$27,599</td> </tr> <tr> <td>Little Shuswap Lake Indian Band</td> <td>BATS Remediation (No MG) 2013-2014, HF</td> <td>A-Base</td> <td class="text-right">$22,854</td> <td class="text-right">$22,854</td> </tr> <tr> <td>Malahat First Nation</td> <td>Individual Housing (no MG) 2013/2014 MH</td> <td>A-Base</td> <td class="text-right">$100,000</td> <td class="text-right">$20,672</td> </tr> <tr> <td>Malahat First Nation</td> <td>Individual Housing (no MG) 2013/2014 JE</td> <td>A-Base</td> <td class="text-right">$75,000</td> <td class="text-right">$20,672</td> </tr> <tr> <td>Malahat First Nation</td> <td>Individual Housing (no MG) 2013/2014 GH</td> <td>A-Base</td> <td class="text-right">$100,000</td> <td class="text-right">$20,672</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, TBD</td> <td>A-Base</td> <td class="text-right">$7,185</td> <td class="text-right">$7,185</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, RM Jr.</td> <td>A-Base</td> <td class="text-right">$15,130</td> <td class="text-right">$13,050</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, J.N.</td> <td>A-Base</td> <td class="text-right">$28,160</td> <td class="text-right">$23,260</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, FM</td> <td>A-Base</td> <td class="text-right">$31,450</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, CM</td> <td>A-Base</td> <td class="text-right">$30,280</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Individual Housing (no MG) 2013/2014 SM Jr.</td> <td>A-Base</td> <td class="text-right">$43,355</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Individual Housing (no MG) 2013/2014 RM</td> <td>A-Base</td> <td class="text-right">$58,355</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Individual Housing (no MG) 2013/2014 NM</td> <td>A-Base</td> <td class="text-right">$43,355</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Individual Housing (no MG) 2013/2014 NA</td> <td>A-Base</td> <td class="text-right">$43,355</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Individual Housing (no MG) 2013/2014 JM</td> <td>A-Base</td> <td class="text-right">$434,455</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Individual Housing (no MG) 2013/2014 EJ</td> <td>A-Base</td> <td class="text-right">$43,355</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Individual Housing (MG) 2013/2014 JA</td> <td>A-Base</td> <td class="text-right">$58,355</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Individual Housing (MG) 2013/2014 CL</td> <td>A-Base</td> <td class="text-right">$58,355</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Individual Housing (MG) 2013/2014 BP</td> <td>A-Base</td> <td class="text-right">$58,355</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Individual Housing (MG) 2012/2013 CH</td> <td>A-Base</td> <td class="text-right">$231,855</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, MJ</td> <td>A-Base</td> <td class="text-right">$33,140</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Moricetown Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, JN</td> <td>A-Base</td> <td class="text-right">$28,510</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Mount Currie Indian Band</td> <td>Band Administered Housing (MG) 2013/2014 6 units</td> <td>A-Base</td> <td class="text-right">$565,888</td> <td class="text-right">$165,888</td> </tr> <tr> <td>Mount Currie Indian Band</td> <td>Individual Housing (no MG) 2013/2014 NP</td> <td>A-Base</td> <td class="text-right">$152,798</td> <td class="text-right">$5,000</td> </tr> <tr> <td>Mount Currie Indian Band</td> <td>Individual Housing (no MG) 2013/2014 JW</td> <td>A-Base</td> <td class="text-right">$106,988</td> <td class="text-right">$27,648</td> </tr> <tr> <td>Musqueam Indian Band</td> <td>Individual Housing (MG) 2013/2014 ATF</td> <td>A-Base</td> <td class="text-right">$240,319</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Musqueam Indian Band</td> <td>Individual Housing (MG) 2012/2013 CJCA</td> <td>A-Base</td> <td class="text-right">$239,450</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Rental Review Handbook Phase II</td> <td>A-Base</td> <td class="text-right">$34,870</td> <td class="text-right">$34,870</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td>Mould Renovation (No MG) 2013-2014, WS</td> <td>A-Base</td> <td class="text-right">$23,313</td> <td class="text-right">$23,313</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td>Mould Renovation (No MG) 2013-2014, WP</td> <td>A-Base</td> <td class="text-right">$36,653</td> <td class="text-right">$36,653</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td>Mould Renovation (No MG) 2013-2014, LP</td> <td>A-Base</td> <td class="text-right">$32,809</td> <td class="text-right">$32,809</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td>Mould Renovation (No MG) 2013-2014, LN Sr.</td> <td>A-Base</td> <td class="text-right">$33,713</td> <td class="text-right">$33,713</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td>Mould Renovation (No MG) 2013-2014, LM</td> <td>A-Base</td> <td class="text-right">$37,772</td> <td class="text-right">$37,772</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td>Mould Renovation (No MG) 2013-2014, EH</td> <td>A-Base</td> <td class="text-right">$36,923</td> <td class="text-right">$36,923</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td>Mould Renovation (No MG) 2013-2014, BK</td> <td>A-Base</td> <td class="text-right">$37,393</td> <td class="text-right">$37,393</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td>Mould Renovation (No MG) 2013-2014, BA Sr.</td> <td>A-Base</td> <td class="text-right">$37,772</td> <td class="text-right">$37,772</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td>Individual Housing (no MG) 2013/2014 TH</td> <td>A-Base</td> <td class="text-right">$201,500</td> <td class="text-right">$37,772</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td>Mould Renovation (No MG) 2013-2014, MW</td> <td>A-Base</td> <td class="text-right">$32,913</td> <td class="text-right">$32,913</td> </tr> <tr> <td>Nuxalk Nation Band</td> <td>Mould Renovation (No MG) 2013-2014, JN</td> <td>A-Base</td> <td class="text-right">$37,772</td> <td class="text-right">$37,772</td> </tr> <tr> <td>Old Massett Village Council Band</td> <td>Roof Replacement Phase 3 - 34 Roofs</td> <td>A-Base</td> <td class="text-right">$270,090</td> <td class="text-right">$256,586</td> </tr> <tr> <td>Old Massett Village Council Band</td> <td>Mould Renovation (No MG) 2013-2014, 6 units</td> <td>A-Base</td> <td class="text-right">$247,900</td> <td class="text-right">$247,980</td> </tr> <tr> <td>Old Massett Village Council Band</td> <td>Mould Renovation (No MG) 2013-2014, 5 Units</td> <td>A-Base</td> <td class="text-right">$206,585</td> <td class="text-right">$206,585</td> </tr> <tr> <td>Osoyoos Indian Band</td> <td>Social Housing (MG) 2013/2014 4 units CMHC #19360130/013</td> <td>A-Base</td> <td class="text-right">$755,441</td> <td class="text-right">$97,276</td> </tr> <tr> <td>Pauquachin Indian Band</td> <td>Housing Renovations Joint RRAP (No MG) 2013-2014, LH &amp; MB</td> <td>A-Base</td> <td class="text-right">$43,681</td> <td class="text-right">$11,681</td> </tr> <tr> <td>Penelakut Tribe</td> <td>Fire &amp; Water Damage Renovation (No MG) 2013-2014, SW</td> <td>A-Base</td> <td class="text-right">$34,650</td> <td class="text-right">$34,650</td> </tr> <tr> <td>Penticton Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, MK</td> <td>A-Base</td> <td class="text-right">$26,950</td> <td class="text-right">$24,319</td> </tr> <tr> <td>Quatsino Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, RS</td> <td>A-Base</td> <td class="text-right">$27,251</td> <td class="text-right">$27,251</td> </tr> <tr> <td>Quatsino Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, EN</td> <td>A-Base</td> <td class="text-right">$23,855</td> <td class="text-right">$23,855</td> </tr> <tr> <td>Quatsino Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, AM</td> <td>A-Base</td> <td class="text-right">$27,163</td> <td class="text-right">$17,563</td> </tr> <tr> <td>Saulteau First Nations</td> <td>Mould Renovation (No MG) 2013-2014, W&amp;MG</td> <td>A-Base</td> <td class="text-right">$13,610</td> <td class="text-right">$13,610</td> </tr> <tr> <td>Saulteau First Nations</td> <td>Mould Renovation (No MG) 2012-2013, D&amp;GP</td> <td>A-Base</td> <td class="text-right">$13,400</td> <td class="text-right">$13,400</td> </tr> <tr> <td>Seabird Island Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, 4 units FM/CW/tbd/WB</td> <td>A-Base</td> <td class="text-right">$77,095</td> <td class="text-right">$75,998</td> </tr> <tr> <td>Seabird Island Indian Band</td> <td>Housing Renovations (No MG) 2012-13, CH</td> <td>A-Base</td> <td class="text-right">$12,860</td> <td class="text-right">$12,235</td> </tr> <tr> <td>Shackan Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, DW</td> <td>A-Base</td> <td class="text-right">$17,345</td> <td class="text-right">$17,345</td> </tr> <tr> <td>Shackan Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, BB</td> <td>A-Base</td> <td class="text-right">$23,345</td> <td class="text-right">$23,345</td> </tr> <tr> <td>Shackan Indian Band</td> <td>Housing Renovations (No MG) 2013-2014, RA</td> <td>A-Base</td> <td class="text-right">$12,300</td> <td class="text-right">$12,235</td> </tr> <tr> <td>Shackan Indian Band</td> <td>Housing Renovations (No MG) 2013-2014, KJ</td> <td>A-Base</td> <td class="text-right">$16,300</td> <td class="text-right">$12,235</td> </tr> <tr> <td>Shackan Indian Band</td> <td>Housing Renovations (No MG) 2013-2014, JA</td> <td>A-Base</td> <td class="text-right">$18,545</td> <td class="text-right">$18,545</td> </tr> <tr> <td>Shackan Indian Band</td> <td>Housing Renovations (No MG) 2013-2014, FC</td> <td>A-Base</td> <td class="text-right">$16,300</td> <td class="text-right">$12,235</td> </tr> <tr> <td>Shackan Indian Band</td> <td>Housing Renovations (No MG) 2013-2014, BJ</td> <td>A-Base</td> <td class="text-right">$13,300</td> <td class="text-right">$12,235</td> </tr> <tr> <td>Shackan Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, SJ</td> <td>A-Base</td> <td class="text-right">$20,045</td> <td class="text-right">$20,045</td> </tr> <tr> <td>Shackan Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, MJ</td> <td>A-Base</td> <td class="text-right">$28,095</td> <td class="text-right">$24,319</td> </tr> <tr> <td>Skidegate Indian Band</td> <td>Mould Renovations (No MG) 2012-2013, 8 units Phase 2</td> <td>A-Base</td> <td class="text-right">$330,640</td> <td class="text-right">$235,040</td> </tr> <tr> <td>Skidegate Indian Band</td> <td>Mould Renovations (No MG) 2012-2013, 10 units Phase 1</td> <td>A-Base</td> <td class="text-right">$394,450</td> <td class="text-right">$294,450</td> </tr> <tr> <td>Skwah Indian Band</td> <td>Individual Housing (no MG) 2013/2014 TM</td> <td>A-Base</td> <td class="text-right">$170,319</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Sliammon Indian Band</td> <td>Individual Housing (no MG) 2013/2014 DG</td> <td>A-Base</td> <td class="text-right">$75,496</td> <td class="text-right">$23,869</td> </tr> <tr> <td>Snuneymuxw First Nation</td> <td>Housing Renovations (No MG) 2013-2014, MT</td> <td>A-Base</td> <td class="text-right">$12,185</td> <td class="text-right">$10,111</td> </tr> <tr> <td>Snuneymuxw First Nation</td> <td>Housing Renovations (No MG) 2013-2014, AW</td> <td>A-Base</td> <td class="text-right">$18,550</td> <td class="text-right">$10,111</td> </tr> <tr> <td>Soda Creek Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, Vacant unit</td> <td>A-Base</td> <td class="text-right">$22,200</td> <td class="text-right">$22,200</td> </tr> <tr> <td>Squamish Indian Band</td> <td>Individual Housing (no MG) 2013/2014 SH</td> <td>A-Base</td> <td class="text-right">$221,043</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Squamish Indian Band</td> <td>Individual Housing (no MG) 2013/2014 BB</td> <td>A-Base</td> <td class="text-right">$162,319</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Squamish Indian Band</td> <td>Band Administered Housing (no MG) 2013/2014 TH</td> <td>A-Base</td> <td class="text-right">$140,000</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Squamish Indian Band</td> <td>Band Administered Housing (no MG) 2013/2014 MLM</td> <td>A-Base</td> <td class="text-right">$140,000</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Squamish Indian Band</td> <td>Band Administered Housing (no MG) 2012/2013 4 units</td> <td>A-Base</td> <td class="text-right">$560,000</td> <td class="text-right">$81,276</td> </tr> <tr> <td>Sts'Ailes Band</td> <td>Mould Renovation (No MG) 2013-2014, 10 units</td> <td>A-Base</td> <td class="text-right">$260,475</td> <td class="text-right">$237,793</td> </tr> <tr> <td>Stz'Uminus First Nation</td> <td>Social Housing (MG) 2013/2014 4 units CMHC #22-095-145/002</td> <td>A-Base</td> <td class="text-right">$651,369</td> <td class="text-right">$82,688</td> </tr> <tr> <td>Stz'Uminus First Nation</td> <td>Band Administered Housing (no MG) 6 units</td> <td>A-Base</td> <td class="text-right">$941,895</td> <td class="text-right">$124,032</td> </tr> <tr> <td>Sumas First Nation</td> <td>Mould Renovation (No MG) 2012-2013, FM</td> <td>A-Base</td> <td class="text-right">$20,300</td> <td class="text-right">$20,300</td> </tr> <tr> <td>Tk'Emlups Te Secwepemc</td> <td>Mould Renovation (No MG) 2013-2014, LJ</td> <td>A-Base</td> <td class="text-right">$13,003</td> <td class="text-right">$10,084</td> </tr> <tr> <td>Tk'Emlups Te Secwepemc</td> <td>Mould Renovation (No MG) 2013-2014, DJ</td> <td>A-Base</td> <td class="text-right">$20,102</td> <td class="text-right">$20,102</td> </tr> <tr> <td>Tk'Emlups Te Secwepemc</td> <td>Mould Renovation (No MG) 2013-2014, AP</td> <td>A-Base</td> <td class="text-right">$14,184</td> <td class="text-right">$14,184</td> </tr> <tr> <td>Tk'Emlups Te Secwepemc</td> <td>Individual Housing (no MG) 2013/2014 SDP</td> <td>A-Base</td> <td class="text-right">$220,179</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Tk'Emlups Te Secwepemc</td> <td>Individual Housing (no MG) 2013/2014 KDL</td> <td>A-Base</td> <td class="text-right">$286,647</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Tk'Emlups Te Secwepemc</td> <td>Mould Renovation (No MG) 2013-2014, SJ</td> <td>A-Base</td> <td class="text-right">$17,271</td> <td class="text-right">$17,271</td> </tr> <tr> <td>Tk'Emlups Te Secwepemc</td> <td>Mould Renovation (No MG) 2013-2014, MB</td> <td>A-Base</td> <td class="text-right">$8,350</td> <td class="text-right">$8,350</td> </tr> <tr> <td>Tla-O-Qui-Aht First Nations</td> <td>Band Administered (MG) 2013/2014 12 units (3 4-plex)</td> <td>A-Base</td> <td class="text-right">$1,491,600</td> <td class="text-right">$631,572</td> </tr> <tr> <td>Tl'Etinqox Government</td> <td>Mould Renovation (No MG) 2012-2013, IS</td> <td>A-Base</td> <td class="text-right">$34,799</td> <td class="text-right">$34,799</td> </tr> <tr> <td>Tl'Etinqox Government</td> <td>Mould Renovation (No MG) 2012-2013, CP</td> <td>A-Base</td> <td class="text-right">$34,809</td> <td class="text-right">$34,809</td> </tr> <tr> <td>Tl'Etinqox Government</td> <td>Mould Renovation (No MG) 2012-2013, CA</td> <td>A-Base</td> <td class="text-right">$24,484</td> <td class="text-right">$24,484</td> </tr> <tr> <td>Tl'Etinqox Government</td> <td>Housing Renovations (No MG) 2010/11, RJ</td> <td>A-Base</td> <td class="text-right">$8,985</td> <td class="text-right">$8,099</td> </tr> <tr> <td>Toosey Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, JG</td> <td>A-Base</td> <td class="text-right">$31,814</td> <td class="text-right">$31,814</td> </tr> <tr> <td>Tsartlip Indian Band</td> <td>Individual Housing (no MG) 2013/2014, NS</td> <td>A-Base</td> <td class="text-right">$162,672</td> <td class="text-right">$20,672</td> </tr> <tr> <td>Tsartlip Indian Band</td> <td>Individual Housing (no MG) 2013/2014 WM</td> <td>A-Base</td> <td class="text-right">$163,172</td> <td class="text-right">$20,672</td> </tr> <tr> <td>Tsartlip Indian Band</td> <td>Individual Housing (no MG) 2013/2014 PH</td> <td>A-Base</td> <td class="text-right">$105,450</td> <td class="text-right">$20,672</td> </tr> <tr> <td>Tsartlip Indian Band</td> <td>Individual Housing (no MG) 2013/2014 GLM</td> <td>A-Base</td> <td class="text-right">$168,672</td> <td class="text-right">$20,672</td> </tr> <tr> <td>Tsartlip Indian Band</td> <td>Individual Housing (MG) 2013/2014 MA</td> <td>A-Base</td> <td class="text-right">$545,672</td> <td class="text-right">$20,672</td> </tr> <tr> <td>Tsawout First Nation</td> <td>Individual Housing (no MG) 2013/2014 MS</td> <td>A-Base</td> <td class="text-right">$140,897</td> <td class="text-right">$20,672</td> </tr> <tr> <td>Tsay Keh Dene Band</td> <td>Band Administered Housing (2013/2014) 8 units</td> <td>A-Base</td> <td class="text-right">$2,147,630</td> <td class="text-right">$330,640</td> </tr> <tr> <td>Tseshaht</td> <td>Mould Renovation (No MG) 2012-2013, 5 units, EG/JT/BD/LM/KR</td> <td>A-Base</td> <td class="text-right">$87,250</td> <td class="text-right">$80,972</td> </tr> <tr> <td>Ts'Kw'Aylaxw First Nation</td> <td>Social Housing (MG) 2013/2014 4 units CMHC #22-730-485/001</td> <td>A-Base</td> <td class="text-right">$692,956</td> <td class="text-right">$110,592</td> </tr> <tr> <td>Ts'Kw'Aylaxw First Nation</td> <td>Mould Renovation (No MG) 2013-2014, P&amp;H McD</td> <td>A-Base</td> <td class="text-right">$33,195</td> <td class="text-right">$27,648</td> </tr> <tr> <td>Ts'Kw'Aylaxw First Nation</td> <td>Mould Renovation (No MG) 2013-2014, J&amp;S McK</td> <td>A-Base</td> <td class="text-right">$18,495</td> <td class="text-right">$13,724</td> </tr> <tr> <td>Ts'Kw'Aylaxw First Nation</td> <td>Mould Renovation (No MG) 2013-2014, FL</td> <td>A-Base</td> <td class="text-right">$21,295</td> <td class="text-right">$13,724</td> </tr> <tr> <td>Ts'Kw'Aylaxw First Nation</td> <td>Mould Renovation (No MG) 2013-2014, FA</td> <td>A-Base</td> <td class="text-right">$27,395</td> <td class="text-right">$27,395</td> </tr> <tr> <td>Ts'Kw'Aylaxw First Nation</td> <td>Mould Renovation (No MG) 2013-2014, CH</td> <td>A-Base</td> <td class="text-right">$27,795</td> <td class="text-right">$27,648</td> </tr> <tr> <td>Ts'Kw'Aylaxw First Nation</td> <td>Mould Renovation (No MG) 2013-2014, A&amp;R E</td> <td>A-Base</td> <td class="text-right">$37,895</td> <td class="text-right">$13,724</td> </tr> <tr> <td>Ts'Kw'Aylaxw First Nation</td> <td>Housing Renovations (No MG) 2013-2014, VN</td> <td>A-Base</td> <td class="text-right">$15,900</td> <td class="text-right">$13,924</td> </tr> <tr> <td>Ts'Kw'Aylaxw First Nation</td> <td>Housing Renovations (No MG) 2013-2014, ST</td> <td>A-Base</td> <td class="text-right">$15,000</td> <td class="text-right">$11,000</td> </tr> <tr> <td>Ts'Kw'Aylaxw First Nation</td> <td>Housing Renovations (No MG) 2013-2014, LM</td> <td>A-Base</td> <td class="text-right">$15,250</td> <td class="text-right">$13,924</td> </tr> <tr> <td>Tsleil-Waututh Nation</td> <td>Social Housing (MG) 2013/2014 4 units CMHC #22-501-670/005</td> <td>A-Base</td> <td class="text-right">$785,200</td> <td class="text-right">$39,738</td> </tr> <tr> <td>T'Sou-Ke First Nation</td> <td>Individual Housing (MG) 2013/2014 MT</td> <td>A-Base</td> <td class="text-right">$289,106</td> <td class="text-right">$20,672</td> </tr> <tr> <td>T'Sou-Ke First Nation</td> <td>Housing Renovations (No MG) 2013-2014, CG</td> <td>A-Base</td> <td class="text-right">$13,250</td> <td class="text-right">$10,411</td> </tr> <tr> <td>Tzeachten Indian Band</td> <td>Individual Housing (no MG) 2013/2014 TG</td> <td>A-Base</td> <td class="text-right">$310,160</td> <td class="text-right">$10,160</td> </tr> <tr> <td>Westbank First Nation</td> <td>Pine Acres Renovation (No MG) 2013-2014, 21 units</td> <td>A-Base</td> <td class="text-right">$413,917</td> <td class="text-right">$73,000</td> </tr> <tr> <td>Westbank First Nation</td> <td>Individual Housing (no MG) 2013/2014 SM</td> <td>A-Base</td> <td class="text-right">$110,319</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Westbank First Nation</td> <td>Individual Housing (no MG) 2013/2014 LD Jr.</td> <td>A-Base</td> <td class="text-right">$320,319</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, WA</td> <td>A-Base</td> <td class="text-right">$24,535</td> <td class="text-right">$24,535</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, VG</td> <td>A-Base</td> <td class="text-right">$28,010</td> <td class="text-right">$28,010</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, TW</td> <td>A-Base</td> <td class="text-right">$26,065</td> <td class="text-right">$21,565</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, JA</td> <td>A-Base</td> <td class="text-right">$26,100</td> <td class="text-right">$26,100</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, DS</td> <td>A-Base</td> <td class="text-right">$22,810</td> <td class="text-right">$22,810</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, CW</td> <td>A-Base</td> <td class="text-right">$28,355</td> <td class="text-right">$23,510</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, AS</td> <td>A-Base</td> <td class="text-right">$20,115</td> <td class="text-right">$20,115</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Individual Housing (MG) 2013/2014 DS</td> <td>A-Base</td> <td class="text-right">$171,850</td> <td class="text-right">$450</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Bats Renovation (No MG) 2013-2014, SM</td> <td>A-Base</td> <td class="text-right">$28,355</td> <td class="text-right">$28,355</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, MW</td> <td>A-Base</td> <td class="text-right">$26,860</td> <td class="text-right">$26,860</td> </tr> <tr> <td>Xaxli'P Indian Band</td> <td>Mould Renovation (No MG) 2013-2014, FO</td> <td>A-Base</td> <td class="text-right">$17,600</td> <td class="text-right">$13,748</td> </tr> </tbody> </table> </div> </section> <section> <h3>Yukon (YK) - Housing Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td><abbr title="Ross River Dena Council">RRDC</abbr></td> <td>Housing Quality Assessment</td> <td>A-Base</td> <td class="text-right">$60,000</td> <td class="text-right">$60,000</td> </tr> <tr> <td><abbr title="Ross River Dena Council">RRDC</abbr></td> <td>Housing Quality Inventory Inspection</td> <td>A-Base</td> <td class="text-right">$48,000</td> <td class="text-right">$48,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Québec (QC) - Housing Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td><abbr lang="fr" title="Assemblée des Premières nations du Québec et Labrador">APNQL</abbr></td> <td><span lang="fr">Services consultatifs</span></td> <td>A-Base / <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td class="text-right">$125,000</td> <td class="text-right">$125,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Ontario (ON) - Housing Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>0143 - Attawapiskat Band</td> <td>NCOF - MULTI-UNIT HOUSING #RJQQ</td> <td>NCOF</td> <td class="text-right">$2,200,000</td> <td class="text-right">$1,000,000</td> </tr> <tr> <td>0144 - Moose Cree First Nation</td> <td>NCOF - MULTI-UNIT HOUSING</td> <td>NCOF</td> <td class="text-right">$800,000</td> <td class="text-right">$200,000</td> </tr> <tr> <td>0208 - Pikangikum Band</td> <td>NCOF - MULTI-UNIT HOUSING</td> <td>NCOF</td> <td class="text-right">$800,000</td> <td class="text-right">$400,000</td> </tr> <tr> <td>0243 - Kashechewan Band</td> <td>NCOF - MULTI-UNIT HOUSING</td> <td>NCOF</td> <td class="text-right">$2,200,000</td> <td class="text-right">$1,000,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Manitoba (MB) - Housing Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Berens River</td> <td>S618 Log Home</td> <td>NCOF</td> <td class="text-right">$683,400</td> <td class="text-right">$490,900</td> </tr> <tr> <td>Ebb and Flow</td> <td>S584 Replacement of Homes 2011 Flood</td> <td>FMC 40M</td> <td class="text-right">$8,590,789</td> <td class="text-right">$6,213,789</td> </tr> <tr> <td>Lake St Martin</td> <td>S615 133 Home Demolition</td> <td>FMC 40M</td> <td class="text-right">$1,984,900</td> <td class="text-right">$1,185,557</td> </tr> <tr> <td>Manto Sipi Cree Nation</td> <td>S622 Portable Housing Trailers</td> <td>NCOF</td> <td class="text-right">$273,141</td> <td class="text-right">$131,351</td> </tr> <tr> <td>Peguis</td> <td>S500 Flood Mitigation Works to Houses and Infrastructure</td> <td>FMC 40M</td> <td class="text-right">$15,312,316</td> <td class="text-right">$11,312,316</td> </tr> <tr> <td>Pinaymootang</td> <td>S582 15 Unit Housing</td> <td>FMC 40M</td> <td class="text-right">$5,363,058</td> <td class="text-right">$3,863,058</td> </tr> <tr> <td>Pinaymootang</td> <td>S581 Housing Assessment</td> <td>FMC 40M</td> <td class="text-right">$330,250</td> <td class="text-right">$205,250</td> </tr> </tbody> </table> </div> </section> <section> <h3>British Columbia (BC) - Housing Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Bonaparte Indian Band</td> <td>Band Administered Housing (no MG) 2012-2013, 1 unit</td> <td>A-Base</td> <td class="text-right">$177,648</td> <td class="text-right">$27,648</td> </tr> <tr> <td>Cowichan Tribes</td> <td>Multi-unit Housing</td> <td>A-Base</td> <td class="text-right">$41,150</td> <td class="text-right">$11,255</td> </tr> <tr> <td>Glen Vowell Indian Band</td> <td>Individual Housing (no MG) 2013/2014 JSV</td> <td>A-Base</td> <td class="text-right">$98,396</td> <td class="text-right">$31,249</td> </tr> <tr> <td>Kitsumkalum Indian Band</td> <td>Social Housing (MG) 2012/2013 4 units CMHC #19-360-445/004</td> <td>A-Base</td> <td class="text-right">$750,038</td> <td class="text-right">$101,420</td> </tr> <tr> <td>Kwadacha Indian Band</td> <td>Band Administered Housing (MG) 2013/2014 6 units</td> <td>A-Base</td> <td class="text-right">$1,402,400</td> <td class="text-right">$247,980</td> </tr> <tr> <td>Leq 'A : Mel First Nation</td> <td>Individual Housing (no MG) 2013/2014 RP</td> <td>A-Base</td> <td class="text-right">$240,319</td> <td class="text-right">$20,319</td> </tr> <tr> <td>Lower Nicola Indian Band</td> <td>Mould Renovation (No MG) 2012-2013, J&amp;L D</td> <td>A-Base</td> <td class="text-right">$22,458</td> <td class="text-right">$4,650</td> </tr> <tr> <td>Lower Similkameen Band</td> <td>Individual Housing (no MG) 2013/2014 LT</td> <td>A-Base</td> <td class="text-right">$207,100</td> <td class="text-right">$10,000</td> </tr> <tr> <td>Lower Similkameen Band</td> <td>Individual Housing (no MG) 2013/2014 LL</td> <td>A-Base</td> <td class="text-right">$22,175</td> <td class="text-right">$27,648</td> </tr> <tr> <td>Musqueam Indian Band</td> <td>Individual Housing (no MG) 2013/2014 ES &amp; WS</td> <td>A-Base</td> <td class="text-right">$180,638</td> <td class="text-right">$40,638</td> </tr> <tr> <td>Nanoose First Nation Band</td> <td>Individual Housing (no MG) 2013/2014 OB</td> <td>A-Base</td> <td class="text-right">$195,672</td> <td class="text-right">$20,672</td> </tr> <tr> <td>Nanoose First Nation Band</td> <td>Individual Housing (no MG) 2013/2014 BE</td> <td>A-Base</td> <td class="text-right">$211,891</td> <td class="text-right">$20,672</td> </tr> <tr> <td>Neskonlith Indian Band</td> <td>Individual Housing (MG) 2013/2014 TD</td> <td>A-Base</td> <td class="text-right">$273,640</td> <td class="text-right">$23,640</td> </tr> <tr> <td>Pacheedaht First Nation</td> <td>Housing Renovations (No MG) 2013-2014, 4 units, Roofs Only</td> <td>A-Base</td> <td class="text-right">$21,890</td> <td class="text-right">$907</td> </tr> <tr> <td>Simpcw First Nation</td> <td>Individual Housing (MG) 2012/2013 RTL</td> <td>A-Base</td> <td class="text-right">$247,003</td> <td class="text-right">$27,648</td> </tr> <tr> <td>Tl'Azt'En Nation</td> <td>Housing Renovations (No MG) 2012-13, BD</td> <td>A-Base</td> <td class="text-right">$31,430</td> <td class="text-right">$16,025</td> </tr> <tr> <td>Xaxli'P Indian Band</td> <td>Band Administered Housing (MG) 2012-2013 2 units</td> <td>A-Base</td> <td class="text-right">$211,648</td> <td class="text-right">$55,296</td> </tr> </tbody> </table> </div> </section> </section> <!-- ANNEX C END --> <!-- ANNEX D START --> <section> <div class="clearfix">&nbsp;</div> <h2 id="a41" class="mrgn-tp-md">ANNEX D: 289 Other Community Infrastructure Projects (April&nbsp;1,&nbsp;2013 to March&nbsp;31,&nbsp;2014)</h2> <section> <h3>Atlantic (AT) - Other Community Infrastructure Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Chapel Island</td> <td>Response</td> <td>EM</td> <td class="text-right">$56,190</td> <td class="text-right">$56,190</td> </tr> <tr> <td>Eel River Bar</td> <td>Response</td> <td>EM</td> <td class="text-right">$12,520,977</td> <td class="text-right">$1,500,000</td> </tr> <tr> <td>Eskasoni</td> <td>School Fuel Tank Upgrades</td> <td>A-Base</td> <td class="text-right">$95,175</td> <td class="text-right">$95,175</td> </tr> <tr> <td>Eskasoni</td> <td>Response</td> <td>EM</td> <td class="text-right">$764,605</td> <td class="text-right">$764,605</td> </tr> <tr> <td>Eskasoni</td> <td>School Fuel Tank Upgrades</td> <td>TB - Fuel Tank</td> <td class="text-right">$140,938</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Kingsclear <abbr title="First Nation">FN</abbr></td> <td>Fire Protection</td> <td>A-Base</td> <td class="text-right">$9,200</td> <td class="text-right">$9,200</td> </tr> <tr> <td>Lennox Island <abbr title="First Nation">FN</abbr></td> <td>School Fuel Tank Upgrades</td> <td>TB - Fuel Tank</td> <td class="text-right">$112,821</td> <td class="text-right">$74,636</td> </tr> <tr> <td>Lennox Island <abbr title="First Nation">FN</abbr></td> <td>Road &amp; Bridges</td> <td>A-Base</td> <td class="text-right">$200,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Membertou</td> <td>Energy Efficiency Initiative</td> <td><abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$98,833</td> <td class="text-right">$98,833</td> </tr> <tr> <td>Mushuau Innu <abbr title="First Nation">FN</abbr></td> <td>Electrification - Projects</td> <td>A-Base</td> <td class="text-right">$314,363</td> <td class="text-right">$314,363</td> </tr> <tr> <td>Pictou</td> <td>Fire Protection</td> <td>A-Base</td> <td class="text-right">$12,307</td> <td class="text-right">$12,307</td> </tr> <tr> <td>Tobique <abbr title="First Nation">FN</abbr></td> <td>Fire Protection</td> <td>A-Base</td> <td class="text-right">$32,515</td> <td class="text-right">$32,515</td> </tr> <tr> <td>Waycobah</td> <td>Energy Efficiency Initiative</td> <td><abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$100,000</td> <td class="text-right">$100,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Québec (QC) - Other Community Infrastructure Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Barriere Lake</td> <td>Service truck</td> <td>A-Base</td> <td class="text-right">$28,289</td> <td class="text-right">$28,289</td> </tr> <tr> <td>Barriere Lake</td> <td><span lang="fr">Réservoir pétrolier</span></td> <td>A-Base</td> <td class="text-right">$32,844</td> <td class="text-right">$32,844</td> </tr> <tr> <td>Ekuanitshit</td> <td><span lang="fr">Réservoir pétrolier</span></td> <td>A-Base</td> <td class="text-right">$33,300</td> <td class="text-right">$33,300</td> </tr> <tr> <td>Kanesatake</td> <td>Service truck</td> <td>A-Base</td> <td class="text-right">$38,655</td> <td class="text-right">$38,655</td> </tr> <tr> <td>Kanesatake</td> <td><span lang="fr">Réservoir pétrolier</span></td> <td>A-Base</td> <td class="text-right">$19,599</td> <td class="text-right">$19,599</td> </tr> <tr> <td>Kitcisakik</td> <td><span lang="fr">Rénovation - Bâtiment communautaire</span></td> <td>A-Base</td> <td class="text-right">$24,958</td> <td class="text-right">$24,958</td> </tr> <tr> <td><span lang="fr">Lac Simon</span></td> <td><span lang="fr">Étude démographique</span></td> <td>A-Base</td> <td class="text-right">$5,016</td> <td class="text-right">$5,016</td> </tr> <tr> <td>Listuguj</td> <td>Replacement Band Garage</td> <td>A-Base</td> <td class="text-right">$1,200,000</td> <td class="text-right">$285,000</td> </tr> <tr> <td>Listuguj</td> <td>Acquisition new excavator</td> <td>A-Base</td> <td class="text-right">$215,000</td> <td class="text-right">$215,000</td> </tr> <tr> <td>Manawan</td> <td><span lang="fr">Aréna</span></td> <td>A-Base</td> <td class="text-right">$200,000</td> <td class="text-right">$200,000</td> </tr> <tr> <td>Manawan</td> <td><span lang="fr">Réservoir pétrolier</span></td> <td>A-Base</td> <td class="text-right">$83,643</td> <td class="text-right">$83,643</td> </tr> <tr> <td>Mashteuiatsh</td> <td>Réfection rue Mahikan</td> <td>A-Base</td> <td class="text-right">$791,112</td> <td class="text-right">$791,112</td> </tr> <tr> <td>Mashteuiatsh</td> <td><span lang="fr">Réfection rue Ouiatchouan</span> - Upakalu - QL69</td> <td>A-Base</td> <td class="text-right">$2,674,458</td> <td class="text-right">$2,674,458</td> </tr> <tr> <td>Mashteuiatsh</td> <td><span lang="fr">Système de réfrigération</span></td> <td>A-Base</td> <td class="text-right">$200,000</td> <td class="text-right">$200,000</td> </tr> <tr> <td>Mashteuiatsh</td> <td><span lang="fr">Réservoir pétrolier</span> - QM55</td> <td>A-Base</td> <td class="text-right">$99,000</td> <td class="text-right">$99,000</td> </tr> <tr> <td>Natashquan</td> <td><span lang="fr">Camion de service</span></td> <td>A-Base</td> <td class="text-right">$35,980</td> <td class="text-right">$35,980</td> </tr> <tr> <td>Opitciwan</td> <td><span lang="fr">Décontamination quadruplex</span> - QL58</td> <td>A-Base</td> <td class="text-right">$13,000</td> <td class="text-right">$13,000</td> </tr> <tr> <td>Opitciwan</td> <td><span lang="fr">Réservoir pétrolier</span></td> <td>A-Base</td> <td class="text-right">$621,971</td> <td class="text-right">$621,971</td> </tr> <tr> <td>Timiskaming</td> <td>Eco Center</td> <td>A-Base</td> <td class="text-right">$65,148</td> <td class="text-right">$65,148</td> </tr> <tr> <td>Timiskaming</td> <td>Dump Site</td> <td>A-Base</td> <td class="text-right">$228,816</td> <td class="text-right">$228,816</td> </tr> <tr> <td>Unamen Shipu</td> <td><span lang="fr">Dépôt en tranchée</span></td> <td>A-Base</td> <td class="text-right">$32,202</td> <td class="text-right">$32,202</td> </tr> <tr> <td>Unamen Shipu</td> <td><span lang="fr">Maison des jeunes</span></td> <td>A-Base</td> <td class="text-right">$119,003</td> <td class="text-right">$119,003</td> </tr> <tr> <td>Unamen Shipu</td> <td><span lang="fr">Réservoir pétrolier</span></td> <td>A-Base</td> <td class="text-right">$96,050</td> <td class="text-right">$96,050</td> </tr> <tr> <td>Viger</td> <td><span lang="fr">Rénovation - Bâtiment communautaire</span></td> <td>A-Base</td> <td class="text-right">$34,068</td> <td class="text-right">$34,068</td> </tr> <tr> <td>Wemotaci</td> <td><span lang="fr">Dépôt sec</span></td> <td>A-Base</td> <td class="text-right">$100,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Wemotaci</td> <td><span lang="fr">Réservoir pétrolier</span></td> <td>A-Base</td> <td class="text-right">$223,137</td> <td class="text-right">$223,137</td> </tr> <tr> <td>Wendake</td> <td><span lang="fr">Trottoir rue Chef Max Gros-Louis</span></td> <td>A-Base</td> <td class="text-right">$45,270</td> <td class="text-right">$45,270</td> </tr> </tbody> </table> </div> </section> <section> <h3>Ontario (ON) - Other Community Infrastructure Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>0154 - Iskatewizaagegan #39 Indepdnt Fnb</td> <td>ISKATEWIZAAGEGAN ALTERNATIVE LANDFILL SOLUTION #RJ4V</td> <td>A-Base</td> <td class="text-right">$167,200</td> <td class="text-right">$167,200</td> </tr> <tr> <td>0155 - Shoal Lake <abbr title="number">no</abbr> 40 Band</td> <td>SHOAL LAKE 40 ALTERNATIVE LANDFILL SOLUTION #RJR8</td> <td>A-Base</td> <td class="text-right">$182,200</td> <td class="text-right">$182,200</td> </tr> <tr> <td>0158 - Naotkamegwanning</td> <td>NAOTKAMEGWANNING SCHOOL FUEL SYSTEM UPGRADE #RJXN</td> <td>FuelTanks/A-Base</td> <td class="text-right">$302,834</td> <td class="text-right">$252,834</td> </tr> <tr> <td>0204 - North Caribou Lake Band</td> <td>DIESEL GENERATING STATIONS (DGS) #6153/RJ9V</td> <td>FMC</td> <td class="text-right">$1,526,000</td> <td class="text-right">$194,504</td> </tr> <tr> <td>0208 - Pikangikum Band</td> <td>PIKANGIKUM CAPITAL PLANNING STUDY #RDJN</td> <td>A-Base</td> <td class="text-right">$341,400</td> <td class="text-right">$20,400</td> </tr> <tr> <td>0209 - Kitchenuhmaykoosib Inninuwug</td> <td>KITCHENUHMAYKOOSIB SCHOOL TEACHERAGE FUEL TANK SYSTEM UPGRADE #RJ37</td> <td>FuelTanks/A-Base</td> <td class="text-right">$416,380</td> <td class="text-right">$367,080</td> </tr> <tr> <td>0213 - Muskrat Dam Lake Band</td> <td>DIESEL GENERATING STATIONS (DGS) Unit B Engine Replacement</td> <td>FMC</td> <td class="text-right">$833,538</td> <td class="text-right">$507,661</td> </tr> <tr> <td>0213 - Muskrat Dam Lake Band</td> <td>DIESEL GENERATING STATIONS (DGS) Engine Replacement</td> <td>FMC</td> <td class="text-right">$353,946</td> <td class="text-right">$353,946</td> </tr> <tr> <td>0215 - Fort Severn Band</td> <td>DIESEL GENERATING STATIONS (DGS)</td> <td>FMC</td> <td class="text-right">$127,350</td> <td class="text-right">$16,500</td> </tr> <tr> <td>0216 - Cat Lake Band</td> <td>DIESEL GENERATING STATIONS (DGS)</td> <td>FMC</td> <td class="text-right">$51,000</td> <td class="text-right">$51,000</td> </tr> <tr> <td>0217 - Wunnumin Lake First Nation</td> <td>DIESEL GENERATING STATIONS (DGS)</td> <td>FMC</td> <td class="text-right">$697,402</td> <td class="text-right">$132,842</td> </tr> <tr> <td>0218 - Dokis Band</td> <td>DOKIS - LITTLE FRENCH RIVER BRIDGE REHABILITATION</td> <td>A-Base</td> <td class="text-right">$633,951</td> <td class="text-right">$542,651</td> </tr> <tr> <td>0236 - Poplar Hill Band</td> <td>DIESEL GENERATING STATIONS (DGS)</td> <td>FMC</td> <td class="text-right">$73,000</td> <td class="text-right">$73,000</td> </tr> <tr> <td>0238 - North Spirit Lake Band</td> <td>DIESEL GENERATING STATIONS (DGS)</td> <td>FMC</td> <td class="text-right">$60,000</td> <td class="text-right">$60,000</td> </tr> <tr> <td>0239 - Neskantaga First Nation</td> <td>NESKANTAGA CAPITAL PLANNING STUDY</td> <td>A-Base</td> <td class="text-right">$75,000</td> <td class="text-right">$17,356</td> </tr> <tr> <td>0240 - Webequie</td> <td>WEBEQUIE SCHOOL FUEL TANK SYSTEM UPGRADE</td> <td>FuelTanks/A-Base</td> <td class="text-right">$199,000</td> <td class="text-right">$150,000</td> </tr> <tr> <td>0241 - Nibinamik First Nation Band</td> <td>DIESEL GENERATING STATIONS (DGS)</td> <td>FMC</td> <td class="text-right">$1,490,739</td> <td class="text-right">$676,162</td> </tr> <tr> <td>0325 - Kee-Way-Win Band</td> <td>DIESEL GENERATING STATIONS (DGS)</td> <td>FMC</td> <td class="text-right">$149,000</td> <td class="text-right">$149,000</td> </tr> <tr> <td>1033 - Nishnawbe-Aski-Nation</td> <td>NAN NORTHERN ONTARIO BROADBAND EXPANSION</td> <td>NCOF</td> <td class="text-right">$10,651,000</td> <td class="text-right">$2,000,000</td> </tr> <tr> <td>1075 - Shibogama Tribal Council</td> <td>NCOF - IPA TRANSFER TO HYDRO ONE REMOTES - PHASE 1</td> <td>NCOF</td> <td class="text-right">$100,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>1075 - Shibogama Tribal Council</td> <td>NCOF - WATAYNIKANEYAP POWER/CENTRAL CORRIDOR ENERGY GROUP GRID</td> <td>NCOF</td> <td class="text-right">$1,400,000</td> <td class="text-right">$1,400,000</td> </tr> <tr> <td>1075 - Shibogama Tribal Council</td> <td>SHIBOGAMA NORTHERN ONTARIO <abbr title="First Nation">FN</abbr> ENVIRONMENT CONFERENCE FUEL TRAINING PORTION</td> <td>FuelTanks/A-Base</td> <td class="text-right">$50,000</td> <td class="text-right">$50,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Manitoba (MB) - Other Community Infrastructure Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Ebb and Flow</td> <td>S565 Flood Protection - Permanent Dyke</td> <td>A-Base</td> <td class="text-right">$930,786</td> <td class="text-right">$490,956</td> </tr> <tr> <td>Fisher River</td> <td>S276 Personal Care home</td> <td><abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$4,620,712</td> <td class="text-right">$411,000</td> </tr> <tr> <td>Fort Alexander (sagkeeng)</td> <td>S282/6126 Personal Care Home</td> <td><abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$3,730,000</td> <td class="text-right">$199,500</td> </tr> <tr> <td>Fort Alexander (sagkeeng)</td> <td>S402 Shoreline Erosion</td> <td>Gathering Strength</td> <td class="text-right">$4,080,473</td> <td class="text-right">$160,000</td> </tr> <tr> <td>Interlake Reserves Tribal Council</td> <td>S617 Solid Waste Management</td> <td>FMC 40M</td> <td class="text-right">$252,430</td> <td class="text-right">$202,430</td> </tr> <tr> <td>Lake St Martin</td> <td>S613 Community Development</td> <td>FMC 40M</td> <td class="text-right">$324,262</td> <td class="text-right">$324,262</td> </tr> <tr> <td>O-Chi-Chak-Ko-Sipi</td> <td>S571 Flood Protection Permanent Dyke</td> <td><abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$4,677,332</td> <td class="text-right">$1,565,000</td> </tr> <tr> <td>Sioux Valley</td> <td>S566 Flood Protection - Permanent Dyke</td> <td><abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$1,437,637</td> <td class="text-right">$621,415</td> </tr> <tr> <td>Sioux Valley</td> <td>S209 Personal Care Home Upgrade</td> <td><abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$15,066,200</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Various</td> <td>S172 Winter Roads Ongoing Projects</td> <td>A-Base</td> <td class="text-right">$6,012,000</td> <td class="text-right">$6,012,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Saskatchewan (SK)- Other Community Infrastructure Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>BATC</td> <td>Solid Waste Transfer Stations</td> <td><abbr title="First Nation Infrastructure Fund">FNIF</abbr></td> <td class="text-right">$3,751,600</td> <td class="text-right">$267,800</td> </tr> <tr> <td>Carry the Kettle</td> <td>Flooding Road Repair</td> <td>EM</td> <td class="text-right">$6,566,000</td> <td class="text-right">$600,000</td> </tr> <tr> <td>Keeseekoose</td> <td>Flooding Road Repair</td> <td>EM</td> <td class="text-right">$690,600</td> <td class="text-right">$94,600</td> </tr> <tr> <td>Little Black Bear</td> <td>Flood Road Recovery</td> <td>EM</td> <td class="text-right">$600,100</td> <td class="text-right">$531,500</td> </tr> <tr> <td>Mistawasis</td> <td>Flooding Road Repair</td> <td>EM</td> <td class="text-right">$1,819,000</td> <td class="text-right">$350,000</td> </tr> <tr> <td>Muscowpetung</td> <td>Flooding Road Repair</td> <td>EM</td> <td class="text-right">$991,000</td> <td class="text-right">$250,000</td> </tr> <tr> <td>Poundmaker</td> <td>Flooding Road Repair</td> <td>EM</td> <td class="text-right">$1,140,000</td> <td class="text-right">$850,000</td> </tr> <tr> <td>Sturgeon Lake</td> <td>Fire Truck</td> <td>A-Base</td> <td class="text-right">$37,500</td> <td class="text-right">$37,500</td> </tr> <tr> <td>Sweetgrass</td> <td>Fire Hall Addition</td> <td>A-Base</td> <td class="text-right">$250,000</td> <td class="text-right">$250,000</td> </tr> <tr> <td>Whitecap Dakota</td> <td>Community Drainage</td> <td>A-Base</td> <td class="text-right">$1,100,000</td> <td class="text-right">$142,000</td> </tr> <tr> <td>Yellow Quill</td> <td>Solid Waste Transfer Stations</td> <td><abbr title="First Nation Infrastructure Fund">FNIF</abbr></td> <td class="text-right">$549,500</td> <td class="text-right">$16,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Alberta (AB) - Other Community Infrastructure Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Beaver Lake</td> <td>Beaver Lake Communication Towers</td> <td>A-Base</td> <td class="text-right">$38,000</td> <td class="text-right">$38,000</td> </tr> <tr> <td>Bigstone</td> <td>Bigstone - Infrastructure Improvements</td> <td>Infra Alloc</td> <td class="text-right">$458,200</td> <td class="text-right">$95,000</td> </tr> <tr> <td>Bigstone</td> <td>Bigstone - Infrastructure Improvements</td> <td>Infra Alloc</td> <td class="text-right">$458,200</td> <td class="text-right">$13,225</td> </tr> <tr> <td>Bigstone</td> <td>Bigstone - Infrastructure Improvements</td> <td>Infra Alloc</td> <td class="text-right">$458,200</td> <td class="text-right">$349,975</td> </tr> <tr> <td>Blood</td> <td>Blood Kanai Building Monitoring System</td> <td>A-Base</td> <td class="text-right">$136,000</td> <td class="text-right">$136,000</td> </tr> <tr> <td>Blood</td> <td>Blood Gravel Crushing and Vehicle Repairs</td> <td>A-Base</td> <td class="text-right">$173,000</td> <td class="text-right">$173,000</td> </tr> <tr> <td>Blood</td> <td>Blood Tribe Safety Officer Training</td> <td>A-Base</td> <td class="text-right">$13,780</td> <td class="text-right">$13,780</td> </tr> <tr> <td>Dene Tha'</td> <td>Dene Tha' Truck Repairs</td> <td>A-Base</td> <td class="text-right">$14,737</td> <td class="text-right">$14,737</td> </tr> <tr> <td>Ermineskin</td> <td>Ermineskin Community and Five Year Capital Plan</td> <td>Infra Alloc</td> <td class="text-right">$262,964</td> <td class="text-right">$89,016</td> </tr> <tr> <td>Ermineskin</td> <td>Ermineskin Fire Pumper Truck</td> <td>A-Base</td> <td class="text-right">$298,308</td> <td class="text-right">$298,308</td> </tr> <tr> <td>Fort McMurray</td> <td>Ft McMurray Comprehensive Community Plan</td> <td>A-Base</td> <td class="text-right">$130,000</td> <td class="text-right">$30,000</td> </tr> <tr> <td>Kehewin</td> <td>Kehewin Landfill Second Cell</td> <td>A-Base</td> <td class="text-right">$25,000</td> <td class="text-right">$25,000</td> </tr> <tr> <td>Little Red River Cree Nation</td> <td>LRRCN Fox Lake Gravel Hauling and Stockpiling</td> <td>Infra Alloc</td> <td class="text-right">$71,350</td> <td class="text-right">$71,350</td> </tr> <tr> <td>Louis Bull</td> <td>Louis Bull Transfer Station</td> <td>A-Base</td> <td class="text-right">$2,022,056</td> <td class="text-right">$299,782</td> </tr> <tr> <td>Lubicon Lake Band</td> <td>KTKN Lubicon Community Plan</td> <td>A-Base</td> <td class="text-right">$25,000</td> <td class="text-right">$25,000</td> </tr> <tr> <td>Montana</td> <td>Montana Solar Project</td> <td>A-Base</td> <td class="text-right">$323,050</td> <td class="text-right">$275,000</td> </tr> <tr> <td>Paul</td> <td>Paul Asset Maintenance &amp; Upgrades</td> <td>A-Base</td> <td class="text-right">$203,074</td> <td class="text-right">$203,074</td> </tr> <tr> <td>Paul</td> <td>Paul Solid Waste Management</td> <td>A-Base</td> <td class="text-right">$336,397</td> <td class="text-right">$86,397</td> </tr> <tr> <td>Piikani</td> <td>Piikani Well Head Road Repairs</td> <td>A-Base</td> <td class="text-right">$380,000</td> <td class="text-right">$113,000</td> </tr> <tr> <td>Piikani</td> <td>Piikani Equipment Purchase</td> <td>A-Base</td> <td class="text-right">$207,601</td> <td class="text-right">$207,601</td> </tr> <tr> <td>Saddle Lake</td> <td>Saddle Lake Landfill Expansion</td> <td>A-Base</td> <td class="text-right">$48,000</td> <td class="text-right">$48,000</td> </tr> <tr> <td>Samson</td> <td>Samson Major Maintenance Costs</td> <td>A-Base</td> <td class="text-right">$71,475</td> <td class="text-right">$71,475</td> </tr> <tr> <td>Stoney</td> <td>Stoney Major Vehicle Maintenance</td> <td>A-Base</td> <td class="text-right">$78,910</td> <td class="text-right">$78,910</td> </tr> <tr> <td>Stoney</td> <td>Stoney Transfer Station</td> <td>A-Base</td> <td class="text-right">$100,000</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Sturgeon Lake</td> <td>WCTC Sturgeon Lake Transfer Station Design</td> <td>A-Base</td> <td class="text-right">$228,000</td> <td class="text-right">$228,000</td> </tr> <tr> <td>Sunchild</td> <td>Sunchild Garbage Trucks</td> <td>A-Base</td> <td class="text-right">$121,090</td> <td class="text-right">$121,090</td> </tr> <tr> <td>Tsuu T'ina</td> <td>Tsuu T'ina Solid Waste Management</td> <td>A-Base</td> <td class="text-right">$1,842,933</td> <td class="text-right">$130,677</td> </tr> <tr> <td>Tsuu T'ina</td> <td>Tsuu T'ina Fire Trucks</td> <td>A-Base</td> <td class="text-right">$250,000</td> <td class="text-right">$250,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>British Columbia (CB) - Other Community Infrastructure Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Adams Lake Indian Band</td> <td>Fire Truck and Apparatus</td> <td>A-Base</td> <td class="text-right">$282,189</td> <td class="text-right">$147,141</td> </tr> <tr> <td>Alexis Creek Indian Band</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$47,663</td> <td class="text-right">$47,663</td> </tr> <tr> <td>Blueberry River First Nations</td> <td>ACRS Group 2 school #532 Kispiox</td> <td>A-Base</td> <td class="text-right">$59,455</td> <td class="text-right">$59,455</td> </tr> <tr> <td>Bridge River Indian Band</td> <td>FIRE TRUCK</td> <td>A-Base</td> <td class="text-right">$325,000</td> <td class="text-right">$22,462</td> </tr> <tr> <td>Dzawada'Enuxw First Nation</td> <td>Emergency Rock Slope Mitigation</td> <td>A-Base</td> <td class="text-right">$29,693</td> <td class="text-right">$29,693</td> </tr> <tr> <td>Dzawada'Enuxw First Nation</td> <td>Electrical Energy Audit</td> <td>A-Base</td> <td class="text-right">$46,125</td> <td class="text-right">$46,125</td> </tr> <tr> <td>Esk'Etemc</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$57,144</td> <td class="text-right">$57,144</td> </tr> <tr> <td>Fort Nelson First Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$189,742</td> <td class="text-right">$189,742</td> </tr> <tr> <td>Gitanmaax Indian Band</td> <td>New Fire Truck</td> <td>A-Base</td> <td class="text-right">$333,276</td> <td class="text-right">$157,276</td> </tr> <tr> <td>Gitga'At First Nation</td> <td>Fire Apparatus, and Equipment</td> <td>A-Base</td> <td class="text-right">$118,661</td> <td class="text-right">$56,795</td> </tr> <tr> <td>Gitga'At First Nation</td> <td>RCE House Wiring Upgrades</td> <td>A-Base</td> <td class="text-right">$355,200</td> <td class="text-right">$303,200</td> </tr> <tr> <td>Gitga'At First Nation</td> <td>RCE Generation System</td> <td>A-Base</td> <td class="text-right">$2,546,757</td> <td class="text-right">$191,566</td> </tr> <tr> <td>Gitga'At First Nation</td> <td>RCE Distribution Line Upgrade</td> <td>A-Base</td> <td class="text-right">$1,822,983</td> <td class="text-right">$1,822,983</td> </tr> <tr> <td>GIT-san</td> <td>ACRS Group 2 school #532 Kispiox)</td> <td>A-Base</td> <td class="text-right">$99,317</td> <td class="text-right">$99,317</td> </tr> <tr> <td>Gitxaala Nation</td> <td>Solid Waste Management Center</td> <td>A-Base</td> <td class="text-right">$1,888,603</td> <td class="text-right">$1,205,995</td> </tr> <tr> <td>Gwa'Sala-Nakwaxda'Xw Indian Band</td> <td>River Protection</td> <td>A-Base</td> <td class="text-right">$50,533</td> <td class="text-right">$50,533</td> </tr> <tr> <td>Halfway River First Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$46,638</td> <td class="text-right">$46,638</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Lot Development 19 Lots Bella Bella IR #1</td> <td>A-Base</td> <td class="text-right">$1,626,940</td> <td class="text-right">$100,000</td> </tr> <tr> <td>Kispiox Indian Band</td> <td>2013 Roadworks</td> <td>A-Base</td> <td class="text-right">$738,000</td> <td class="text-right">$555,131</td> </tr> <tr> <td>Kitasoo Indian Band</td> <td>Fuel Storage Tanks - 2013-2014 Kitasoo Fuel System Community Storage Tank Upgrade</td> <td>A-Base</td> <td class="text-right">$324,955</td> <td class="text-right">$324,955</td> </tr> <tr> <td>Klahoose First Nation</td> <td>Klahoose Community Building</td> <td>A-Base</td> <td class="text-right">$220,000</td> <td class="text-right">$220,000</td> </tr> <tr> <td>Kwadacha Indian Band</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$13,940</td> <td class="text-right">$13,940</td> </tr> <tr> <td>Kwadacha Indian Band</td> <td>Fuel Storage Tanks - 2013-2014 Kwadacha Powerhouse Fuel Tank Decommissioning</td> <td>A-Base</td> <td class="text-right">$16,600</td> <td class="text-right">$16,600</td> </tr> <tr> <td>Kwadacha Indian Band</td> <td>RCE Generation Kwadacha</td> <td>A-Base</td> <td class="text-right">$3,350,812</td> <td class="text-right">$179,326</td> </tr> <tr> <td>Kwadacha Indian Band</td> <td>RCE Distribution Line Upgrade</td> <td>A-Base</td> <td class="text-right">$1,494,647</td> <td class="text-right">$697,025</td> </tr> <tr> <td>Lake Babine Nation</td> <td>ACRS Group 2 school</td> <td>A-Base</td> <td class="text-right">$13,069</td> <td class="text-right">$13,069</td> </tr> <tr> <td>Lake Babine Nation</td> <td><abbr title="First Nation Infrastructure Fund">FNIF</abbr> Fort Babine Drainage Plan</td> <td>A-Base</td> <td class="text-right">$1,718,525</td> <td class="text-right">$49,969</td> </tr> <tr> <td>Lhoosk'Uz Dene Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$5,125</td> <td class="text-right">$5,125</td> </tr> <tr> <td>Lower Stl'Atl'Imx Tribal Council</td> <td>Douglas Lot Preparation</td> <td>A-Base</td> <td class="text-right">$198,000</td> <td class="text-right">$6,069</td> </tr> <tr> <td>Lower Stl'Atl'Imx Tribal Council</td> <td>Southern Communities Solid Waste Disposal</td> <td>A-Base</td> <td class="text-right">$1,200,000</td> <td class="text-right">$62,251</td> </tr> <tr> <td>Metlakatla Indian Band</td> <td>Metlakatla Transfer Station</td> <td>A-Base</td> <td class="text-right">$1,704,456</td> <td class="text-right">$423,973</td> </tr> <tr> <td>Mount Currie Indian Band</td> <td>Peq Creek Flood Mitigation</td> <td>A-Base</td> <td class="text-right">$576,312</td> <td class="text-right">$166,312</td> </tr> <tr> <td>Mount Currie Indian Band</td> <td>Birkenhead River Flood Mitigation</td> <td>A-Base</td> <td class="text-right">$388,000</td> <td class="text-right">$322,000</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - Hesquiaht Fuel Storage Tank Compliance Upgrade/ Hesquiaht Diesel Fuel and Waste Oil</td> <td>A-Base</td> <td class="text-right">$20,800</td> <td class="text-right">$20,800</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - 2013-2014 Tahltan Fuel System Upgrades</td> <td>A-Base</td> <td class="text-right">$6,613</td> <td class="text-right">$6,613</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - 2013-2014 Moricetown Fuel System Upgrades</td> <td>A-Base</td> <td class="text-right">$8,015</td> <td class="text-right">$8,015</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - 2013-2014 Kispiox Fuel System Upgrades</td> <td>A-Base</td> <td class="text-right">$6,000</td> <td class="text-right">$6,000</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - 2013-2014 Iskut Kluachon Centre and Klappen School Fuel System Upgrades)</td> <td>A-Base</td> <td class="text-right">$5,297</td> <td class="text-right">$5,297</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - 2013-2014 Gitwangak Fuel System Upgrades</td> <td>A-Base</td> <td class="text-right">$1,926</td> <td class="text-right">$1,926</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - 2013-2014 Gitanyow Fuel System Upgrades</td> <td>A-Base</td> <td class="text-right">$8,442</td> <td class="text-right">$8,442</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Sto:lo Bulk Fuel and Dispensing System Code Upgrades</td> <td>A-Base</td> <td class="text-right">$444,001</td> <td class="text-right">$444,001</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - Saik'uz First Nation, Stoney Creek IR 3 Band Bulk Fuel System</td> <td>A-Base</td> <td class="text-right">$149,000</td> <td class="text-right">$149,000</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - 2013-2014 Wuikinuxv Bulk Fuel Storage Tank, Fuel System Upgrades</td> <td>A-Base</td> <td class="text-right">$66,126</td> <td class="text-right">$66,126</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - 2013-2014 Nadleh Whut'en Fuel System Upgrade</td> <td>A-Base</td> <td class="text-right">$111,000</td> <td class="text-right">$111,000</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - 2013-2014 Lheidli T'enneh Works Yard Fuel System upgrade</td> <td>A-Base</td> <td class="text-right">$192,000</td> <td class="text-right">$192,000</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Fuel Storage Tanks - 2013-2014 Kayukth Fuel Delivery System</td> <td>A-Base</td> <td class="text-right">$197,000</td> <td class="text-right">$197,000</td> </tr> <tr> <td>Nuchatlaht Band</td> <td>Nuchatlaht Fair Harbour Road Improvements</td> <td>A-Base</td> <td class="text-right">$813,033</td> <td class="text-right">$13,033</td> </tr> <tr> <td>Pacheedaht First Nation</td> <td>Multipurpose Building Upgrade</td> <td>A-Base</td> <td class="text-right">$546,069</td> <td class="text-right">$40,049</td> </tr> <tr> <td>Penelakut Tribe</td> <td>Fire Hall and Truck - Kuper Island IR #7</td> <td>A-Base</td> <td class="text-right">$965,495</td> <td class="text-right">$102,516</td> </tr> <tr> <td>Prophet River First Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$10,660</td> <td class="text-right">$10,660</td> </tr> <tr> <td>Prophet River First Nation</td> <td>Prophet River Multiplex</td> <td>A-Base</td> <td class="text-right">$6,146,440</td> <td class="text-right">$200,000</td> </tr> <tr> <td>Saik'Uz First Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$29,520</td> <td class="text-right">$29,520</td> </tr> <tr> <td>Saulteau First Nations</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$15,888</td> <td class="text-right">$15,888</td> </tr> <tr> <td>Seabird Island Indian Band</td> <td>Fraser River Flood and Erosion Protection</td> <td>A-Base</td> <td class="text-right">$1,000,000</td> <td class="text-right">$65,160</td> </tr> <tr> <td>Shxw'Ow'Hamel First Nation</td> <td>Subdivision and Infrastructure Upgrades Ohamil IR 1</td> <td>A-Base</td> <td class="text-right">$526,356</td> <td class="text-right">$201,999</td> </tr> <tr> <td>Skeetchestn Indian Band</td> <td>Fire Protection Truck and Equipment Upgrades</td> <td>A-Base</td> <td class="text-right">$337,669</td> <td class="text-right">$168,217</td> </tr> <tr> <td>Skidegate Indian Band</td> <td>Slarkedus Lake Dam Access Road</td> <td>A-Base</td> <td class="text-right">$743,245</td> <td class="text-right">$743,245</td> </tr> <tr> <td>Soda Creek Indian Band</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$9,225</td> <td class="text-right">$9,225</td> </tr> <tr> <td>Squamish Indian Band</td> <td>Construction of Road &quot;A&quot; Extension and Lot Infill - IR#1</td> <td>A-Base</td> <td class="text-right">$207,265</td> <td class="text-right">$207,265</td> </tr> <tr> <td>Squiala First Nation</td> <td>Squiala Community Centre</td> <td>A-Base</td> <td class="text-right">$4,460,988</td> <td class="text-right">$200,000</td> </tr> <tr> <td>Stswecem'C Xgat'Tem First Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$146,105</td> <td class="text-right">$146,105</td> </tr> <tr> <td>Stz'Uminus First Nation</td> <td>Fire Hydrant Coverage IR 13</td> <td>A-Base</td> <td class="text-right">$587,250</td> <td class="text-right">$18,905</td> </tr> <tr> <td>Takla Lake First Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$49,713</td> <td class="text-right">$49,713</td> </tr> <tr> <td>Tl'Etinqox Government</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$43,768</td> <td class="text-right">$43,768</td> </tr> <tr> <td>Tl'Etinqox Government</td> <td>Dam Improvements Review 2013</td> <td>A-Base</td> <td class="text-right">$30,484</td> <td class="text-right">$30,484</td> </tr> <tr> <td>Toosey Indian Band</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$95,274</td> <td class="text-right">$95,274</td> </tr> <tr> <td>Toosey Indian Band</td> <td>Toosey Reservoir - Dam Reconstruction</td> <td>A-Base</td> <td class="text-right">$2,510,108</td> <td class="text-right">$149,108</td> </tr> <tr> <td>Tsawout First Nation</td> <td>Flood and Erosion Mitigation - Beach Road Infrastructure</td> <td>A-Base</td> <td class="text-right">$52,224</td> <td class="text-right">$52,224</td> </tr> <tr> <td>West Moberly First Nations</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$13,889</td> <td class="text-right">$13,889</td> </tr> <tr> <td>Whispering Pines/Clinton Indian Band</td> <td>Emergency Dyke Erosion Repairs</td> <td>A-Base</td> <td class="text-right">$1,765,926</td> <td class="text-right">$683,547</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>Fire Truck Replacement, Equipment &amp; Training</td> <td>A-Base</td> <td class="text-right">$600,000</td> <td class="text-right">$135,000</td> </tr> <tr> <td>Williams Lake Indian Band</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$67,548</td> <td class="text-right">$67,548</td> </tr> <tr> <td>Xeni Gwet'In First Nations Government</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$51,045</td> <td class="text-right">$51,045</td> </tr> <tr> <td>Yunesit'In Government</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$112,200</td> <td class="text-right">$112,200</td> </tr> </tbody> </table> </div> </section> <section> <h3>Yukon (YK) - Other Community Infrastructure Projects Completed</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Daylu Dena Council</td> <td><abbr title="First Nations' Emergency Services Society">FNESS</abbr> Training</td> <td>Gathering Strength</td> <td class="text-right">$73,300</td> <td class="text-right">$73,300</td> </tr> <tr> <td>Ross River Dena Council</td> <td>Replace Fuel Tank</td> <td>Fuel Tanks</td> <td class="text-right">$95,633</td> <td class="text-right">$95,633</td> </tr> </tbody> </table> </div> </section> <section> <h3>Atlantic (AT) - Other Community Infrastructure Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Lennox Island <abbr title="First Nation">FN</abbr></td> <td>Road &amp; Bridges</td> <td>A-Base</td> <td class="text-right">$2,757,891</td> <td class="text-right">$66,103</td> </tr> <tr> <td>Shubenacadie</td> <td>Response</td> <td>EM</td> <td class="text-right">$504,163</td> <td class="text-right">$504,163</td> </tr> <tr> <td>Tobique <abbr title="First Nation">FN</abbr></td> <td>Housing Policy</td> <td>A-Base</td> <td class="text-right">$34,000</td> <td class="text-right">$34,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Québec (QC) - Other Community Infrastructure Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Barriere Lake</td> <td><span lang="fr">Carburant pour génératrice</span></td> <td>A-Base</td> <td class="text-right">$937,300</td> <td class="text-right">$937,300</td> </tr> <tr> <td><span lang="fr">Divers</span></td> <td><span lang="fr">Ajustements des actifs</span></td> <td>A-Base / <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td class="text-right">$1,047,810</td> <td class="text-right">$1,047,810</td> </tr> <tr> <td><span lang="fr">Divers</span></td> <td>Inspections SCRB</td> <td>A-Base / <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td class="text-right">$377,108</td> <td class="text-right">$377,108</td> </tr> <tr> <td>Kitig.Zibi</td> <td><span lang="fr">Réservoir pétrolier</span></td> <td>A-Base</td> <td class="text-right">$58,630</td> <td class="text-right">$58,630</td> </tr> </tbody> </table> </div> </section> <section> <h3>Ontario (ON) - Other Community Infrastructure Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>0141 - <span lang="fr">Beausoleil</span> Band</td> <td>MV CLEARWATER PASSENGER VEHICLE FERRY PURCHASE #RC3V</td> <td>A-Base</td> <td class="text-right">$1,817,500</td> <td class="text-right">$1,090,633</td> </tr> <tr> <td>0180 - Aundeck-Omni-Kaning</td> <td>LANDFILL SITE (90/10% C/S HISTORICAL) #RC60</td> <td>A-Base</td> <td class="text-right">$300,000</td> <td class="text-right">$42,222</td> </tr> <tr> <td>0181 - M'chigeeng First Nation</td> <td>LANDFILL SITE (49096) (90/10% C/S HISTORICAL) #RC52</td> <td>A-Base</td> <td class="text-right">$355,800</td> <td class="text-right">$50,000</td> </tr> <tr> <td>0181 - M'chigeeng First Nation</td> <td>MCHIGEENG SCHOOL FUEL SYSTEM UPGRADE #RJW1</td> <td>FuelTanks/A-Base</td> <td class="text-right">$424,200</td> <td class="text-right">$358,600</td> </tr> <tr> <td>0183 - Eabametoong 1st Nation Indian Band</td> <td>EABAMETOONG EAST DEVELOPMENT STUDY - CAPITAL PLANNING STUDY UPDATE #RIK7</td> <td>A-Base</td> <td class="text-right">$127,114</td> <td class="text-right">$21,274</td> </tr> <tr> <td>0183 - Eabametoong 1st Nation Indian Band</td> <td>DIESEL GENERATING STATIONS (DGS) #6153/RJAF/RH1V/RJPR</td> <td>FMC</td> <td class="text-right">$1,696,756</td> <td class="text-right">$762,496</td> </tr> <tr> <td>0186 - Marten Falls Band</td> <td>DIESEL GENERATING STATIONS (DGS) #REOR/6153</td> <td>FMC</td> <td class="text-right">$5,351,000</td> <td class="text-right">$30,000</td> </tr> <tr> <td>0204 - North Caribou Lake Band</td> <td>DIESEL GENERATING STATIONS (DGS) #6153/RJSK</td> <td>FMC</td> <td class="text-right">$150,000</td> <td class="text-right">$20,000</td> </tr> <tr> <td>0206 - Wapekeka Band</td> <td>WAPEKEKA - AIRPORT BULK FUEL FACILITY UPGRADE #RKN7</td> <td>FuelTanks/A-Base</td> <td class="text-right">$750,000</td> <td class="text-right">$90,000</td> </tr> <tr> <td>0206 - Wapekeka Band</td> <td>DIESEL GENERATING STATIONS (DGS) #6153</td> <td>FMC</td> <td class="text-right">$150,000</td> <td class="text-right">$20,000</td> </tr> <tr> <td>0207 - Bearskin Lake Band</td> <td>BEARSKIN LAKE CORE FACILITY FUEL SYSTEM UPGRADE #RJY7</td> <td>FuelTanks/A-Base</td> <td class="text-right">$726,927</td> <td class="text-right">$671,927</td> </tr> <tr> <td>0209 - Kitchenuhmaykoosib Inninuwug</td> <td>KITCHENUHMAYKOOSIB BULK FUEL TANK FARM UPGRADE #RJEV</td> <td>FuelTanks/A-Base</td> <td class="text-right">$1,400,000</td> <td class="text-right">$61,180</td> </tr> <tr> <td>0210 - Kasabonika Lake Band</td> <td>DIESEL GENERATING STATIONS (DGS) #6153/RD9R</td> <td>FMC</td> <td class="text-right">$11,992,750</td> <td class="text-right">$4,000,000</td> </tr> <tr> <td>0210 - Kasabonika Lake Band</td> <td>KASABONIKA FUEL SYSTEM UPGRADE SCHOOL BULK FUEL FACILITY #RJ11</td> <td>FuelTanks/A-Base</td> <td class="text-right">$1,485,000</td> <td class="text-right">$878,596</td> </tr> <tr> <td>0212 - Kingfisher Band</td> <td>KINGFISHER WATER TREATMENT PLANT FUEL SYSTEM REPAIRS</td> <td>FuelTanks/A-Base</td> <td class="text-right">$102,000</td> <td class="text-right">$70,000</td> </tr> <tr> <td>0212 - Kingfisher Band</td> <td>DIESEL GENERATING STATIONS (DGS)</td> <td>FMC</td> <td class="text-right">$150,000</td> <td class="text-right">$20,000</td> </tr> <tr> <td>0213 - Muskrat Dam Lake Band</td> <td>MUSKRAT DAM SCHOOL FUEL TANK STORAGE SYSTEM UPGRADE</td> <td>FuelTanks/A-Base</td> <td class="text-right">$950,000</td> <td class="text-right">$50,000</td> </tr> <tr> <td>0214 - Sachigo Lake Band</td> <td>WINDIGO FUEL TANKS AND WASTE OIL CLEANUP PROJECT</td> <td>FuelTanks/A-Base</td> <td class="text-right">$5,332,000</td> <td class="text-right">$2,571,525</td> </tr> <tr> <td>0215 - Fort Severn Band</td> <td>FORT SEVERN BULK FUEL TANK FARM UPGRADE</td> <td>FuelTanks/A-Base</td> <td class="text-right">$7,137,316</td> <td class="text-right">$1,043,744</td> </tr> <tr> <td>0217 - Wunnumin Lake First Nation</td> <td>WUNNUMIN FUEL SYSTEM UPGRADE TANK DECOMMISSIONING</td> <td>FuelTanks/A-Base</td> <td class="text-right">$200,000</td> <td class="text-right">$41,500</td> </tr> <tr> <td>0226 - Mattagami Band</td> <td>MATTAGAMI SCHOOL FUEL SYSTEM UPGRADE</td> <td>FuelTanks/A-Base</td> <td class="text-right">$400,000</td> <td class="text-right">$35,000</td> </tr> <tr> <td>0230 - Whitefish River Band</td> <td>WHITEFISH RIVER SCHOOL FUEL SYSTEM UPGRADE</td> <td>FuelTanks/A-Base</td> <td class="text-right">$200,000</td> <td class="text-right">$180,000</td> </tr> <tr> <td>0234 - Wawakapewin Band</td> <td>WAWAKAPEWIN DGS SITE FUEL TANK UPGRADE</td> <td>FuelTanks/A-Base</td> <td class="text-right">$1,454,712</td> <td class="text-right">$113,312</td> </tr> <tr> <td>0237 - Deer Lake Band</td> <td>DEER LAKE CORE FACILITIES FUEL SYSTEM UPGRADE</td> <td>FuelTanks/A-Base</td> <td class="text-right">$766,000</td> <td class="text-right">$655,952</td> </tr> <tr> <td>0237 - Deer Lake Band</td> <td>DIESEL GENERATING STATIONS (DGS)</td> <td>FMC</td> <td class="text-right">$150,000</td> <td class="text-right">$20,000</td> </tr> <tr> <td>0240 - Webequie</td> <td>DIESEL GENERATING STATIONS (DGS)</td> <td>FMC</td> <td class="text-right">$16,909,727</td> <td class="text-right">$28,500</td> </tr> <tr> <td>0242 - Aroland First Nation</td> <td>AROLAND SCHOOL FUEL SYSTEM UPGRADE</td> <td>FuelTanks/A-Base</td> <td class="text-right">$300,000</td> <td class="text-right">$10,000</td> </tr> <tr> <td>0243 - Kashechewan Band</td> <td>Ring Dyck <abbr title="Operating and Maintenance">O&amp;M</abbr></td> <td>A-Base</td> <td class="text-right">$210,000</td> <td class="text-right">$70,000</td> </tr> <tr> <td>0243 - Kashechewan Band</td> <td>KASHECHEWAN FAR FIELD STUDY</td> <td>A-Base</td> <td class="text-right">$2,201,500</td> <td class="text-right">$400,000</td> </tr> <tr> <td>0259 - Slate Falls Nation Band</td> <td>SLATE FALLS BULK FUEL TANK FARM UPGRADE</td> <td>FuelTanks/A-Base</td> <td class="text-right">$570,000</td> <td class="text-right">$495,300</td> </tr> <tr> <td>1003 - Keewaytinook Okimakanak Tribl Coun</td> <td>KO (3) COMMUNITY PROJECT (KEEWAYWIN NORTH SPIRIT LAKE POPLAR HILL)</td> <td>FuelTanks/A-Base</td> <td class="text-right">$950,000</td> <td class="text-right">$850,500</td> </tr> <tr> <td>8069 - Pritchard Industrial, A Division Of The Pritchard Group</td> <td>DIESEL GENERATING STATIONS (DGS)</td> <td>FMC</td> <td class="text-right">$1,440,711</td> <td class="text-right">$466,250</td> </tr> <tr> <td>9238 - Ont. First Nations Technical Servs</td> <td><abbr title="Ontario First Nations Technical Services Corporation">OFNTSC</abbr> COMMUNITY FUEL TANK</td> <td>FuelTanks/A-Base</td> <td class="text-right">$1,100,000</td> <td class="text-right">$440,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>Manitoba (MB) - Other Community Infrastructure Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Dakota Ojibway Tribal Council</td> <td>ACRS Inspections</td> <td>A-Base</td> <td class="text-right">$389,857</td> <td class="text-right">$389,857</td> </tr> <tr> <td>Dauphin River</td> <td>S610 Community Reoccupation</td> <td>FMC 40M</td> <td class="text-right">$8,942,344</td> <td class="text-right">$6,177,500</td> </tr> <tr> <td>Lake Manitoba</td> <td>S570 Flood Protection Dyke Works Const</td> <td>FMC</td> <td class="text-right">$16,186,530</td> <td class="text-right">$2,147,824</td> </tr> <tr> <td>Manitoba Hydro</td> <td>S228 Diesel Generation</td> <td><abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$20,430,176</td> <td class="text-right">$4,089,915</td> </tr> <tr> <td>Marcel Colomb</td> <td>S602 Six Bay Garage</td> <td><abbr title="First Nations Water and Wastewater Action Plan">FNWWAP</abbr>/FMC</td> <td class="text-right">$1,562,732</td> <td class="text-right">$600,000</td> </tr> <tr> <td>Shawano</td> <td>S406 Fuel Tanks</td> <td>A-Base/Budget 2012/<abbr title="Headquarters">HQ</abbr></td> <td class="text-right">$80,000,000</td> <td class="text-right">$9,414,866</td> </tr> </tbody> </table> </div> </section> <section> <h3>Saskatchewan (SK)- Other Community Infrastructure Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Beardy's &amp; Okemasis</td> <td>Flooding Road Repair</td> <td>EM</td> <td class="text-right">$1,703,000</td> <td class="text-right">$180,535</td> </tr> <tr> <td>Birch Narrows</td> <td>Subdivision Bridge</td> <td>A-Base</td> <td class="text-right">$4,373,500</td> <td class="text-right">$200,000</td> </tr> <tr> <td>Cote</td> <td>Fire Hall and Equipment</td> <td>A-Base</td> <td class="text-right">$230,000</td> <td class="text-right">$50,000</td> </tr> <tr> <td>FHQ Member <abbr title="First Nation">FN</abbr>'s</td> <td>Fire Hall</td> <td>A-Base</td> <td class="text-right">$550,000</td> <td class="text-right">$50,000</td> </tr> <tr> <td>James Smith</td> <td>Flooding Road Repair</td> <td>EM</td> <td class="text-right">$10,000,000</td> <td class="text-right">$377,700</td> </tr> <tr> <td>James Smith</td> <td>Fire Truck and Equipment</td> <td>A-Base</td> <td class="text-right">$52,500</td> <td class="text-right">$10,000</td> </tr> <tr> <td>Ministikwan Lake</td> <td>Fire Protection</td> <td>A-Base</td> <td class="text-right">$442,500</td> <td class="text-right">$117,500</td> </tr> <tr> <td>Mistawasis</td> <td>Gasification</td> <td>A-Base</td> <td class="text-right">$2,010,800</td> <td class="text-right">$1,137,800</td> </tr> <tr> <td>Montreal Lake</td> <td>Flooding Road Repair</td> <td>EM</td> <td class="text-right">$5,000,000</td> <td class="text-right">$500,000</td> </tr> <tr> <td>Red Earth</td> <td>Emergency Bridge Repair</td> <td>A-Base</td> <td class="text-right">$2,319,600</td> <td class="text-right">$250,000</td> </tr> <tr> <td>Sakimay</td> <td>Flooding Road Repair</td> <td>EM</td> <td class="text-right">$3,455,000</td> <td class="text-right">$1,207,500</td> </tr> </tbody> </table> </div> </section> <section> <h3>Alberta (AB) - Other Community Infrastructure Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>Little Red River Cree Nation</td> <td>LRRCN Fox Lake Access Road</td> <td>A-Base/infra alloc</td> <td class="text-right">$1,269,473</td> <td class="text-right">$250,823</td> </tr> <tr> <td>Stoney</td> <td>Stoney Flood Relief (Note: funded under EM Auth 330)</td> <td>EMA</td> <td class="text-right">$561,650</td> <td class="text-right">$561,650</td> </tr> <tr> <td>Whitefish Lake #128</td> <td>Whitefish Lake #128 Arterial Road Upgrade</td> <td>A-Base</td> <td class="text-right">$4,769,745</td> <td class="text-right">$198,000</td> </tr> </tbody> </table> </div> </section> <section> <h3>British Columbia (CB) - Other Community Infrastructure Projects In-Progress</h3> <div class="table-responsive col-md-12"> <table class="table table-bordered table-condensed table-hover small"> <colgroup> <col class="col-md-3"> <col class="col-md-3"> <col class="col-md-2"> <col class="col-md-2"> <col class="col-md-2"> </colgroup> <thead> <tr class="active"> <th scope="col">First Nation</th> <th scope="col">Project Name</th> <th scope="col">Funding Source</th> <th scope="col">Total Cost ($)<br> (All Sources)</th> <th scope="col">2013-2014<br> Amount Funded</th> </tr> </thead> <tbody> <tr> <td>?Esdilagh First Nation</td> <td>?Esdilagh Waste transfer System</td> <td>A-Base</td> <td class="text-right">$500,000</td> <td class="text-right">$169,218</td> </tr> <tr> <td>?Esdilagh First Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$13,325</td> <td class="text-right">$13,325</td> </tr> <tr> <td>Bonaparte Indian Band</td> <td>Northwest Subdivision (Settlement Agreement)</td> <td>A-Base</td> <td class="text-right">$2,945,081</td> <td class="text-right">$793,102</td> </tr> <tr> <td>Cheslatta Carrier Nation Band</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$33,518</td> <td class="text-right">$33,518</td> </tr> <tr> <td>Douglas Indian Band</td> <td>Tipella Subdivision 25 Lots - 630</td> <td>A-Base</td> <td class="text-right">$1,461,054</td> <td class="text-right">$200,000</td> </tr> <tr> <td>Dzawada'Enuxw First Nation</td> <td>Kingcome Access Health &amp; Safety Road Improvements</td> <td>A-Base</td> <td class="text-right">$115,368</td> <td class="text-right">$105,135</td> </tr> <tr> <td>Esk'Etemc</td> <td>Dam Improvements Review</td> <td>A-Base</td> <td class="text-right">$6,888</td> <td class="text-right">$6,888</td> </tr> <tr> <td>Gitga'At First Nation</td> <td>Drainage Plan</td> <td>A-Base</td> <td class="text-right">$262,660</td> <td class="text-right">$188,140</td> </tr> <tr> <td>Gwa'Sala-Nakwaxda'Xw Indian Band</td> <td>Solid Waste Management Program</td> <td>A-Base</td> <td class="text-right">$112,076</td> <td class="text-right">$97,457</td> </tr> <tr> <td>Heiltsuk Indian Band</td> <td>Heiltsuk Fire Hall</td> <td>A-Base</td> <td class="text-right">$563,098</td> <td class="text-right">$563,098</td> </tr> <tr> <td>Hesquiaht Band</td> <td>Community Infrastructure Upgrades</td> <td>A-Base</td> <td class="text-right">$61,500</td> <td class="text-right">$61,500</td> </tr> <tr> <td>Kwadacha Indian Band</td> <td>Kwadacha Solid Waste Management Centre</td> <td>A-Base</td> <td class="text-right">$1,413,773</td> <td class="text-right">$859,393</td> </tr> <tr> <td>Lhtako Dene Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$410</td> <td class="text-right">$410</td> </tr> <tr> <td>Lower Stl'Atl'Imx Tribal Council</td> <td>In-SHUCK-ch Forest Service Road Upgrade</td> <td>A-Base</td> <td class="text-right">$4,200,000</td> <td class="text-right">$1,791,000</td> </tr> <tr> <td>Lower Stl'Atl'Imx Tribal Council</td> <td>Flood Level Study</td> <td>A-Base</td> <td class="text-right">$126,461</td> <td class="text-right">$24,761</td> </tr> <tr> <td>Lower Stl'Atl'Imx Tribal Council</td> <td>Fire Protection</td> <td>A-Base</td> <td class="text-right">$85,142</td> <td class="text-right">$24,111</td> </tr> <tr> <td>Matsqui Indian Band</td> <td>IR # 2 Subdivision (580) (18 lots)</td> <td>A-Base</td> <td class="text-right">$3,515,034</td> <td class="text-right">$176,071</td> </tr> <tr> <td>Musqueam Indian Band</td> <td>Lot Grading - 268-1</td> <td>A-Base</td> <td class="text-right">$45,327</td> <td class="text-right">$25,000</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Metals Removal Tsay Keh and Kwadacha</td> <td>A-Base</td> <td class="text-right">$204,771</td> <td class="text-right">$63,745</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>COASTAL SOLID WASTE - HARTLEY BAY</td> <td>A-Base</td> <td class="text-right">$712,754</td> <td class="text-right">$141,074</td> </tr> <tr> <td>Naut'Sa Mawt Tribal Council</td> <td>Coastal First Nations Hazardous Waste Removal</td> <td>A-Base</td> <td class="text-right">$310,912</td> <td class="text-right">$310,912</td> </tr> <tr> <td>Nazko First Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$47,150</td> <td class="text-right">$47,150</td> </tr> <tr> <td>Nisga'A Village Of Gitwinksihlkw</td> <td>Replacement Fire Hall</td> <td>A-Base</td> <td class="text-right">$600,000</td> <td class="text-right">$126,665</td> </tr> <tr> <td>Okanagan Indian Band</td> <td>Pinaus Lake Dam - Safety Review and Design - Okanagan</td> <td>A-Base</td> <td class="text-right">$940,046</td> <td class="text-right">$128,625</td> </tr> <tr> <td>Oweekeno/Wuikinuxv Nation</td> <td>Mini Hydro Plant - Nicknaqueet River</td> <td>A-Base</td> <td class="text-right">$1,000,000</td> <td class="text-right">$77,050</td> </tr> <tr> <td>Oweekeno/Wuikinuxv Nation</td> <td>Energy Audit</td> <td>A-Base</td> <td class="text-right">$30,711</td> <td class="text-right">$30,711</td> </tr> <tr> <td>Oweekeno/Wuikinuxv Nation</td> <td>New Wharf and Floats</td> <td>A-Base</td> <td class="text-right">$2,063,768</td> <td class="text-right">$1,068,268</td> </tr> <tr> <td>Penticton Indian Band</td> <td>Brent and Farleigh Lake Dams</td> <td>A-Base</td> <td class="text-right">$241,310</td> <td class="text-right">$66,974</td> </tr> <tr> <td>Penticton Indian Band</td> <td>Dams and Works</td> <td>A-Base</td> <td class="text-right">$3,863,055</td> <td class="text-right">$3,047,507</td> </tr> <tr> <td>Seton Lake Indian Band</td> <td>Solid Waste Management Centre - Seton Lake</td> <td>A-Base</td> <td class="text-right">$1,000,000</td> <td class="text-right">$60,629</td> </tr> <tr> <td>Skeetchestn Indian Band</td> <td>Skeetchestn Solid Waste Management</td> <td>A-Base</td> <td class="text-right">$914,690</td> <td class="text-right">$888,652</td> </tr> <tr> <td>Sliammon Indian Band</td> <td>Subdivision IR#1 - 610</td> <td>A-Base</td> <td class="text-right">$1,999,999</td> <td class="text-right">$154,516</td> </tr> <tr> <td>Stswecem'C Xgat'Tem First Nation</td> <td>Fire Equipment</td> <td>A-Base</td> <td class="text-right">$321,321</td> <td class="text-right">$21,321</td> </tr> <tr> <td>Takla Lake First Nation</td> <td>Standby Power Supply</td> <td>A-Base</td> <td class="text-right">$295,149</td> <td class="text-right">$186,356</td> </tr> <tr> <td>Tl'Azt'En Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$172,969</td> <td class="text-right">$172,969</td> </tr> <tr> <td>Tl'Etinqox Government</td> <td>Anaham Creek Dam</td> <td>A-Base</td> <td class="text-right">$1,216,259</td> <td class="text-right">$300,000</td> </tr> <tr> <td>Tsay Keh Dene Band</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$115,518</td> <td class="text-right">$115,518</td> </tr> <tr> <td>Tsay Keh Dene Band</td> <td>RCE Distribution Line Upgrade</td> <td>A-Base</td> <td class="text-right">$1,255,066</td> <td class="text-right">$627,088</td> </tr> <tr> <td>Ulkatcho Indian Band</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$107,090</td> <td class="text-right">$107,090</td> </tr> <tr> <td>Wet Suwet En First Nation</td> <td>Health and Community Building</td> <td>A-Base</td> <td class="text-right">$1,370,670</td> <td class="text-right">$200,000</td> </tr> <tr> <td>Xeni Gwet'In First Nations Government</td> <td>West End Electrification</td> <td>A-Base</td> <td class="text-right">$21,500</td> <td class="text-right">$21,500</td> </tr> <tr> <td>Yekooche First Nation</td> <td>ACRS Group 2</td> <td>A-Base</td> <td class="text-right">$11,173</td> <td class="text-right">$11,173</td> </tr> </tbody> </table> </div> </section> </section> <!-- ANNEX D END --> <!-- ANNEX E START --> <section> <div class="clearfix">&nbsp;</div> <h2 id="a42" class="mrgn-tp-md">Annex E: Glossary of Acronyms and Terms</h2> <table class="table table-bordered table-condensed small"> <colgroup> <col class="col-md-3"> <col class="col-md-9"> </colgroup> <thead> <tr class="active"> <th scope="col">Acronym</th> <th scope="col">In Full</th> </tr> </thead> <tbody> <tr> <td>AANDC</td> <td>Aboriginal Affairs and Northern Development Canada</td> </tr> <tr> <td>ACRS</td> <td>Asset Condition Reporting System</td> </tr> <tr> <td>API</td> <td>Annual Performance Inspection</td> </tr> <tr> <td>BCF</td> <td>Building Canada Fund</td> </tr> <tr> <td>CFMP</td> <td>Capital Facilities and Maintenance Program</td> </tr> <tr> <td>CRTP</td> <td>Circuit Rider Training Program</td> </tr> <tr> <td>EAP</td> <td>Economic Action Plan</td> </tr> <tr> <td>FNIF</td> <td>First Nation Infrastructure Fund</td> </tr> <tr> <td>FNIIP</td> <td>First Nations Infrastructure Investment Plan</td> </tr> <tr> <td>FNWWAP</td> <td>First Nations Water and Wastewater Action Plan</td> </tr> <tr> <td>GCR</td> <td>General Condition Rating</td> </tr> <tr> <td>GTF</td> <td>Gas Tax Fund</td> </tr> <tr> <td>MCF</td> <td>Management Control Framework</td> </tr> <tr> <td>NPRF</td> <td>National Priority Ranking Framework</td> </tr> <tr> <td>PAA</td> <td>Program Alignment Architecture</td> </tr> <tr> <td>SPRF</td> <td>School Priority Ranking Framework</td> </tr> </tbody> </table> <table class="table table-bordered table-condensed small"> <colgroup> <col class="col-md-3"> <col class="col-md-9"> </colgroup> <thead> <tr class="active"> <th scope="col">Term</th> <th scope="col">Definition</th> </tr> </thead> <tbody> <tr> <td>A-Base or Base Budget</td> <td>A recurring set of funds provided to a department at the onset of each budget period. The base budget is used to keep the department functioning, and is derived from the previous year's spending and adjustments such as inflation. It is not designed to fund special projects.</td> </tr> <tr> <td>Major Capital</td> <td>Funding allocated for specific proposal-driven construction, acquisition, renovation or significant repair projects valued above $1.5&nbsp;million.</td> </tr> <tr> <td>Minor Capital</td> <td>Can either be formula-based or proposal-driven funding. This funding is typically allocated for on reserve housing and for construction, acquisition, renovation and/or repair projects of community infrastructure valued below $1.5&nbsp;million.</td> </tr> <tr> <td>Operations and Maintenance (<abbr title="Operating and Maintenance">O&amp;M</abbr>)</td> <td>Formula-based funding specifically allocated for the on-going operation and maintenance of community Infrastructure assets as well as First Nation Training.</td> </tr> <tr> <td>Statutory</td> <td>These are expenditures provided for on an ongoing basis by way of legislation other than the <cite>Appropriation Act</cite> and cannot be altered by the House of Commons during its consideration of the Estimates.</td> </tr> <tr> <td>Targeted Funding</td> <td>New financial resources provided by the federal government to a department to be spent on specified areas; in most cases, this funding is time limited.</td> </tr> <tr> <td>Vote</td> <td>Refers to the amount of funding approved by Parliament through the annual <cite>Appropriation Act</cite>. This provides government departments or agencies with the authority required to spend money for a specific purpose. Each budgetary item, or vote, has two essential components: an amount of money and a destination (a description of what the money will be used for).</td> </tr> <tr> <td>Vote&nbsp;1</td> <td>(Operating Budget) Includes expenditures such as: salaries, contracts, staff training, travel, stationery, printing, departmental accommodation, <abbr title="et cetera">etc</abbr>.</td> </tr> <tr> <td>Vote&nbsp;10</td> <td>(Grants and Contributions) also called Transfer Payments, the means by which <abbr title="Aboriginal Affairs and Northern Development Canada">AANDC</abbr> funds the operations of First Nations and other recipients.</td> </tr> </tbody> </table> </section> <!-- ANNEX E END --> <aside class="wb-fnote" role="note"> <section> <h2 id="fn">Footnotes</h2> <dl> <dt>Footnote 1</dt> <dd id="fn1"> <p>Allocated at regional level based on a formula that estimates the cost of operating and maintaining assets.</p> <p class="fn-rtn"><a href="#fn1-rf"><span class="wb-inv">Return to footnote </span>1<span class="wb-inv"> referrer</span></a></p> </dd> <dt>Footnote 2</dt> <dd id="fn2"> <p>Established by using a formula that considers multiple variables such as: population, geographic remoteness, and actual costs of operating and maintenance of assets. The formula and allocation methodology varies among regions. In all cases these funds are allocated directly to the First Nations giving them discretion on how they apply the funds to meet their infrastructure and housing needs.</p> <p class="fn-rtn"><a href="#fn2-rf"><span class="wb-inv">Return to footnote </span>2<span class="wb-inv"> referrer</span></a></p> </dd> </dl> </section> </aside> <!-- START PAGE FEEDBACK WIDGET --> <div class="row row-no-gutters mrgn-tp-xl"> <div class="col-sm-7 col-lg-6"> <section class="gc-pg-hlpfl provisional"> <div class="well mrgn-bttm-0"> <form id="gc-pg-hlpfl-frm" action="#" method="post" autocomplete="off"> <input type="hidden" name="institutionopt" value="Institution acronym - required - must use same value EN and FR"> <input type="hidden" name="themeopt" value="Indigenous peoples"> <input type="hidden" name="language" value="Language - required - use EN or FR"> <input type="hidden" name="pageTitle" value="Page title EN - required"> <input type="hidden" name="submissionPage" value="Page URL - required"> <input type="hidden" name="sectionopt" value=""> <input type="hidden" id="helpful" name="helpful" value="Yes"> <div class="gc-pg-hlpfl-btn"> <div class="row row-no-gutters"> <div class="col-xs-12 col-sm-7 mrgn-tp-sm"> <h2 class="mrgn-tp-sm h5">Did you find what you were looking for?</h2> </div> <div class="col-xs-8 col-sm-5 text-right"> <button id="btnyes" type="submit" value="Yes" class="btn btn-primary">Yes</button> <button id="btnno" type="button" class="btn btn-primary mrgn-lft-sm nojs-hide">No</button> </div> </div> </div> <p class="h3 hidden nojs-show">If not, tell us why:</p> <div class="gc-pg-hlpfl-no nojs-show"> <fieldset> <legend class="h4 mrgn-tp-0 mrgn-bttm-md">What was wrong?</legend> <div class="radio"> <label for="problem1"> <input name="problem" id="problem1" type="radio" value="I can't find the information" data-gc-analytics-wtph-value="I can't find the information-Je ne peux pas trouver l'information" data-gc-analytics-collect="notPrivate"> I can't <strong>find</strong> the information </label> </div> <div class="radio"> <label for="problem2"> <input name="problem" id="problem2" type="radio" value="The information is hard to understand" data-gc-analytics-wtph-value="The information is hard to understand-L'information est difficile à comprendre" data-gc-analytics-collect="notPrivate"> The information is hard to <strong>understand</strong> </label> </div> <div class="radio"> <label for="problem3"> <input name="problem" id="problem3" type="radio" value="There was an error / something didn't work" data-gc-analytics-wtph-value="There was an error or something didn't work-Il y avait une erreur ou quelque chose ne fonctionnait pas" data-gc-analytics-collect="notPrivate"> There was an error or something <strong>didn't work</strong> </label> </div> <div class="radio"> <label for="problem4"> <input name="problem" id="problem4" type="radio" value="Other reason" data-gc-analytics-wtph-value="Other reason-Autre raison" data-gc-analytics-collect="notPrivate"> Other reason </label> </div> </fieldset> <label for="problem6" class="mrgn-bttm-0">Please provide more details</label> <p class="small"> <strong>You will not receive a reply. Don't include personal information (telephone, email, SIN, financial, medical, or work details).</strong> <br> <span class="small">Maximum 300 characters</span> </p> <textarea id="problem6" name="details" class="full-width" maxlength="300"></textarea> <button type="submit" value="No" class="btn btn-primary mrgn-tp-md mrgn-bttm-sm">Submit</button> </div> </form> <div class="gc-pg-hlpfl-thnk hide"> <p class="h6 mrgn-tp-sm mrgn-bttm-sm"><span class="far fa-check-circle text-success mrgn-rght-sm" aria-hidden="true"></span> Thank you for your feedback</p> </div> </div> </section> </div> <div class="col-sm-3 col-sm-offset-1 col-lg-offset-3"> <!-- <div class="wb-share" data-wb-share="{&quot;pnlId&quot;:&quot;pnlShrPg&quot;, &quot;lnkClass&quot;: &quot;btn btn-default btn-block mrgn-tp-md&quot;}"></div> --> </div> </div> <!-- END PAGE FEEDBACK WIDGET --> <div id="def-preFooter"> <!-- Write closure fall-back static file --> <div class="row pagedetails"> <div class="col-sm-5 col-xs-12 datemod"> <dl id="wb-dtmd"> <dt>Date modified:&#32;</dt> <dd> <time property="dateModified">2015-12-17 </time> </dd> </dl> </div> </div> </div> <!-- Write closure template --> <script type="text/javascript"> var defPreFooter = document.getElementById("def-preFooter"); defPreFooter.outerHTML = wet.builder.preFooter({ cdnEnv: "prod", dateModified: "2015-12-17", showPostContent: true, showFeedback: false, showShare: false }); </script> </main> <div id="def-footer"> </div> <!-- Write closure template --> <script type="text/javascript"> var defFooter = document.getElementById("def-footer"); defFooter.outerHTML = wet.builder.footer({ cdnEnv: "prod", "contextualFooter": { "title": "Indigenous Services Canada", "links": [{ "text": "Contact us", "href": "/eng/1291132820288" }, { "text": "News", "href": "https://www.canada.ca/en/news/advanced-news-search/news-results.html?_=1583265230614&dprtmnt=indigenousservicescanada&start=&end=" }] } }); </script> <!-- Write closure template --> <script type="text/javascript"> document.write(wet.builder.refFooter({ cdnEnv: "prod", })); </script> <!-- WCMS:TOOLBAR --> <link href="/DAM/PresentationDAM/STAGING/invitation-manager/Overlay.css" rel="stylesheet" type="text/css"> <script src="/DAM/PresentationDAM/STAGING/invitation-manager/Overlay.js"></script> <script src="/DAM/PresentationDAM/STAGING/invitation-manager/InvitationManager.js"></script> <!-- siteimprove --> <script async src=https://siteimproveanalytics.com/js/siteanalyze_75993.js></script> <!-- siteimprove ends --> <script src="/DAM/PresentationDAM/STAGING/Scripts/feedback-widget.js"></script> </body> </html>

Pages: 1 2 3 4 5 6 7 8 9 10