CINXE.COM

About Methods of Additional Mining Pressure Figuring while Reconstruction of Tunnels

<?xml version="1.0" encoding="UTF-8"?> <article key="pdf/12507" mdate="2013-06-23 00:00:00"> <author>M. Moistsrapishvili and I. Ugrekhelidze and T. Baramashvili and D. Malaghuradze</author> <title>About Methods of Additional Mining Pressure Figuring while Reconstruction of Tunnels</title> <pages>455 - 458</pages> <year>2013</year> <volume>7</volume> <number>6</number> <journal>International Journal of Civil and Environmental Engineering</journal> <ee>https://publications.waset.org/pdf/12507</ee> <url>https://publications.waset.org/vol/78</url> <publisher>World Academy of Science, Engineering and Technology</publisher> <abstract>At the end of the 20th century it was actual the development of transport corridors and the improvement of their technical parameters. With this purpose, many countries and Georgia among them manufacture to construct new highways, railways and also reconstructionmodernization of the existing transport infrastructure. It is necessary to explore the artificial structures (bridges and tunnels) on the existing tracks as they are very old. Conference report includes the peculiarities of reconstruction of tunnels, because we think that this theme is important for the modernization of the existing road infrastructure. We must remark that the methods of determining mining pressure of tunnel reconstructions are worked out according to the jobs of new tunnels but it is necessary to foresee additional mining pressure which will be formed during their reconstruction. In this report there are given the methods of figuring the additional mining pressure while reconstruction of tunnels, there was worked out the computer program, it is determined that during reconstruction of tunnels the additional mining pressure is 13rd of main mining pressure.</abstract> <index>Open Science Index 78, 2013</index> </article>